Forwards Rev 1,dtd 970919,to QA Procedure 97-01, Matrix of Assignments & Corrective Actions - Phase III for Corrective Action Implementation Plan
ML20211G622
Person / Time
Site: 07100102
Issue date: 09/19/1997
From: Dicharry R
SOURCE PRODUCTION & EQUIPMENT CO., INC.
To: Matula T
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20211G625 List:
References
71-0102-97-211, 71-102-97-211, CAL-97-7-06, CAL-97-7-6, NUDOCS 9710030123
Download: ML20211G622 (1)


Text

g 7/-O LO2.

, September 19,1997 Mr. Tom Matula Mail Stop 06Fl8 Transpmation, Safety & Inspection Branch Spent 1 uel Project Office, NMSS l

U. S. Nuclear Regulatory Commissian Washington D.C. 20555 FAX No: 301-415-8555

Reference:

Confirmatory Action Letter No. 97-7 006.

Docket:

71-0102

Dear Tom:

Attached please find the Phase ill Corrective Action Implementation Plan Matrix, Revision (1),

dated September 19,1997. With the exception of the corrective actions addressed during Phases I and 11, this matrix consists of the remaining corrective actions corresponding to the observations made during the NRC inspection of June 16-19,1997, SPEC's internal audit of July 7,1997, and the NRC inspection of July 9-10,1997. The Phase 111 matrix also includes corrective actions i

resu. ting from independent audit and root cause analysis conducted by Quality Management Support, Inc.

We recentlyJeceig and are in the process of eviewing NRC Inspection Report No, 71-0102/97-211 and Notice of Nonconformance dated August 28.1997. We will revise the Phase 111 implementation matrix to address any findings that have not already been identified during the closing meetings associated with the NRC inspections, if the Phase 111 matrix is revised, we will include it when we respond to the Notice of Nonconformance not later than September 28,1997.

Based on the audits and inspections we anticipate the need to submit an application to rcvise our QA program after the Phase 111 corrective actions have been completed.

Sin t

l/

R.

onny) Dicharry President

Enclosure:

Phase ill Corrective Action Implementation Plan Matrix, Revision (1), dated

/@D September 19,1997.

09-19-97.GC2 9710030123 970919 PDR ADOCK 07100102 C

PDR IIIEkE{llS!kNhlll Y Source Production & Equipment Co., Inc.

113 Teal Street St. Rose, LA 70087 9691 Phone 504/464-9471 Telex 460156 FAX 504/467 7685