ML20211F786

From kanterella
Jump to navigation Jump to search
Forwards Revised Physical Security Plan & Plant Security Personnel Training & Qualification Plan.Revs Detailed for Plan in Respective Summary of Plan Revs.Encl Withheld,Per 10CFR73.21
ML20211F786
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/22/1997
From: Mitchell T
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9710010213
Download: ML20211F786 (2)


Text

.I-Thomac N.Mitchell Vce Presdent

. g Peu:h Bonom Atche Fbwer Staten v

PECO NUCLEAR

% vc -

184, ? ay Road A Unit of PECO Energy Detta PA 17314-9032 717 456 400o Fax 717 456 4243 September 22,1997 10CFR50.54(p)

Docket Nos.: 50-277 50 278 U.S. Nuclear Regulatory Commission ATTENTION: Document Control Des,

Mall Station P1 137 Washington, DC 20555

Subject:

. Peach Bottom Atomic Power Station Unit 2 and Unit 3 Revisions to the Physical Security Plan and i

l Plant Security Personnel Training and Qualification Plan

Dear NRC Officials:

This letter submits, in accordance with 10CFR50.4(b)(4)(iii), four(4) controlled copies each, of the revised Peach Bottom Atomic Power Station (PBAPS) Physical Security Plan and the Plant Security Personnel Training and Qualification Plan. The revisions are detailed for each Plan in their respective Summary of Plan Revisions.

These revisions are being submitted in accordance with 10CFR50.54(p)(2), and have been -

determined not to decrease the effectiveness of the PBAPS Physical Security Plan or the Plant Security Personnel Training and Qualification Plan, in accordance with the 10CFR73.21, we request that the enclosed revisions to the PBAPS Physical Security Plan and the Plant Security Personnel Training and Qualification Plan which contain Safeguards Information, be withheld from public disclosure and protected, as described in 10CFR73.21.

Sincerelv.

III.[

Thomas N. Mitchell Vice President, Peach ottom Atomic Power Station 08 9 TNM GAB /DRM: Jar Enclosures (8) cc:

H. J. Miller, Administrator, Region 1, USNRC (Enclosures - 4)

M J. Buckley, Senior Resident Inspector, USNRC (Enclosures-2)

R.1. Mclean, Department of Naturel Resources (w/o Enclosures)

R. R. Janati, Director, Bureau of Radiation Protection (w/o Enclosures)

A. F. Kirby,111, General Manager, Demarva Power & Light Co. (w/o Enclosures)

-010003 W. T. Henrick, Public Service Electric & Gas (w/o Enclosures)

'e / / M

.a.

T. M. Messick, Bulk Powers (w/o Enclosures) j (hd ENCLOSURES CON TAiN SAFEGUARDS INFORMATION, UPON SEPARATION, THIS LETTER IS DECONTROLLED

(

9710010213 970922 Mhb N

'PDR ADOC% 05000277 F

PDR

Subjset:

Peach Bottom Atomic Power Station Unit 2. and Unit 3

I-Rsvisions to the Physical Sicurity Pl:n and Plant Security Personnel Training and Qualification Plan September 22,1997 l

bec:

G. A, Bird Enclosures (2)

SC1-1 PBAPS M. A. Karney-Enclosures (2)

TSC12 Limerick J. B. Cotton w/o Enclosures 51 A 1 Chesterbrook G. D. Edwards w/o Enclosures A4-1 S PBAPG J. W. Durham w/o Enclosures S23-1 2301 Market St.

E. W. Callan w/o Enclosures SMB4 5 PBAPS G. A. Hunger, Jr.

w/o Enclosures 61C-1 Cherterbrook l

- R. A. Kankus w/o Enclosures 61C-1 Chesterbrook l

J. F. Hufnagel w/o Enclosures 62A-1 Chesterbrook C. A. McNeill, Jr.

w/o Enclosures S23-1 2301 Market St.

D. R. Meyers w/o Enclosures SMB4 8 PBAPS D. M. Smith w/o Enclosures 63C-3 Chesterbrook G. J. Lengyi w/o Enclosures A4-SS PBAPS DAC w/o Enclosures 61B 3 Chesterbrook Correspondence Control Desk (w/o Enclosures) 618 5 Chesterbrook

_