at p
o UNITED STATES
{
g NUCLEAR REGULATORY COMMISSION L
j WASHINGTON, D. C. 20555
%,,,,,+
October 30, 1986 Docket No. 99900768/86-01 Westinghouse Hittman Nuclear, Inc.
ATTN: Mr. Bruce Rowe Quality Assurance Manager 9151 Rumsey Road Columbia, Maryland 21045 Gentlemen:
This refers to the inspection conducted by Ms. C. Abbate and Mr. R. McIntyre of this office on September 8-10, 1986, of your facility in Columbia, Maryland and to the discussions of our findings with you and members of the staff at the conclusion of the inspection.
The purpose of this inspection was to review Westinghouse Hittman Nuclear, Inc.
activities related to 10 CFR Part 71 and 10 CFR Part 21 with respect to transpor-tation casks.and follow-up on previous NRC inspection findings. Areas examined during the inspection and our findings are discussed in the enclosed report.
Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspectors.
During the inspection it was found that the implementation of your Quality Assurance (QA) program failed to meet certain NRC requirements. Of particular concern were weaknesses identified in the audit system and the failure to properly implement the Corrective Actica Memo (CAM) system. Other weaknesses
.were noted in that 10 CFR Part 21 had not been imposed on the suppliers of replacement gaskets and 0-rings. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.
The enciesed Notice of Violation is sent to you pursuant to the provisions of Section 206 of the Energy Reorganization Act of 1974. You are required to j
submit to this office witnin 30 days from the date of this letter a written statement containing:
(1) a description of steps that have been or will be t
taken to correct these items; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the dates-your corrective actions and preventive measures were or will be completed. Consideration may be given to extending your response time for good cause shown.
t i
8611040330 861030 PDR GA999 EMVWHIT 99900768 PDR
s Westinghouse Hittman Nuclear, Inc. October 30, 1986 The responses requested by this letter are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, o
Robert F. Heishman, Chief Vendor Program Branch Division of Quality Assurance, Vendor and Technical Training Center Programs Office of Inspection and Enforcement
Enclosures:
1.
Appendix A-Notice of Violation 2.
Appendix B-Inspection Report No. 99900768/86-01 3.
Appendix C-Inspection Data Sheets (5 pages) cc w/ enclosures:
Nuclear Packing Incorporated ATTN: Mr. Joe Olivadoti Quality Assurance. Manager 1010 South 336th Street Federal Way, Washington 98003 Riteway Machine and Specialty Company, Inc.
ATTN: Mr. R. L. (Bob) Kilgus Quality Control Manager i
Post Office Box 948 Barnwell, South Carolina 29812 l
i
=
~-
Westinghouse Hittman Nuclear, Inc.- October 30,.1986 DISTRIBUTION:
E VPB 'Re'ading DQAVT Reading RStarostecki BGrimes HMiller RHeishman
-CMacDonald, NMSS JCraig JStone LParker RMcIntyre CAbbate i
i plWCraig
[
C/VPB:DQAVT BC/V :DQAVT i
VPB: AVT d
J RFHeishman CAbbate: sam 10 g 86 10/ R 86 10
/86 l
-