Deficiency Rept 87-02 Re HVAC Control Circuit Problems on Loss of Offsite Power.Initially Reported on 870116.Advanced Change Notice ACN-D-0015 Issued to Rewire Circuits &/Or Add/ Delete Timers for Performance.Related Info Encl
ML20211G148
Person / Time
Site: Beaver Valley
Issue date: 02/13/1987
From: Carey J
DUQUESNE LIGHT CO.
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
2NRC-7-028, 2NRC-7-28, 87-02, 87-2, NUDOCS 8702250291
Download: ML20211G148 (20)


Text

17.Ce*CZ 4

'At3 2NRC-7-028 Beaver Valley No. 2 Unit Project Organization Telecopy 4 2 641 Ext.160 S.E.G. Building P.O. Box 328 February 13, 1987 Shippingport, PA 15077 United States Nuclear Regulatory Conmission Region I 631 Park Avenue King of Prussia, PA 19406 ATTENTION:

Dr. Thomas E. Murley Administrator f

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 HVAC Control Circuits Problems on Loss of Offsite Power Potential Significant Deficiency Report 87-02 Gentlemen:

This Potentially Reportable Significant Deficiency Report is being submitted pursuant to the requirenents of 10CFR50.55(e).

It is anticipated that no adoitional reports will De required.

DUQUESNE LIGHT COMPANY By A

J. J. Carey Sr. Vice President LMR/ij r NRC/LMR/SDR/8702 At hment AR cc:

Mr. P. Tam, Project Manager (w/a)

Mr. J. M. Taylor, Director (3) (w/a)

Mr. J. Beall, Sr. Resident Inspector (w/a)

Mr. L. Prividy, NRC Resident Inspector (w/a)

INPO Records Center (w/a)

NRC Document Control Desk (w/a) 8702250291 870213

{DR ADOCK 05000412 k

PDR

\\

fb23

ATTACHMENT 1.

Summary A review of control circuit logics for various BVPS-2 safety-related HV AC supply and exhaust fans has revealed several problens.

Specific-ally, following a loss of offsite power event (LOOP) and the subse-quent transfer to energency power, certain HVAC systems may be restar-ted and sequenced in a manner that is not in accordance with design requirements for those systens.

2.

Immediate Action Taken Analysis and specific corrective action was cannenced resulting in Advanced Change Notice (ACN) C-174.

Mr. L. M. Rabenau, Canpliance Engineer, Beaver Valley Unit 2, notified Mr. Lowell Tripp of NRC Region I of this concern on January 16, 1987.

3.

Description of Deficiency Five specific problems were identified:

a.

Certain safety-related HVAC systens are designed to operate with only one train of the systen running at one time.

However, in some cases, after a LOOP, both trains of an HVAC systen may start up autanatically.

This problen is applicable to systens located in these areas:

Emergency Switchgear Area (HVZ), Control Roan Area (HVC), and Main Steam Valve House Vault Area (HVR).

b.

The control logics for certain HVAC systens function such that if one train on the systen is operating, and a LOOP occurs, the other train will be automatically restarted once energency power is restored.

However, should the train being restarted incur a fail-ure, the other train will not autanatically start up.

This prob-lem is applicable to systens in the following areas:

Cable Vault and Rod Control Area (HVR), and Control Building Area (HVC).

c.

For the Control Room Area HVAC system (HVC), the energency supply f ans are autanatically operated after a sixty minute time delay which is initiated by a CIB/ radiation signal.

If a LOOP occurs after the timer has been energized, the timer resets and begins timing sixty minutes again once energency power is restored.

d.

The Emergency Switchgear Ventilation Systen (HVZ) is designed to maintain a constant fan discharge tenperature by the modulation of danpers for outdoor air, return air, and exhaust air.

In order to maintain temperature, the outdoor air and exhaust air danpers need to move in one direction (open/close) while the return air danper must move in an opposite direction (close/open).

Since systen requirenents cannot tolerate a fail-open return danper which would result in overheating of the energency switchgear area, all dan-pers were purchased fail-closed.

This results in allowing the operation of the subject three danpers in the sane direction.

e.

The Control Room Air Conditioning System (HVC) contains two refri-geration units which have a reset function that requires a manual reset at the equipment location after a LOOP event.

However, systen design requirenents necessitate an immediate restart following a LOOP and restoration of energency power.

4.

Analysis of Safety Implication a.

The present control circuits will autanatically start both orange and purple trains following a LOOP.

The affected areas are not designed to accommodate the increased air flow resulting from parallel operation of both trains.

b.

The HVAC train operating at the time the LOOP occurs is locked-out by the systen logic fran restarting once energency power is restored.

Thus, failure of the opposite train (which is a cred-ible single failure) could result in neither of the HVAC trains operating even though energency power is restored, leading to a loss of ventilation in the affected areas.

c.

The starting of the supply fans could be delayed beyond the sixty minute design requirement, and may occur after the depletion of the bottled compressed air systen.

This could result in no HVAC flow to the control room area.

a.

The current operation of the subject danpers renders then unable to maintain discharge air tenperature which may cause overheating in the energency switchgear area, e.

Because the refrigeration units do not reset automatically follow-ing a LOOP, a lack of coolant to this systen results.

5.

Corrective Action to Resolve the Deficiency ACN C-174 h as been superseded by ACN-D-0015, which describes the detailed corrective action (attached).

It generally calls for rewir-ing of sane control circuits and/or addition / deletion of timers in order for the systens to perform in accordance with design require-ments.

6.

Additional Report No additional reports are expected.

^ h \\ 5 n c R 15 E Et s f.r REVL%.D To SHOW

~

~

/

RE\\Jls10H To IW6GED E:tDCR,9 p-oo!5-gai NOTED APR 10$86 a.s.ine y o

h CE-8 V

2 PAe8 l or C..

a.o. itsu DATE: J/,2 7/76 ;

OlSCIPLINE(3)CCUTCCd/

ACN.

ORIGINATOR:g ggg,g AFFECTED: ggg No, b' HOI NO O *W[

I CATEGORIES IMPACTED (CHECM)

DCCG RESOLUTION - ACCEPT [ REJECT 11-M, I

STRUCTURAL ELECTRICAL PIPING / FACILITIES ON Q INTRA-PANELWIRE KELDsENTARv/WIR1NG Q EMGEoesENTS Q EXPOSED RACEWAY Q LARGE SORE (>2")

INSTRUIIENTATloN/

Q REINFORCING STEEL Q CoNoUlf TRArt ANO Q SMALL SORE ($ 2")

3TALLATION SUPPORTS Q STRUCTURAL STEEL Q EXTERIOR CAR.ING

% DUCT C CONCRETE Q wlRING DIAGRAMS poe:C/ruMCTicNAL Q SEcuR Tv ENGINEERING MECHANICS Q LoopotAeRAas O LIGHTINe q

SYSTEM TURNOVER Q cose0UNICATioN Q PIPE /ouCT EQUIPMENT Supports yts Q ME ALARM ANO

<1 (loENTIFYl r'

O oETECrioN O pie Ru TuRE RmRAINTS NAnst Sff" Pat < T-4 TURNOVER Nos.

O PHYSICAL otA4 RAM Coot CONSTRUCTION

[44 A-I A,B,c )

! A'E/'E/ FENCE -

NAtat SCHEoULE q F-M

[MM C -/ 7y Coot COST

\\Nd"M E DESCRIPT10N OF CHANGE: YJ GkArtGL::L ALLLL sei & wad es citih

/2U knfillA,]2/1 A2Gl$t%lMLLLW N GiD ctTD2Ad:d. k:1/1H& l'k,

Gwnal%dj Tidau m'r% ku addnt' D.nwa9 c2r>,rnD nihn's 22 kmai k r edo 6.1,edr<atinwusTd' Lausanor /csx ef r$1rt' OCUW D trii JTI?%

  • si t ), kM % MINWIRO kCItB O~!Mi b e7 M %

E f/

de onknaj SSilyn (2) Jze. Yin n sc$tL5vi -4 arbwdi L Rusw n Oc iso u n,

REASON FOR CHANGE:% rislv11 Ht/Ab uATI~t. tot e % h & ltid:na cL-e n

M d A*

H os u w W & nc4-b lis tj a b";f

~ Ed> >

w h.

f) Lw 'n. Oak c.r fieluu nu n A.ikli !:& 5 ob2d?,tL !YT'E.~CX2 & i-

.~c! e rM Y~W N1.,w A1tYwo Sis. Wir/> M &E77L A Lnu, Anus er 4 37$,

,,se,mimis.- 'ptdv cuor-w M a ir n ?~! h ! 0 0 N o rz1 & khmnt l k rit2&i b, & 471n~ f# 4LL5/ & g CONSTRUCTidN IMPACT: INSTALLED - YES j NO I d

l 85-(ooi yES No yEs No

.-IC R

O oRAwiNe aECALL O Y

cATEGoRv Not wPCN REauiREo IF CHANGE CONCURRENCE POWER CONTROLS ELECTRICAL EMD STRUCTURAL R

CMTG D LC,.

a jhg' gj{'hj]

&N p(

"I*

"I4

' PRGdECT ENGINEER

l ACM C-174 I

Page 2 of i

System / Equipment Description of Channe Besson for Chamme i

1.

Control Room A/C Sy"L9"

( oNE PE4 EAA4(JrT,)

v'2HVCAACU201A,B (a) Add two Agastat timers to control (a) Current circuit design will start 4

circuits to allow the running ACU both ACUS following a loss of to restart following a loss of offsite power. Per system offsite power.

requirements, it is unacceptable h/hh9-l[3 to have both units'im operation.

(b) Relocate 2HVC*PDS201A,B such that (b) 2MVC*PDS201A,B are currently PI)S201A(p) senses ACU201B flow and located in common discharge of PDS20lB(P) senses ACU201A flow.

2NVC*ACU201A&B. Nust sense the l

Rewire PDS201A,B interlock to flow of each ACU individually to ACH2OIA,8 to prevent both units ensure that only one unit runs.

from running.

Per system requirements, it is

(,

unacceptable to have both units j

in operation.

2ilVCAREF24A (4y A-s D)

(a) Add two Agastat timers to reset (a) Following a loss of offsite power,

[3 h

8 (dyYA -tC) c ntrol circuits following a 2NvC*REF24A,B control circuits (7

loss of offsite power.

must be reset before units will l

restart. Currently this can l

only be accomplished via manual pushbuttons on the unit.

(b) Hevise alarm circuits to alarm (b) Alarm currently activates on loss on unit trip due to trouble of power only.

or loss of power per KSK 21-1 and system requirements.

t) q)

()

11 6

t 2217-12241-B4

.j

)

ACN C-174 Page 3 of i

System / Equipment Description of Chanae Beason for Chanae*

s!

2.

Control Room Emergency i

Pressurization System M

2ilVC*FN241A,B !

(a) Add new circuits for CIB timers, (a) Timers must remain operable during having power feed from uninter-a loss of offsite power to ensurc uptable source.

that 2NVC*FN241A,B will start 60 min after a CIB.

Present circuit desiga

.f will drop out CIS timers on a lose of power and will reset to time zero

,4 when power is resumed.

1 3.

Control Buildina A/C System 2ilVC*FN266A,B [

(a) Add two Agastat timers to control (a) Current circuit design will start.

circuits to allow running fan to the backup faa following a loss of restart following a loss of off-power and the duty fan will not

_j M -/A site power.

restart on a single failure (los.s I

of diesel), resulting in a loss of ventilation.

D I

Q l 4.

Cable Vault and Rod Control Area A/C System Q) w 2HVH*ACU208A,8 !

(a) Add two Agastat timers to (a) Current circuit design will start control circuits to allow the backup ACU following a loss of I

running ACU to restart offsite power and the duty ACU will following loss of offsite not restart on a slagle failure VYO-2A power.

(loss of diesel), resulting in loss of ventilation.

(b) Hewire 2tiVR*PDS30A,B inter-(b) A single failure may result in lock to ACU208A,B to prevent both ACUS running. Per system both units from running.

requirements, it is unacgeptable i

to have both units in operation.

j a

i O

2217-12241-114 y

i

I ACM C-174 j

Page 4 of 1

System / Equipment Description of Change Reason for Channe*

I 5.

Emergency Switchgey Ventilation System I

2HVZ*FN261A,B /

(a) Add two Agastat timers to (a) Current circuit design will start i

control circuits to allow both fans following a loss of running fan to restart offsite power. Per system following a loss of power.

requirements, it is unacceptable

+

'lt/F-3A to have both fans in operation.

I h

(b) Rewire interlock from (b) A single failure may result in 2HVZAPYL21A,B to FN261A,B both fans running. Per to prevent both fans from system requirements, it is I

running.

unacceptable to have both fans in operation.

l 2HVZ*FN262A,B (a) Rewire control circuits to (a) Current circuit design will start slave FN262A,B operation off both fans following a loss of I

of FN261A.B in all modes of offsite power directly from diesel l

operation.

sequencer. Per system requirements.

l 4W-3/7 exhaust fans are to operate in conjunction with its corresponding supply fan.

g (b) Purchase two Class IE pressure (b) A single failure may result in both differential switches. Install fans running. Per system requirements o-orange switch to sense FN2628 it is unacceptable to have both fans flow and purple switch to sense in operation.

O FN262A flow. Wire switch in k

fan trip circuit to prevent both fans from running.

Ni l

4 l

O l

T1 2217-12241-h4 M

l i

AcA) D-Oo /f Pf5of'1T sc.a.imow ey c. xmas.3 (_e.c. )

-=_.. -. _.

Ad4ed._; nam.sts.__t %._emecyg htq

, %ms

.... A v e w % L.s g % _ t a c xess & aperataw

..o G.. M & m a.\\e. 4 a.n pec-a wsAsea woe e.a4.sgu. ( c.oc. )

O

  • .*8 5

m e.lo l,. Cia._oE.. h.. outA.e, cha.eit-M g q,_c-

%r h am

~

cJu,-

c olm r-3 30, ~

e c(ye...on<-M,4%r-se] _tb &T

  • O tLe_ och 4 rse.. a,-

A g es.

m ~t,n, a\\ ca -

4-pers o ccoh.,n t b s - c),Aci.i-e d.use r.1,e_ temp.I.am el.M gstem, hog %.

m

-g.a..

e

& 6 W4'***

.=

5, 3

ENGINEERING DOCUtvic.NTS TO BE REVISED l

(1.E. LOGIC, ELEMENTARIES WIRING DIAGRAMS, FLOW DI AGRAMS,E TC.)

J j'

DOCUMENT SYS TEM TURNOVER SCHEDULED NEW EQUIPMENT hyg Eggy PU CH l

NUMBER RELE ASE No-usT DATE ISSU E DATE REQUIRED PURCHASE DATE i

i asco Two ta EW S Std,TcN l

l 6 -(oLLP -G VYa-)a hie ~i'

/Ord!G neic a<a ouve 2.AcsA-lirain 2 u-15I i

l l

L-llELQ-Y @ nil-> b

/9)0%

2 AfhHnuW 1

~ " ' '

I h ll 6(3-9

'/ '/A - ' D

/'/MP6 w

i l

E-l I(2P--13

'I 4 A - > c

!%9uf?6 m

)

E - DL-- !3 44 A~ 18 o/fd Pc, w

n E - to u Q-2

''/A ~3 of,) J PG 2 edatta zw.,sn h%

bs2 Ton i

E-6 u M-I l

'/'/A 14

/4)d PG 2A & W uv -n *

' '~^*

N ;'

E - (oEH -I l

'I ')2 -aA o c/ gy g6 2A6A $ ns

(

i 5 -loBa)-9

'll/F-3d 07 Aps P(s 2A6A~lTntig 4

i

?

l Q.

E - toB2-- 6 4'IF-3d yew G

%\\

l E - II LF -l

W-3A V

w

.%(

i Czraio

-e k'St(- 2 I-I A vya -, n

/%):JJ&

KSK-2l-66 9'Y F.3d y

o 7ap CG Y

" "E l

a I

i 5,

3 ENGINEERING DOCUNc.NTS TO BE REVISED (l.E. LOGIC, ELEMENTARIES, WlRING DIAGRAMS, FLOW DIAGRAMS,ETC.)

PyCH TURNOVER SCHEDULED NEW EQUIPMENT DOCUMENT SYS TEM

~[yg EgA i

NUMBER RELE ASE No-UST DATE ISSU E DATE REQUIRED CHASE DAT

~ ~ * ^

~

2 Hill 4 7 Y E/ M gp

'f 4I# #6 26 **Y 86 n

8*#

'"I 8

/

l UV ~113 94I-M

/

2.4dd N 'Y3 l

t/

v w"

\\/

Zid1 1 /

\\ /

(sm-a- e e/-

saw l

Csw patscst. outx' NN~

d O7A $f b N

OVER 1

i tooe versus i

2stJ7_,-4T22s A,8

^

IE!IM PC I

3HJAMPps/004 l

YWf-}h I

Edvl4rPO$/000 W

~

f l

b E-LEA ~1 We= -rel rt 341 486 w

i e

G-ISS-7 WF 3A h

y y

i f w

~

i

,ee- - Es?

apac o-u 6

S' l

/ee-u n 1

(

8 a

RF-JEU f

J

{

n

c. n avu->c) m

)

k[~' 2rA2

.?;',,4.".,9 Wd%

cy a

/E-7A E'

'/'M -> D

/ hl%

\\

d'E^- 73f

\\/

v i

i 5/ 0 5 ENGINEERING DOCUMt.NTS TO BE REVISED

)

(1.E LOGIC. ELEMENTARIES, WIRING DIAGRAMS, F LOW DI AGRAMS,E TC.)

P!JNCH DOCUMENT SYS TE M

.NUM BE R

, RALE ASE No.

UST DATE ISSUE DATE REQUIRED ASE DATE '

7 cc. r 3ty)g 00, P

. h x A e a p.

Nff i

pg 9pt WA-/A ouee 1l l

r

(

i

\\

9Hf a

t it.

8!

il '

4f}

ysA-sA,8. g y 07 APA Plo 28 rep e s

\\

\\

t 6.

r,ua>

"*3ff we.-4,f i

ui Gun,w 3

"' )1'yg4 WA-fB Qe}-

MM%

)

y eig.,,,

W

{

}

M)-18 1'as 460 j

07AAPG

)

1

\\

JNT l

jy,y, u,,

w

/

(

.3//L

\\

v l

%.w

-> a

}

k? ' '

l j

/fde

'LF-3A h

4

\\

Yl

/8p

'/'/A -iB O/)ufPG h /9428 b l

8:

91c 'was ovaarm l

i 9;

}

nr

(

l 9

q

$h0 J

V t

YY h$X~?

/)ulPG e

di ~J 5

)

v

ENGINEERING DOCUMt.NTS TO BE REV1 SED (l. E LOGIC, ELEMENTARIES, WIRING DIAGRAMS, F LOW DI AGRAMS,E TC.)

DOCUMENT SYS TEM TURNOVER SCHEDULED NEW EQUIPMENT h"gyg EST A PUNCH NUMBER RELE ASE No.

Lisy DATE ISSUE DATE REQUIRED PPMASE DAT

'[

l 3Soo I'/)ap%

.3OfMA' BG Nh l

l

$E-//.u'+

'IVA-/A caea.

i

)

-[

l AF- @ D f

I l

/

\\

(

~7 1

{

nx N

(

(

/

i I

j

[EO

{

w I

i

/

\\

A !-

l

\\

JEM

\\

/

?e i

/ew a:

I D

\\

3EA/

\\

i

%+

)

dfAW 4

i

\\

}B f V

Y O l'

//Af W s.2 F 0'lAug ?(o G

i,,* !

p 7,,lp f(,

28 fe J J 6 y

9A/7

'I'/F-3 R

5/ 05

~

i l

ENGINEERING DOCUMt.NTS TO BE REVISED j

(l. E LOGIC, ELEMENTARIES, WIRING DIAGRAMS, F LOW DI AGRAMS,E TC.)

~

l DOCUMENT SYS TE M TURNOVER SCHEDULED NEW EQUIPMENT 177g Egggy PUNCH NUMBER RELE ASE No-UST DATE ISSUE DATE REQUIRED CNA8E DATE 1

64L 3ctoo fr-9py

'/'E~3A G

07An t(,

ss np E6 NA

\\

sik

'f

)

)

. eta l

CJ4

}

/

-$EX

/

j

~.4/W l

J

~

-,y I

Y ^

L'?' /E

fh) 1 4 44

?c!:,!" f $2?_

d!!d'O L)

-)f)

A i)b l CAft2 b ~lD l

She ll bN Q_

I co up l

l A D'D 2 c hecES Ub 'lS 0/,)u SG i

oa; o

l ADD 2 cAdiEC '/'/d-2A o v <z<< 9 P 6 3

j

/16 )

4 Q$L /CAdL{

~$

l 4

\\

7 ii sy 1

DEL /CAdLE YYb ~IL lYri ou..,

q,

%f l'f$. ffS t

~G l

Aon Y ciutes '/Yd-l/l t

j V

1

I ENGINEERING DOCUMt.NTS TO BE REVISED (1. E. LOGIC, ELEMENTARIES, WIRING DIAGRAMS, FLOW DI AGRAMS.E TC.)

l DOCUMENT I

SYSTEM TURNOVER SCHEDULED NEW EQUIPMENT Qy$

Egg PUNCH NUMBER RELE ASE No.

tIST DATE ISSUE DATE REQUIRED PURCHASE DATE l

i l

o v..,

yim Ahb ciek!cET V'IF-34 ouep /TAMPG o, a j

1 (L 1900 a ciuces YVF4A

,(

y nc>v (cA k a -ca r a )

y W-%T

\\

3 o pr w sc, KRy' W

v v

A % -\\6

/)b&

Noca. 2P 'it]Y Yf 7

544. *+Md g g -. 8 4 c v6oo 7

x.n

,ag m a l

f6-64 d ga ge-vov g/

2 Rs- \\6 +v

\\

V 3,gjpg QQy[G R

\\

ca n,a 6

" td %vs RB-33AiB 4y F-3A y

~79470 y

mad F'h'l-I 4 4 A-i n cy/.d(@

s t j u <g c, N[4 R

l O

i f5M F 94-l3 qq p _ g g

o j y;., fc;,

3 f J% SL

)[

w i

i ENGINEERING DOCUME.NTS TO BE REVISED

' 1 4

I l

(i. E LOGIC ELEMENTARIES, WIRING DIAGRAMS, FLOW DI AGRAMS,E TC.)

l DOCUMENT SYSTEM TURNOVER SCHEDULED NEW EQUIPMENT gyg Egg l

PUNCH NUMBER RELE ASE No.

List DATE ISSUE DATE REQUIRED CHASE DATE I

I

'u a ss a-s gyyn tilA-l XE?SEF h -\\B ot 3oL%

3o me. n r

8

\\

l

\\

- 373

/

\\

- 3 3~L

/

f k

l

~7 hat i

l

/

I l

1 9 H K.

l

\\

4 g\\

i

[

J g I' 4

N L' A(

Q' l

l iu o.a..a;!;n

/

o l

(?F-42A,9dB Se '.Sf!*M '"!

i i

\\/

4/

\\/

3, i

i n~w on4-,o 4so avJuw g/4 4,

R6-24A,R6 44 44 F-3A 00Eb N ' 'l' N EibCR 2P *'llN

~4 ;

i w oguemp

~~

tv il j

dec d s xence ms voy

12 Wcu toe wz ses noo^.s Wr-34 7 MCS6 25Y*d'$d*

f i

z op, 1

gs,se icc w q=P

)_

fus EllVC E VbS='0'hb YY/l~!O Ll/)g)b hb if A

a

L, 35 L

ENGINEERING DOCUMt.NTS TO BE REVISED

Ji (l.E LOG:C, ELEMENTARIES, WIRil4G DIAGRAMS, F LOW DI AGRAMS,E TC.)

DOCUMENT SYS T E M NN EMMGT Qy$

%j$37 PUNCH NUMBER RELE ASE M*-

uST DATE ISSU E D AT E REQutRED PURCHASE DATE upants T< bn l

ns ged)

WA-)A

/4)aA86 SiW NfA gevdE ADn

{

i nsxeas WF-3 A,Ywo 7AfRPlo 3 0 ggfG

,a i

nevas rm cc=u q

y nssen 4 H G-2-A t

Y^U'of 30AfR Pro s

1rstA SW 4f 1

affaRA.

h.

Y

~~~

~

E - +3 C YYA-M Nmg

$s Mn ec.

em e E q +r p m a

spaat r

6 it.

9

)

i, i

4 I

f Gi bh s

/

/k/J D-006 DLn Id GH'l as as STONE AND CEBSTER EN 1 EERIN3 CORPo2ATION f ' "# [

ENGINEERING f DESIGN WOORDINATIO(@@[, [f/Q ] sg

'"~'D U ClO ESNV.

[AG H. T 6VFS - 2.

'"G E ~ l4 r

.....og.g 3g4og.gcojej.

m 2n M

,, o...

-u, gg,,,,

....L,.......... L,. g.y.g

..""0"v'"a"E"Sv sr =>.t cc vWloL.s

."E/ha.tEAes E4.0cc 2r-492 4-

.........no.

i. LWc
  • 9052ci A G Atle. c'u M GoTL 4 Lo (ArE614 i

CA3 NN t t5CWM.GE bVcI o.F 2.KVCW ACU 2c to i 6 A* b TMts, AS4AwGG 6T ScVTm,9rs.a To Q,oTt t V At l.TS Te 44 tJ SpTG/

Lo s s o F vot.cE2.. t r ts V M A cc EPTA 6t,C to H AVE 6cTH OutTS GON L uG 4T-TiiE %*tE Tl tt E.

2, A St9 6LE F#1 LO 6E OP-Tess v 4.4.

SvtTCHe.s. ou btsCumc oe 2.H.V2

  • Fra 2 62 Ai 6 @q cebvLT tu 0,oTH FANS Ocu uauC.

lT [5 ()NticCE 9TA BLE TV W/hJE. &CTH T-W (d C9MMM y TNE.

S6t4E Tl H E.

S E A s c oJ re y t ( e. v t<;. t o >a ' To CL AQ464 DC.5CT24.9Ttow OF, c

3FRancourn

.i.

(%ost,c.M wt,v T w w Forz. T.m_.H ".1.

,RMMcMellon -1 A N cm A 4 8,6 c. Ast m W,c 90 tu r (Atc,- @,,

',""'"*'l L, 9 A2d GA$""8f ihh?/4-86

'l"""*."."""/Vf#

l r

'JDS"u"tG"" " 1 VOGammmeg e A 0c R. 2P-492.4-n MPLelliott - 1 TGCarson - 1 k, GELcCATE. 2 k\\/C -)(?D S JO L A AN D 6 %

KMFahey 1+

l-OC-kTLoeJ 0 9 srtLC AM. OF 2.Hv c

  • nob ZC6A G i

P h

ar - 1 DKMD OM 9 JoF 3 MJLaPia - 1

. 3.ca -1

,2. AhD 214V z V P O S too A D S E.tJ OE NESS, sJDonovan - 2 blFFE(LENTt At Go vt. 2kVZ t FN 2 C2.6 erJ b knee *_f 2 MVZ k 9 BC tOo B TO WW Pd.GASU Ch.

J7Catalogna - 1 btFI-ell 6SJTM L TOl 1 MVZ f' FU 26l. A DP3rennan - 1

( % G.plg.3) oA3 usa - 1 LSousa/TCR - 1 bm ; 4 /kC A/- D-00/5' \\)

.,reeno oocu.c r

u. u n vr c ir.ru.

,.g ourco.gc.

u c r, ctic,,r.,,

neoa 8

J.

R s _q 4. g-o&A b

C

..n, un J

i W. 1.-Oe P A.-

o

..n.

.o.....

.o. in.

....n, Q

g c,

oi oa u

.L.6V.tueM

. t.. L o.J./N. 44 A - I5 "

. 44 F -3A "

t o.c Lt..t n o.

A to.ste..t 4 0. s',

% /T VM

..n.i.a n.g g

o.

...o.

u e c o i,....M A P, " '

y s

1 4

c.j c.

eo.rt

'i..,.t.o.t n o e.is

n't EBUi!"!!
EE"-

9 5 syMW56.- -- - - "" " "

i " "

n u... -,..,

iy y

u......,

u s c..no...

v

...n....,

.Q 0~

~o4

, r M g, Ea Te Se h

YS

.pP De a6a~

Tr a

Sz i

M i ;

g; I

U.v A3 H,e w

nm e%h'

.0 Xrt S

1 3

e SS c-s A

os uA g

e L

L L C.

c C, E

o LI a

y t

LY f

l l

  • st 0

g"g4 s

g

&^

e m00 9t 5E f

A g

8 T 3 ga m

E*A C

  • C L

.g s

d

.n h

1 o-

^

/

)

l.

1 1

6 w

P.

&Q h

L.

Ag i

i g

p

/

i l

g 6

7 s

s

)

P s

lC a

o c

ie F C

O

,A o

. o!

3 s

r F

2 D

M oi

.o o

a J-M

\\

e u

u 7 '

.nI.

A r

r

'c c(

os

\\

s i

i e

a s

Q

(

,iiI

\\

2

.I M,~

aj I

M 2l*

_.a M~'

3 e

_ M ~

c c ::

o

- m o ';

2~c t

?

k3_

w i

l 1i

.!1 i

jll

.ll'!

l!

ll

- - - -. - - - - - - 3g9.oy,f 79of ; <j.

I.dDCQ 2>-00/S-Bol Q 3 eF 3

[

Q-fea Ef44'll*,J* armc

+--

ggg,c

2....cm.

.<A.,

'E

{pgEF#to 470 0 p

e "e E*.2 *A^r b > *> q

74eo no.u.o

~'

Alb y

sc 5

C

]

A ME j

V *o

]

h L

1 t

lfj

.n 6.4 __

no aa'a> <

' 4,

,, nRIjE,,

K,g c:_

h

-g an.._ _

_ -y :,.

a

-3 b

Il

' (V 3

r ACO20TAFO)

L,,,, _,,, ' 3 '

a0Oc0 CFw FMTM EM Alit CONF 1 i N1

~ '

MS

'l a Des chan q{

~

og g

1 b M

I w.

g n C (L*U t--

3 08 n

,m-(

=

@ }

F"'8 ) <6.n

)

o 4

i

\\

I C'

'9 awoo x i4

o 9

D Ji*

\\Abb g;,O

[WetW'J Ev o

th8 N6W,

]

a:es ins g

i m

D M CN#

1 A FLTA ae.s m

Ui7c"w** > u. n 2,

w'*44!V9 p s m.e%.m..,

Es"IE4

( (' n

(--

'8 f,^,,'3 5 ACU201 B(-P) aoooo cru CONTROL ROOM AIR COND. UNIT acas coq l

l

--E MA POWER STATION - UN8T +2

- MP 17 of /[ '-

~

" ~

8 ACx No.

(E-174 DESIGN CHANGE

SUMMARY

CAM DATE sth 3 / f s-nao TITLE: HVAC, COMTUL CIRCutT CHAAMtis SAFETY CLASS:

SEISMIC Ct. ASS:

REFERDCE DOCUMENTS:

IE: 3 NON IE: C SEE~'ATTActlab AC.M BLOG. AREA: t/A410:45 APPt.!CA8!LITT:

LICEN$ING/NRC IMPACT:

Testing C

C R

PRESENT INSTL. STATUS:

Operability N

Tech Spec C TALLO Maintaineility C C

ER Personnel Safety C Reg. Guide No:

OM CHAPTER: VAdlats Other:

Other Lic Doc:

ENVIRONMENT:

No Effect 3

}ARSH C Mit0 C OESCRIPTION AND REASON FOR CHANGE:

SEE. ATT Ac+1 eh Ac.N PROPOSED SOLUTION:

c>

seE ATTACHEh NCd ORIGINATOR / PHONE NO.:

REY! EWER:

NEED Pre Pre-Pre-M/A DCC fr DATE:

T/0 Test FL EYALUATION:

APPROVALS - OCCG:

In Scope Out of Scope C A f WA AM'

$1gnif. g Cha i rman;.,,

En ineering Date Norm. Act.

g, i,gg Accept: As Writ.

As Mod t fied C * * /fLL j) _.,j' f,.

3' Study:

In Scope C Out of Scope C

SWEC Engineering g, Date Reject: Compi.

C Rec. Post-01 C

SWEC Construction Date IMPACT:

(If yes, see attached)

Eng r. :

Yes y No g Eng r.. :

Yes C No y COST:

SCHED: Const.:

Yes No w Const.:

Yes No Testing:

Yes C No V IMPLEMOTATION:

DIRECTED APPROVA1. - OCMG:

Pre-Fuel Pre-T/0 C Load Post FL L

Pre-Test C But Pre-01 C

Chairman, OCMG" Date

~

PAGE l of 1

-