ML20211G520

From kanterella
Jump to navigation Jump to search
Discusses 970922 Arrangements for Administration of Licensing Exams at South Texas Project During Wk of 980601. Requests That Staff Provide Exam Outlines by 980105.Written Exam,Operating Test & Supporting Ref Matls Due by 980309
ML20211G520
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 09/26/1997
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cottle W
HOUSTON LIGHTING & POWER CO.
References
50-498-98-301, 50-499-98-301, NUDOCS 9710030069
Download: ML20211G520 (6)


Text

_,

(

pa m.

uvuo sun s -

,3 NUCLE AR REGULATORY COMMISSION st E GtON iv g

$119Y AN PL AZA DRik t, $Utl E 400 of, AR U NG TON. T E K AS 76011 Bf44 September 26, 1997 i

William T. Cottle, Group Vice President, Nuclear Houston Lighting & Power Company P.O. Box 289 Wadsworth, Taxas 77483

SUBJECT:

NRC INSPECTION REPORT 50-498/98-301:50-499/98 301

Dear Mr. Cottle:

in a telephone conversation on September 22,1997 between Mr. J. Pellet and Mr. J. Calvert, arrangements were made for the administration of licensing examinations at South Texas Project during the week of June 1,1998.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 8, of NUREG 1021, " Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by January 5,1998. The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES-201 will be due by March 9,1998.' Any delay in receiving the required examination and reference materials,/ D-or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests,it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In

-accordance with ES 302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Mar,agement and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 9710030069 970926

~

g g f, hDR ADOCK 0500 8

I Houston Lighting & Power Company 3150-0024), and waiver requests (if any) (OMB approval number 3150 0090) at least 30 days before the first examination date if the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days bsfore the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on April 30, 2000.

The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the information and Records Management Branch (T 6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1@NRC. GOV; and to the Desk Officer, Office of Information and Regulatory Aff airs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Calvert has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Bundy at (8171860-8172 or Mr. Pellet at (817)860-8159.

Sincerely, e

i h Arth T. Howell Ill, Director Division of Reactor Safety Docket Nos.: 50-498;50-499 k.

License Nos.: NPF-76; NPF-80

_4 i

' Houston Lighting & Power Company

- cc:

Lawrence E. Martin, General Manager Nuclear Assurance & Licensing Houston Lighting & Power Company P.O. Box 289 Wadsworth,' Texas 77483 Mr.-J. C. Lanier/Mr. M. B. Lee City of Austin Electric Utility Department 721 Barton Springs Road Austin, Texas 78704 Mr. K. J. Fiedler/Mr. M. T. Hardt

' City Public Service Board P.O. Box 1771 San Antonio, Texas 78296 Jack R. Newman, Esq.

Morgan, Lewis & Bockius 1800 M. Street, N.W.

__ Washington, D.C. 20036 5869 Mr. G. E. Vaughn/Mr. C, A. Johnson Central Power & Light Company P.O. Box 289.

Mail Code: N5012 Wadsworth, Texas 77483 -

INPO Records Center 700 Galleria Parkway Atlanta, Georgia. 30339-5957 Dr. Bertram Wolfe 15453 Via Vaquero Monte Sereno, California 95030 Bureau of Radiation Control State of Texas 1100 West 49th Street Austin, Texas 78756

Houston Lighting & Power Company Mr. Glenn W. Dishong Texas Public Utility Commission 7800 Shoal Creek Blvd.

Suite 400N Austin, Texas 78757 1024 John Howard, Director Environmental and Natural Resources Policy Office of the Governor P.O. Box 12428 Austin, Texas 78711 Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street Bay City, Texas 77414 Licensing Representative Houston Lighting & Power Company Suite 610 Three Metro Center Bethesda, Maryland 20814 Rufus S. Scott, Associate General Counsel Houston Lighting & Power Company P.O. Box 61867 Houston, Texas 77208 Joseph R. Egan, Esq.

Egan & Associates, P.C.

2300 N Street, N W.

Washington, D.C. 20037 K. Coates, Manager, Nuclear Training Houston Lighting & Power Company P.O. Box 289 Wadsworth, Texas 77483

4

.. =

Houston Lighting & Power Company -

E Mail report to T. Frye (TJF)-

E Mail report to T. Hiltz (TGH).

E Mail report to NRR Event Tracking System (IPAS)

E Mail report to Document Control Desk (DOCDESK)-

bec to DCD (IE01)(IE42) bec distrib. by RIV:

-Regional Administrator Resident inspector DRP Director DRS-PSB Branch Chief (DRP/A)

MIS System Project Engineer (DRP/A)

RIV File Branch Chief (DRP/TSS)

R. Bachmann, OGC (MS: 15-B 18)

H. Bundy, RIV '

L. Hurley, OLA DOCUMENT NAME: R:\\_STP\\ST8301.LT.JLP To receive copy of document, indicate in box: "C" = Copy without encbsures "E" = Copy with enclosures "N" = No copy -

C:OB D:DRP D:DRS@

n JLPellet

  • TPGwynn W%THovVejp ft 09/22/97 09ff,/97 /)

09[y97" '

'Previously concurred OFFICIAL RECORD col'Y

D.

Houston Lighting & Power 5-Company E-Mail report to T. Frye (TJF)

E-Mail report to T. Hiltz (TGH)

E-Mail report to NRR Event Tracking System (IPAS)

E Mail report to Document Control Desk (DOCDESK) bec to DCD Q(IE42) bec distrib. by RIV:

Regional Administrator Resident inspector DRP Director DRS-PSB Branch Chief (DRP/A)

MIS System Project Engineer (DRP/A)

RIV File Branch Chief (DRP/TSS)

R. Bachmann, OGC (MS: 15-B 18)

H. Bundy, RIV L. Hurley, OLA DOCUMENT NAME: R:\\_STP\\ST8301.LT.JLP To receive copy of document, Indicate in box: "c" = Copy without enclosures "E" = Copy with enclosures "N" = No copy C:OB D:DRP D:DRS@oj l

c JLPellet

  • TPGwynn @'ATHovi/epj h 09/22/97-09ff/97 l) 09W97" '

'Previously concurred OFFIClAL RECORD COPY