| Issue date: | 08/25/1999 |
| From: | Wen P NRC (Affiliation Not Assigned) |
| To: | Carpenter C NRC (Affiliation Not Assigned) |
| References | |
| PROJECT-689 NUDOCS 9908300350 | |
| Download: ML20211F517 (8) | |
Text
"
August 25, 1999 MEMORANDUM TO: Cynthia A. Carpentar, Chi:f G:nsric issu:s, Environm:ntal, Financial l
and Rulemaking Branch l
Division of Regulatory improvement Programs l
Office of Nuclear Reactor Regulation i
FROM:
Peter C. Wen, Project Manager Original Signed By:
Generic Issues, Environmental, Financial and Rulemaking Branch Division of Regulatory improvement Programs Office of Nuclear Reactor Regulation
SUBJECT:
NOTICE OF MEETING WITH NUCLEAR ENERGY INSTITUTE (NEI)
REGARDING THE MOTOR-OPERATED VALVE (MOV)
PERFORMANCE PREDICTION METHODOLOGY DEVELOPED BY ELECTRIC POWER RESEARCH INSTITUTE (EPRI)
DATE AND TIME:
September 16,1999 12:30 p.m. - 4:00 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 Room O-384 PURPOSE:
To discuss the planned submittal of a revision to the topical report describing the EPRI's MOV Performance Prediction Methodology, including updated information and additional features of the methodology.
l PARTICIPANTS:
NRC NEl G. Imbro J. Reilly l
D. Terao J. Hosler, EPRI j
T. Scarbrough l
J. Vora P.
en et. al.
Project No. 689 cc: See next page Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, interveners, or other parties to attend as observers pursuant to "Commissic,n Policy Statement on Staff Meeting Open to the Public," 59 Federal Reaister 48344,9/20/94. Members of the public who wish to attend should contact Peter Wen at (301) 415-2832.
4 DISTRIBUTION: See next page gy/
c" File: G:\\RGEB\\PCW\\MNEl0916.WPD OFFICE PM:RGEB SC:RGEB[fy.
O 'I NAME PWen:sw Pcd FAkstulewicz DATE 884/99 8/4C/99 9908300350 990825 kk0 J 659
-f-PDR REVQP ER C
R E% P { Tort;r 0;
/
v psUco a
UNITED STATES j
j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2006H001 "s.,*****/
August 25, 1999 MEMORANDUM TO:
Cynthia A. Carpenter, Chief Generic issues, Environmental, Financial and Rulemaking Branch Division of Regulatory improvement Programs Office of Nuclear Reactor Regulation FROM:
Peter C. Wen, Project Manager C. h Generic Issues, Environmental, Financial and Rulemaking Branch Division of Regulatory improvement Programs Office of Nuclear Reactor Regulation
SUBJECT:
NOTICE OF MEETING WITH NUCLEAR ENERGY INSTITUTE (NEI)
REGARDING THE MOTOR-OPERATED VALVE (MOV)
PERFORMANCE PREDICTION METHODOLOGY DEVELOPED BY ELECTRIC POWER RESEARCH INSTITUTE (EPRI)
DATE AND TIME:
September 16,1999 12:30 p.m. - 4:00 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike
{
Rockville, Maryland 20852
)
Room O-384
{
PURPOSE:
To discuss the planned submittal of a revision to the topical report describing the EPRI's MOV Performance Prediction Methodology, including updated information and additional features of the methodology.
PARTICIPANTS:
NRC NEl G. Imbro J. Reilly D. Terao J. Hoster, EPRI T. Scarbrough J. Vora J. Jackson P. Wen, et. al.
Project No. 689 cc: See next page Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, interveners, or other parties to attend as observers pursuant to " Commission _ Policy Statement on Staff Meeting Open to the Public," 59 Federal Reaister 48344, 9/20/94. Members of the public who wish to attend should contact Peter Wen at (301)415-2832.
3
p
, u:
[
Nuclear Energy Institut3 Project No. 689 cc:
Mr. Ralph Beedle Ms. Lynnette Hendricks, Director l.
Senior Vice President Plant Support l
and Chief Nuclear Officer Nuclear Energy Institute Nuclear Energy institute Suite 400 Suite 400 1776 i Street, NW 1776 l S*et, NW Washington, DC 20006-3708 Washington, DC 20006-3708 Mr. Alex Marion, Director Mr. Charles B. Brinkman, D.renor
{
Programs Washington Operations J
Nuclear Energy Institute ABB-Combustion Engineering, Inc.
Suite 400 12300 Twinbrook Parkway, Suite 330 1776 i Street, NW Rockville, Maryland 20852 Washington, DC 20006-3708 Mr. David Modeen, Director Mr. H. A. Sepp, Manager l
Engineering Regulatory and Licensing Engineering Nuclear Energy Institute
. Westinghouse Electric Company
(
Suite 400 P.O. Box 355 1776 i Street, NW Pittsburgh, Pennsylvania 15230-0355 Washington, DC 20006-3708 l
l Mr. Anthony Pietrangelo, Director i
l Licensing Nuclear Energy Institute Suite 400 1776 i Street NW Washington, DC 20006-3708 Mr. Jim Davis, Director Operations Nuclear Energy Institute Suite 400 1776 i Street, NW Washington, DC 20006-3708 k
~
c:
DISTRIBUTION: MTG. NOTICE W/NEl DATED Auaust 25. 1999 Hard Cooy pentral File i^ '
VPUBLIC PGEB r/f OGC ACRS OWFN Receptionist PWen TScarbrough EMail SCollins/RZimmerman BSheron WKane DMatthews/SNewberry CCarpenter FAkstulewicz JStrosnider/RWessman E. Imbro D. Terao J. Vora J. Jackson JBirmingham GTracy, OEDO
' PMNS OPA
August 25, 1999 MEMORANDUM TO:
Cynthia A. C;rpent:r, Chi;f Generic Issuis, Environm:;ntal, Financial and Rulemaking Branch Division of Regulatory improvement Programs
, g Office of Nuclear Reactor Regulation FROM:
Peter C. Wen, Project Manager Original Signed By:
Generic issues, Environmental, Financial and Rulemaking Branch Division of Regulatory improvement Programs Office of Nuclear Reactor Pagulation
SUBJECT:
NOTICE OF MEETING WITH NUCLEAR ENERGY INSTITUTE (NEI)
REGARDING THE MOTOR-OPERATED VALVE (MOV)
PERFORMANCE PREDICTION METHODOLOGY DEVELOPED BY ELECTRIC POWER RESEARCH INSTITUTE (EPRI)
DATE AND TIME:
September 16,1999 12:30 p.m. - 4:00 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockvil'e Pike Rockville, Maryland 20852 Room O-3B4 PURPOSE:
To discuss the planned submittal of a revision to the topical report describing the EPRI's MOV Performance Prediction Methodology, including updated information and additional features of the methodology.
PARTICIPANTS:
NRC NEl G. Imbro J. Reilly D. Terao J. Hosier, EPRI T. Scarbrough J. Vora J. Jackson P. Wen, et. al.
Project No. 689 cc: See next page Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public petitioners, interveners, or other parties to attend as observers pursuant to " Commission Policy Statemer.t on Staff Meeting Open to the Public," 59 Federal Reaister 48344,9/20/94. Members of the public who wish to attend should contact Peter Wen at (301)415-2832.
DISTRIBUTION: See next page File: G:\\RGEB\\PCW\\MNEl0916.WPD OFFICE PM.RGEB SC:RGEB5 o NAME PWen:sw M FAkstulewicz OATE 884/99 8/4 6/99 L
g* "%g'&
j l
UNITED STATES O'
{
,j NUCLEAR REGULATORY COMMISSION l
l o
'2 WASHINGTON, D.C. 30666 0001
'+9 * * * * *,o August 25, 1999 l
MEMORANDUM TO:
Cynthia A. Carpenter, Chief Generic issues, Environmental, Financial and Ruleinaking Branch Division of Regulatory improvement Programs Office of Nuclear Reactor Regulation FROM:
Peter C. Wen, Project Manager C. W Generic Issues, Environmental, Financial and Rulemaking Branch Division of Regulatory improvement Programs Office of Nuclear Reactor Regulation
SUBJECT:
NOTICE OF MEETING WITH NUCLEAR ENERGY INSTITUTE (NEI)
REGARDING THE MOTOR-OPERATED VALVE (MOV)
PERFORMANCE PREDICTION METHODOLOGY DEVELOPED BY ELECTRIC POWER RESEARCH INSTITUTE (EPRI)
DATE AND TIME:
September 16,1999 12:30 p.m. - 4:00 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 Room O-3B4 PURPOSE:
To discuss the planned submittal of a revision to the topical report describing the EPRl's MOV Performance Prediction Methodology, including updated information and additional features of the methodology.
PARTICIPANTS:
NRC NEl G. Imbro J. Reilly D. Terao J. Hosler, EPRI T. Scarbrough J. Vora J. Jackson P. Wen, et. al.
Prcject No. 689 cc: See next page Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, interveners, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meeting Open to the Public," 59 Federal Reoister 48344,9/20/94. Members of the public who wish to attend should contact Peter Wen at (301) 415-2832.
Nucbir En:rgy Instituta Proj:ct No. 689 cc:
Mr. Ralph Beedie Ms. Lynnette Hendricks, Director Senior Vice President Plant Support and Chief Nuclear Officer Nuclear Energy Institute Nuclear Energy Institute Suite 400 Suite 400 1776 i Street, NW 1776 l Street, NW Washington, DC 20006-3708 Washington, DC 20006-3708 Mr. Alex Marion, Director Mr. Charles B. Brinkman, Director Programs Washington Operations Nuclear Energy Institute ABB-Combustion Engineering, Inc.
Suite 400 12300 Twinbrook Parkway, Suite 330 1776 l Street, NW Rockville, Maryland 20852 Washington, DC 20006-3708 Mr. David Modeen, Director
- Mr. H. A. Sepp, Manager Engineering Regulatory and Licensing Engineering Nuclear Energy Institute Westinghouse Electric Company Suite 400 P.O. Box 355 1776 I Street, NW Pittsburgh, Pennsylvania 15230-0355 Washington, DC 20006-3708 ~
Mr. Anthony Pietrangelo, Director Licensing Nuclear Energy Institute Suite 400 17761 Street, NW Washington, DC 20006-3708 Mr, Jim Davis, Director Operations Nuclear Energy Institute Suite 400 1776 i Street, NW Washington, DC 20006-3708
QlSIRIBUTION: MTG. NOTICE W/NEl DATED Auaust 25. 1999 Hard Cooy
'A:ntral File PUBLIC PGEB r/f OGC ACRS OWFN Receptionist PWen TScarbrough FJea!!
l SCollins/RZimmerman BSheron WKane DMatthews/SNewberry j
CCarpenter
)
FAkstulewicz JStrosnider/RWes,sman E. Imbro D. Terao J. Vora J. Jackson JBirmingham GTracy, OEDO PMNS OPA l
I l
i m -
__