Text
. - -.-
Y
'l 0
\\ bC%
[
UNITED STATES j
NUCLEAR REGULATORY COMMISSION 2
WASHINoToN, o.C. 2056A001 k..g..*/
j October 3, 1997 l
Mr. Nicholas J. Liparulo, Manager Nuclear Safety and Regulatory Analysis Nuclear and Advanced Technology Division Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, PA 15230
SUBJECT:
RESPONSE TO WESTINGHOUSE LETTER DATED SEPTEMBER l',
1997, REGARD-i ING INSPECTION N0. 99900404/97-01
REFERENCE:
NRC LETTER TO WESTINGHOUSE DATED JULY 29, 1997, " RESPONSE TO WESTINGHOUSE LETTER DATED JUNE 9, 1997, REGAR0 LNG INSPECTION REPORT NO. 99900404/97-01"
Dear Mr. Liparulo:
The Nuclear Regulatory Commission (NRC) staff has reviewed your September 12, 1997, letter which supplements your June 9, 1997, and August 21, 1997, letter in response in NRC Inspection Report No. 99900404/97-01, dated May 2, 1997.
While the NRC staff finds that your reply is responsive to the nonconformances identified in our inspection report Westinghouse still needs to provide for NRC review, on the docket, the results of the "AP600 F0AKE Design Assurance Review" before final closure can be achieved on the unresolved item.
Once this information has been received, we will review the nature and significance of issues identified and inform you if additional information will be required before our final closeout inspection of the AP600 design certification activities. During this inspection, we will confirm that proposed corrective actions have been effectively implemented to achieve full compliance with the-provisions of Appendix B to 10 CFR Part 50 and 10 CFR Part 52.
We will inform you as soon as por.sible when a date for the final inspection has been estab-lished.
The staff currently does not anticipate a need to conduct a separate meeting on this matter.
If you have any questions regarding this matter, you may contact i
Mr. William Huffman, AP600 project manager, at (301) 415-1141.
IJ Sincerely, j
hflh f
hp, A
Suzannel. Black, Chief C
Quality Assurance, Vendor Inspection, and Maintenance Branch 9710090149 971003 Division of Reactor Controls PDR GA999 ENVWEST and Human Factors 999004o4 PDR Office of Nuclear Reactor Regulation pt,
Docket No.52-003 iCidc [ [ %} p [ y & }+ @ il @
n --
cc: See next page I
l l
I l
i i
Mr. Nicholas J. Liparulo Docket No.52-003 i
Westinghouse Electric Corporation AP600 cc: Mr. B. A. McIntyre Mr. Russ Bell Advanced Plant Safety & Licensing Senior Project Manager, Programs Westinghouse Electric Corporation Nuclear Energy Institute Energy Systems Business Unit 1776 1 Street, NW P.O. Box 355 Suite 300 Pittsburgh, PA 15230 Washington, DC 20006-3706 I
Mr. Cindy L. Haag Ms. Lynn Connor Advanced Plant Safety & Licensing Doc-Search Associatta 1
Westinghour? Electric Corporation Post Office Box 34 Ene4g/ Systen.3 Business Unit cabin John, MD 20818 Box 355 Pittsburgh, PA 15230 Dr. Craig D. Sawyer, Manager Advanced Reactor Programs Mr. Sterling Franks GE Nuclear Energy l
U.S. Department of Energy 175 Curtner Avenue, MC-754 NE-50 San Jose, CA 95125 19901 Germaritown Road Idaho Falls, ID 83415 Germantown, MD 20874 Mr. Robert H. Buchholz Mr. Frank A. Ross GE Nuclear Energy U.S. Department of Energy, NE-42 175 Curtner Avenue, MC-781 Office of LWR Safety and Technology San Jose, CA 95125 19901 Germantown Road l
Germantown, MD 20874 Barton Z. Cowan, Esq.
Eckert Seamans Cherin & Mellott Mr. Charles Thompson, Nuclear Engineer 600 Grant Street 42nd floor AP600 Certification Pittsburgh, PA 15219 NE-50 19901 Germantown Road Mr. Ed Rodwell, Manager Germantown, MD 20874 PWR Design Certification Electric Power Research Institute 3412 Hillview Avenue Palo Alto, CA 94303 Y
.+-
,m=y-
,,w,,,_,,,,,-e,-
ny
-we vy--
-,-rw
-g-c.-n--,
~-n-
.w--
r-
+
\\
DISTRIBUTION:
Letter to Nicholas J. Lioarulo. Dated:
October 3, 1997 Docket File PUdllC PDST R/f DMatthews JRoe TQuay TKenyon Bituffman JSebrosky JNWilson DScaletti JMoore, 0-15 Bl8 WDean, 0-5 E23 ACRS (11)
JPeralta, 09-Al RGramm, 09-Al RPettis. 09-D4 GCwalina, 09-04 SBlack, 09-Al LSpessard. 09-E4 l
l
f.N UNITED STATES N
j NUCLEAR REGULATORY COMMISSION i
o WA8HINoTON, o.C. 20!414 001 October 3, 1997 Hr. Nicholas J. Liparulo, Manager Nuclear Safety and Regulatory Analysis Nuclear and Advanced Technology Division Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, PA 15230
SUBJECT:
RESPONSE TO WESTINGHOUSE LETTER DATfD SEPTEMBER 12, 1997, REGARD-ING INSPECTION N0. 99900404/97-01
REFERENCE:
NRC LETTER TO WESTINGHOUSE DATED JULY 29, 1997, " RESPONSE TO WESTINGHOUSE LETTER DATED JUNE 9, 1997, REGARDING INSPECTION REPORT NO. 99900404/97-01"
Dear Mr. Liparulo:
The Nuclear Regulatory Commission (NRC) staff has reviewed your September 12, 1997, letter which supplement your June 9, 1997, and August 21, 1997, letters in response to NRC Inspection Report No. 99900404/97-01, dated May 2, 1997.
While the NRC staff finds that your reply is responsive to the nonconformances identified in our inspection report, Westinghouse still needs to provide for NRC review, on the docket, the results of the "AP600 F0AKE Design Assurance Review" before final closure can be achieved on the unresolved item.
Once this information has been received, we will review the nature and significance of issues identified and inform you if additional information will be required before our final closecut inspection of the AP600 design certification activities.
During this inspection, we will confirm that proposed corrective actions have been effectively implemented to achieve full compliance with the provisions of Appendix B to 10 CFR Part 50 and 10 CFR Part 52.
We will inform you as soon as possible when a date for the final inspection has been estab-lished.
The staff currently does not anticipate a need to conduct a separate meeting on this matter.
!f you have any questions regarding this matter, you may contact Mr. William Huffman, AP600 project manager, at (301) 415-1141.
Sincerely, un
.C %A SuianneC. Black, Chief l
Quality Assurance, Vendor Inspection, and Maintenance Branch Division of Reactor Controls and Human Factors Office of Nuclear Reactor Regulation Docket No.52-003 cc:
See next page
i Mr. Nicholas J. Liparulo Docket No.52-003 Westinghouse Electric Corporation AP600 cc: Mr. B. A. McIntyre Mr. Russ Bell Advanced Plant Safety & Licensing Senior Project Manager, Programs Westinghouse Electric Corporation Nuclear Energy Institute Energy Systems Business Unit 1776 I Street, NW P.O. Box 355 Suite 300 Pittsburgh, PA 15230 Washington, DC 20006-3706 l
Mr. Cindy L. Haag Ms. Lyni 'onnor Advanced Plant Safety & Licensing Doc-Sea u Associates W',stinghoun Electric Corporation Post Office Box 34 inergy Systems Business Unit Cabin John, MD 20018 Box 355 Pittsburgh, PA 15230 Dr. Craig D. Sawyer, Manager Advanced Reactor Programs Mr. Sterling Franks GE Nuclear Energy U.S. Department of Energy 175 Curtner Avenue, MC-754 NE-50 San Jose, CA 95125 19901 Germantown Road Idaho Falls, 10 83415 l
Germantown, MD 20874 Mr. Robert H. Buchholz Mr. Frank A. Ross GE Nuclear Energy U.S. Department of Energy, NE-42 175 Curtner Avenue, MC-781 Office of LWR Safety and Technology San Jose, CA 95125 19901 Germantown Road Germantown, MD 20874 Barton Z. Cowan Esq.
Eckert Seamans Cherin & Mellott' Mr. Charles Thompson, Nuclear Engineer 600 Grant Street 42nd Floor AP600 Certification Pittsburgh, PA 15219 NE-50 19901 Germantown Road Mr. Ed Rodwell, Manager Germantown, MD 20874 PWR Design Certification Electric Power Research Institute 3412 Hillview Avenue Palo Alto, CA 94303
i DISTRIBUTION:
Letter to Nicholas J. Lioarulo. Dated:
October 3,1997 Docket File PUBLIC PDST R/f DMatthews JRoe TQuay TKenyon BHuffman JSebrosky JNWilson DScaletti JHoore, 0-15 B18 WDean, 0-5 E23 ACRS (11)
JPeralta, 09-Al RGramm, 09-Al RPettis, 09-04 GCwalina, 09-04 SBlack, 09-Al LSpessard 09-E4