ML20211G707

From kanterella
Jump to navigation Jump to search
Mod 39,extending Period of Performance to 860930,to Licensing Technical Assistance
ML20211G707
Person / Time
Issue date: 06/12/1986
From: Edgeworth P, Muzio B
NRC OFFICE OF ADMINISTRATION (ADM), SCIENCE APPLICATIONS INTERNATIONAL CORP. (FORMERLY
To:
Shared Package
ML20211G704 List:
References
CON-NRC-02-83-035, CON-NRC-2-83-35 NUDOCS 8606200095
Download: ML20211G707 (2)


Text

4.conTm AcT to coOE F

E AMEfNDMENT CF SOLICITATION / MODIFICATION CF CONTRACT orPpeEs t

l

2. awe NowE NT /maOO F.C A1 ON NO.

3 Es F Ect avt DAlt s a t Gv.

t s< v se c M 5 N ci.

s PROJEci NO tit earsar e6 ar,

39 ggy NMS dt 9

s. tSS eED ev

[-

/

r. AOwiNiSit R E D S v sit erner egen stem es l

US Nuclear Regulatory Comission Division of Contracts Washington, DC 20555

8. N AME AND ADDRE5h OF CONT R ACT OR (No, et vet county. S tate and 2# Codes p

9A. AVE NOMENT OF SouC ai Al EON NO.

Science Applications International Corporation 9e DAnO<su m u28, P.O. Box 1303 McLean, VA 22l02 loa. oOOiF.C ATiON OF CONTR ACTmRDER X

f!RC-02-83 r)35 loe OAT LO ISLE ITEN JJi e

CODE lF ACILITY CODE I/2l/83 11 THIS ITEM ONLY APPLIES TO AME NDMENTS OF SOLICIT ATIONS The aboa namee a: scheitat on is amenoe: as set forth in ite+ 14 The hos and cate spe:.f e: for rew pt of Ct*e's is en te,see.

is not e.

O*e s m.s e:m now e:pe *ere, t c' t s e ename t p.0 t: tM hos an: sa e s:w: f.e: r the schotat.o c es ame >:e: ts one *tN *: w ;eneinocs to Es ecveta; lie s E e, 15 eso rets mn; copies o' tne amen:me-t te: E s a:anowec; n; 'e:e et c' t%s amen:-e t e ea-coe. c' tte c"e' e

sse m tr2: o- (:' E, sese ste lette o te e; aan ww in:sroes a re'e ence 1: tne sch: tat.or one ame% cme t numbe s F AtuRE or v0. Act:NOA E %

MENT TO BE RECEIVED AT THE PLACE DEstGNATED FOR THE RECEIFT OF OFFE As PRIOR TO THE HOUR AND DATE SPEC'EtED MAY AE54 LN kEJE CTION OF Y OUR oF F E R. It e, vetve o' t as amensment vow oes re te etempe an of+e ameac, s2%ttec.sve* change mas De mee be te e;*a c-42tte. provisec as:*. te.e; em or letie maaes re'e ence to the schcitat.on e,C tNs amencrnent, e,c is rece va: pw t: the opening how a,: cate spec Asc

12. ACCovNT NG AND APPR P I ATION DAT A (1/ rega.wd) 13.THIS ITEM APFLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS.

IT MODIFIES THE CONTR ACT/ ORDER NO. AS DESCRIBED IN ITEY 14 g

T M'b cM ANGE OR DE si 45 855 0L O PV R5 s ANT T O. ($pec;f> si tno-st> p T ME CM ANG ES SET F O R T M eN ITEM 14 ARE M ADE tN TME CON-A T R ACT ORDER NO. tN IT EM 10A.

D. THE ASQvE NUUSERED CONTR ACT/OROER 15 MOOlFIED TO REFLECT THE AOMINISTR ATIVE CHANGES esuch as chantes an ps>ing offect approp serion date etc ) SET FORTH IN ITEM 14. PUR50 ANT TO TME AUTHORITY OF FAR 43103(D)

C. TMI5 5UPP EWENT AL AG REEMENT t$ ENTEREP INTO PvR5UANT TO AUTMORtTV OF t X

mutual agreement of the parties.

c. O i M E R espe ce> t> re c f m od6ce rno n and ae rna sr> >

3 E. IMPORTANT: Contra tor is not,

  • is required to sg, this dOCu nent and return Co:nes to the issu n; Off6ce av. DESC R PTiON OF AMENOMENT/WOOtFIC ATsON (Orroqued by UCT arction headings, encludms solacatation/controcs autvect matte. nhere feaubie.i This Supplemental Agreenent is issued to extend the contract performance period and to extend the completion dates for task 004 and task 015 at no additional cost to the Government. Accordingly, the parties agree to the following changes:

A.

Article III - Period of Performance is revised to extend the contract term as follows:

8606200095 G60612 PDR CONTR NRC-02-83-035 PDR 1

E2C at c'ovioed herein a'l to'ms anc conditions of tne cocuanent referenceo in floan 9A or 10A.as heretofore change:. remains unchanges anc in futi force 15 A. N AME AND T6TLE OF SIGNER (7)pe or prtats 16A. N AME AND TITLE OF CONT R ACTING OF F.CER (Type orprint/

Betty J. Muzio EloisJ.Wicginsk Senior Contract Representative Q o 7_ y gwp g7f4 15 8. CON TF " ' '

15C. O TE 9GNEO l6Blu 0 5T E E Ric A 16C. D ATE stGN ED M

gy _}'

(5g.ature off ntvectanf0theer) f 45stnatas rf Wn eufornsed to sQ) e NTN 75:0-01 152-8070 30 105 STANDARD FORM 30 (REY.10 83; KEVIOUS EDITION UNUSABLE Prescretiec Dy G5 A CJnch nnnFQiMPASM

NRC-02-83-035 Modification 39 4

Page 2 The performance of work described in Article I shall commence on January 21, 1983 and shall continue through September 30, 1986.

The extension of the contract term is hereby made to allow completion of task orders already assigned under the contract as of January 21, 1986.

New task orders will not be issued after that date or during the extended contract term.

B.

. Task Order No. 004, " Licensing Technical Assistance in the Review of Surry Power Station Dry Cask Independent Spent Fuel Storage Installation,"

paragraph 7.0, Period of Performance, is extended through July 1,1986 at no additional cost to the Government.

C.

Task Order 015, " Evaluation of Major Safety Analysis Report Segments for High-Level Kaste Solidification at West Valley," Paragraph 6.0 Period of Perforrance is extended fron July 1,198E through September 30, 1986 at no additional cost to the Government.

i t

I i

I i

O i

1