Text
. _ -. _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - - _ _ _
n Ct%
k p
UNITED STATES y
,j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2066M201
'4,.....
Oct.ober 7,1997 ORGAN!ZATION: Nuclear Energy Institute (NEI)
SUBJECT:
SUMMARY
OF MEETING WITH NEl REGARDING NEl'S GUIDELINE FOR IMPLEMEN~. LNG THE LICENSE RENEWAL RULE On September 24,1997, representatives of NEl met with the Nuclear Regulatory Commission (NRC) staff to disuss future industry activities associated with development of the NEl
" Industry Guideline for implementing the Requirements of 10 CFR Part 54 The License Renewal Rule," NEl 95-10. The staff proposed tc endorse NEl 95-10 as an acceptable approcch for implementing the license renewal rule in its Draft Regulatory Guide, " Standard Format and Content for Applications to Renew Nuclear Power Plant Operating Licenses,"
DG-1047. A list of meeting attendees is provided in Attachment 1.
The meeting was requested by NEl to discuss with the staff its plans for revising NEl 95-10 and to address a number of the topics that need additional guidance. The importance of NEl 95-10 to the industry was reiterated by NEl, particularly for the licensees that will follow the two licensees, Baltimore Gas & Elect,1c (BG&E) and Duke Power Company (Duke), cuirently submitting license renewal technical reports for staff review, As discussed in the Commission paper, SECY-97-118, dated June 5,1997, the staff determined that the experience to be gained from the review of plant specific and owners group technical reports is needed before guidance can be develeped on a number of significant issues that have been identified.
However, NEl expressed interest in continuing to interact with the NRC staff on selected isw s for which guidance may be developed without the need for additional review experience. The following topics were identified by NEl as areas where the industry may pursue guidance development:
((/
A.
Revision of NEl 95-10, Section 6, " Renewal Opercting License Application Format and Content," using feedback from the BG&E and Duke reviews.
I B.
Identification of an acceptable approach for listing structures and components in the h
application C.
Clarification of when evaluation of time-limited aging analyses may be deferred D.
Identification of unresolved safety issues and generic safety issues requiring review for license renewal E.
Definition of the level of detail required to describe aging management programs and for ~
the finr.li:afety analysis report supplement
()g g (
ll!'IllllillBll!IIl PDR REVGF ERGNUMRC 97~ N 9710090173 971007
=
1 3'
g %f % s-PDR
%dy
t 2-1 F.
Resolution of aging management review requirements for botting, gaskets, packing, and seals G.
Clarification of the use of operating experience The staff agreed that these topics had previously been identified as needing additional guidance and intends to address them in its development of the license renewat standard review plant (LR SRP) and regulatory guide (RG) as experience is gained. NEl was requested to inform the staff of its plans for (1) identifying and documentitig positions as they are established in the ongoing reviews, (2) developing and submitting proposed guidance to the sterf, and (3) establishing a system to trach needed revisions to NEl 95-10. The staff is also developing its process to track and incorporate into the LR-SRP and RG positions that are established during its ongoing reviews.
NEl indicated that its license renewal task force responsible for NEl 9510 plans to meet approximately every 4 to 6 weeks to begin addressing these topics. BG&E and Duke will use this forum to keep the industry informed of their plant specific review experience and to discuss positions being taken. The NRC staff agreed to conduct public meetings with NEl on a similar schedule to present experience ga'ned, positions established, and potential revisions to NEl 95-10. However, as stated to the Commission in SECY 97-118, the staff intends to focus its resources on toe review of BG&E and Duke technical reports and owners group reports being referenced by BG&E and Duke.
The staff also identified the following documents that have been or are in the process of being issued that contain implementation guidance:
A.
September 19,1997, staff letter to NEl regarding determination of aging management review for electrical components.
B.
September 24,1997, staff letter to NEl regarding the status of the structures action plan and review of NEl 96-03, " Industry Guideline for Monitoring the Condition of Structures at Nuclear Power Plants."
C.
NUREG-1611," Aging Management of Nuclear Power Plant Containments for License Renewal,"is approved and is being published.
D.
Revised working draft LR-SRP sent to the NRC's Public Document Room by memorandum dated September 21,1997.
The staff intends to use the revised working draft LR-SRP as an aid in reviewing license renewal submittals. During the reviews, staff, licensees, owners groups, and other interested pardes may identify technica! and procedural issues. However, the staff is not soliciting
4 3-comments on the working draft. Public comments will be officially requested in the Federal Register when the draft LR SRP is issued. The working draft LR SRP is intended to be a living document that *.he staff will revise as it gains review experience. At appropriate times, the staff plans to correspond with NEl and arrange public meetings to address the generic aspects of both the technical and procedural issues and possible changes to NEl 9510.
l A
N
==
l Stephen T. Hoffman, Senior Project Manager License Renewal Project Directorate Olvision of Reactor Program Management Office of Nuclear Reactor Regulation Project 690 j
Attachment:
As stated cc w/atts: See next page
=
i NUCLEAR ENERGY INSTITUTE (NEl)
Project No. 690 cc:
Mr. Dennis Harrison U.S. Department of Energy NE 42 Washington, DC 20585 Mr. Douglas J. Wahors Nuclesr Energy Institute
- 1776 l Street NW Suite 300 Washington, DC 20006 Mr. Richard P. Sedano, Commissioner State Liaison Officer State of Vermont Department of Public Service 112 State Street Drawer 20
- Montpelier, Vermont 05620 2601 i
i l
I l
e i:
ATTENDANCE LIST I
NRC MEETING WITH THE NUCLEAR ENERGY INSTITUTE SEPTEMBER 24.1997 NAME ORGANIZATION 1.
Steve Hoffinan NRC/DRPM/PDLR 2,
Paul Shemanski tmuuE/EELB 3.
Bill MacKay Entergy 4.
Robert Gill Duke Energy 5.
B.W. Doroshuk BGE 6.
R. D. Baker Southern Nuclear 7.
Doug Walters NEl 8.
Fred Polaski Peco Energy 9.
Jenny Weil McGraw Hill
- 10. David Roth VA Power
- 11. Lynn Connor Doc Search
- 12. Terry Pickens Northern States Power Co.
- 13. Don Eggett comed
- 14. Alice Carson Bechtel Power
- 15. Tricia Heroux for EPRI-.
- 16. John Carey EPRI
- 17. David Masiero GPU Nuclear
- 18. Michael Henig VA Power
- 19. Bob Prato NRC/DRPM/PDLR
- 20. David Solorio NRC/DRPM/PDLR
- 21. Jerry Dozier NUS Information Services
- 22. Raj Anand NRC/DRPM/PDLR
- 23. Jit Vora NRC/RES/DET
- 24. Richard E. Johnson NRC/RESIDET
- 25. Hal-Bob Wang NRC/DRPM/PDLR
- 26. Sam Lee NRC/DRPM/PDLR
- 27. C. l. Grimes NRC/DRPM/PDLR
, ~ _. _.
0 t
3 comments on the working draft. Public comments will be officially requested in the Federal Begister when the draft LR-SRP is issued. The working draft LR.SRP is intended to be a living document that the staff will revise as it gains review experience. At appropriate times, the staff plans to correspond with NEl and arrange public meetings to address the generic aspects of both the technical and procedural issues and possible changes to NEl 9510.
Original signed by:
Stephen T. Hoffman, Senior Project Manager License Renewal Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Project 690
Attachment:
As stated cc w/atta: See next page DOCUMENT NAME: A:\\NEl0924.MTS To receive e topo of thee document. inchcote in the bos' 'C' = Copy without attachment' enclosure
'E' = Cope with attachmentienclosure "N* = No copy OFFICE SPM:PDLRggl 6 D:PDLR A,16 l
l NAME SHof,' manic 6 ' '
CGrimes/ /,4 DATE 10/2497 10/(d97 W' OFFICIAL RECORD COPY
DISTRIBUTION w/ attachment:
Central File )
PUBLIC PDLR R/F ACRS OEDO RIV Coordinator 017 G21 Ehiall SCollins/FMiraglial(SJC1/FJM)
RZimmerman (RPZ)
JRoe (JWR)
DMatthews (DBM)
SMeador (SAM)
CGrimes (CIG)
RCorreia (RPC) l RWessman (RHW)
JStrosnider (JRS2)
SDroggitis (SCD) l SPeterson (SRP)
GLainus (GCL)
JCraig (JWC1)
JVora (JPV)
JMoore (JEM)
GMizuno (GSM)
Gilolahan (GMH)
(
BSheron (BWS)
MMayfield (MEM2)
AMurphy (AJM1)
HBrammer (HLB)
LShao (LCS1)
GBagchi(GXB1)
PShemanski(PCS)
BMorris (BMM)
HBerkow (HNB)
SBajwa (SSB1)
ADromerick (AWD)
DLaBarge (DEL)
WGleaves (BCG)
PDLR (staff)
' : ?)
e