Forwards Third Ten-YR IST Program for SR Pumps & Valves in Response to 970904 Telcon.Addl Relief Will Be Required
ML20211J291
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 10/01/1997
From: Cruse C
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20211J295 List:
References
NUDOCS 9710080057
Download: ML20211J291 (2)


Text

5 u

l t i d

Cuantra H. CausE Baltiinore Oas and Electric Cornpany 1

Vice President Calvert Chfts Nuclear Power Plant

=

Fuclear Energy 1650 Cahert Cliffs Pa:Lway Lusby,. Maryland Ab57 410 495-1455 1

kl October 1,1997 y

4

]gl U. S. Nuclear Regulatory Commission Washington, DC 20555 j

-il ATTENTION:

Document Control Desk j

'2

SUBJECT:

Calvert Cliffs Nuclear Power Plant j

Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318

]

Response to Questions on the Third Ten Year Inservice Test Program for

=!

Safety-Related Pumns and Valves 3

REFERENCES:

(a)

Letter from Mr. C. H. Cruse (BGE) to Document Control Desk (NRC),

f dated April 30,1997, Third Ten Year Inservice Test Program for Safety-i Related Pumps and Valves i

4'il (b)

Telephone Conference between BGE and NRC held on

]

September 4,1997 j

ii Reference (a) submitted our Third Ten-Year Inservice Test Program for Safety-Related Pumps and j

Valves. The updated program is currently schedu'ed to take effect on January 15,1998. In a telephone i

conference on September 4,1997 (Reference b), the Nuclear Regulatory Commission asked several 4

questions about the updated program. Answers to those questions are provided below.

5 The cold shutdown justification for 1/2-SW-5149-CV (CSJ-44) has been revised based on your i

comments in Reference (b). Also based on your comments, we have reviewed Pump Relief Request 1

(PR)-07 an.' decided to withdraw it.

=

il In addition to the items discussed in Reference (b), we reevaluated our pressure isolation valves and Valve Relief Request (VR)-04. We have determined the valves discussed in VR 04 are not pressure

_Q isolation valves. We are withdrawing VR-04.

d E

As we noted in reference (b), we have concluded that an additional relief request (VR-13) will be i

required, it is related to the testing of the pre sturizer safety valves. We are submitting the additional j

relief request for your review and approval. We request that the review and approval of VR-13 not

,k 3

impact approval of the remaining relief requests in the Third Ten-Year Inservice Test Program. Because f

??10000057 971001 5

PDR ADOCK 05000317 i gg

\\,\\

g

?

P PDR l

Document Control Desk -

October 1,1997 Page 2 VR-13" is associated with the Unit 1 1998 Refueling Outage, we would like it approved by March 2,~ 1998.

In order to simplify updating your records, we are providing a revised copy of the Third Ten Year Inservice Test Program Plan. It supersedes the version provided in Reference (a). Please note that we have revised the appropnate pages to be consistent with the changes discussed above.

Should you have questions regarding this matter, we will be pleased to discuss them with you.

Very truly yours,

  1. ~

for C.11. Cruse Vice President - Nuclear Energy C11C/JMO/bjd

Attachment:

(1) Pump and Valve Inservice Testing Program Third Ten Year Interval for Calvert Cliffs Nuclear Power Plant Units 1 and 2, Revision I cc:

- (With Attachment)'

A. W, Dromerick, NRC L

(Without Attachment)

R. S. Fleishman, Esquire Resident inspector, NRC J. E. Silberg, Esquire R.1. McLean, DNR Director, Project Directorate 1-1, NRC J.11. Walter, PSC

11. J. Miller, NRC w