ML20211H704

From kanterella
Jump to navigation Jump to search
Documents That Modified Diesel Generator Load Sequence Timers Resulting from Diesel Generator Load Analysis Corrective Action Will Be Included in FSAR Update & Plant Surveillance Instructions,Per 870121 Meeting W/Nrc
ML20211H704
Person / Time
Site: Sequoyah  
Issue date: 02/13/1987
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To: Youngblood B
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
NUDOCS 8702260260
Download: ML20211H704 (2)


Text

_-

-p TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 374o1 SN 157B Lookout Place FEB 131987 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Office of Nuclear Reactor Regulation Washington, D.C.

20555 Attention:

Mr. B. J. Youngblood In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT - DIESEL GENERATOR (D/G) LOADING SEQUENCE

'! ihe purpose of this letter is to document that the modified D/G load sequence timers and random load enable timers which resulted from the D/G load analysis corrective action will be included in the Sequoyah Final Safety Analysis Report (FSAR) and plant surveillance instructions. A commitment to perform this action was discussed with B. J. Youngblood during a TVA and NRC meeting in Bethesda, Maryland, on January 21, 1987.

Physical modification of the D/G loading sequence is currently being performed. This modification precludes potential D/G overloading following a loss of offsite power concurrent with a safety injection and phase B containment isolation.

The FSAR will be revised to reflect this modification in the first annual FSAR update following completion of the modification. This will probably be the 1988 annual update. The plant surveillance instructions will be revised by unit 2 restart.

Please direct questions you may have concerning this issue to M. K. Brandon at (615) 870-7619.

Very truly yours, TENNESSEE VALLEY AUTHORITY W

~

. Gridley, Director Nuclear Safety and Licensing cc: See page 2 Ao0\\

\\

\\

t 87022g2 f

D 5

PDR An Equal Opportunity Employer

a e FEB 131987 U.S. Nuclear Regulatory Commission cc:

U.S. Nuclear Regulatory Commission Region II Attn:

Dr. J. Nelson Grace, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. J. J. Holonich Sequoyah Project Manager U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland.20814 Mr. G. G. Zech, Director TVA Projects U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37319 1

l

.. -...... - - - -.. ~, - -, - - _ - -...,,., - _.,

.. _ ~,.. - -,. -. - - - -.

-