Partially Deleted Ltr Contract:Task Order 47 Entitled, Requalification Exam Insp for Ginna Nuclear Power Plant, Under Contract NRC-03-94-035
ML20211E747
Person / Time
Site: Ginna 
Issue date: 09/22/1997
From: Wiggins E
NRC OFFICE OF ADMINISTRATION (ADM)
To: Sanders L
SONALYSTS, INC.
References
CON-FIN-J-2259, CON-NRC-03-94-035, CON-NRC-3-94-35 NUDOCS 9709300240
Download: ML20211E747 (4)


Text

_ _ _ _ _ _ _ _ _. _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _

OCD w <...,k e

o umicD STAT ES j

,j NUCLEAR REGULATORY COMtAISSION t

W ASHINGTON, D.C. Po'!4M1 ke...../

sw 1 2 =

Sonalysts, Inc.

ATith Ms. LaVeria Sanders Contracting Officer 215 Parkway 14 orth Post Office Box 280 Waterford, Connecticut 06385

SUBJECT:

TASK ORDER NO. 47 ENTITLED *RE00AllflCAT10N EXAMINAT10t4 INSPECTION FOR GINt4A NUCLEAR POWER PLAN 1" UNDER C0!41RACT NO. NRC-03-94 035

Dear Ms. Sanders:

In accordance with Sectio,1 G.4(c) of the subject contract. entitled " Task Order Award," this letter definitizes the subject task order. This effort shall be performed in accordance with the enclosed Statement of Work.

Task Order No. 47 shall be in eff Septenber 14 1997 through September 30, 1997 with a cost ceiling of The amou represents the total estimated reimbur osts, the amount of sents the fixed fee, and the amount of resents the facility's pital cost of money.

The accounting data for the subject task order is as follows:

B&R No..

720-15-11-10-00 Job Code No.-

J-2259 Appropriation No.

31X0200.720 BOC No.-

252A l4RR Unique identifier-NRR94035047 Obligated Amount:

59,617 The following individual is conside ed to be essential to the successful performance of the work hereur. der:

T. Guilfoil.1. Kingsley. W. McGonegal, and G. Weale.

The Contractor agrees that such personnel shall not be removed from the effort under the task order without compliance with Contract Clause H.1, Key Personnel.

Your contacts ouring the course of this task orcer are:

Technical Matters:

Mr. t awrence Vid

, \\ ( 2/

Project Officer

()

(301) 415-3181 Contractual Matters:

Ms. Anita Hughes

)

Contract Speciali_t (301) 415-6526 ll b

9709300240 970922 PDR CONTR l

NRC-03-94-03S PDR l

r-O s.

SEP 12 198l,

  • 2-Contract No. NRC-03 94 035 Task Order No 47 The issuance of this task order does not amend any terms or conditions of the subjectcontract.

Please indicate your acceptance of this task order by having an official, authorized to bind your organization, execute three (3) copies of this document in the space provided and return two (2) copies to the U.S. Nuclear Regulatory Commission. ATIN: Ms. Anita Hu Property Management, T-712, ADM/DCPM/CMB2,ghes. Division of Contracts and Washington, D.C.

20555.

You should retain the third copy for your records.

Sincerely,

< >. w /( G.G. e Elo[ J Wiggins, Contracting Officer Y

Contract Management Branch No. 2 Div!sion of Contracts and Property Manageant Office of Administration

Enclosure:

As stated ACCEP ED:

a

/a and/J A[mtrasiml$d litle J

~'

11 Date l

TASK ORDER NUMBER: S-047, Nodification No. O i

A.

DESCRIPT!DN Requalification examinations are scheduled at the nuclear power plant.

described below.

Details of the examinations follow:

Facility:

Ginna location:

Rochester, NY Docket:

50-244 Date of Exas: 09/15-19/97 Type of Exas: Requal Examinations Inspection Number of Candidates:

Total _ (RO:_, SRO: __, SROV:__, SROI:,J)

Note: X denotes applicable ites related to this task order The number value indicates the number of task per item

_1_

Contractor will assist in Requalification Examination inspection activities.

CONTRACT EXAMINERS SHALL:

In-Office Preparation Activities Prepare for the inspection by reviewing inspection related background documentation and inspection records and prepare a summary of findings as directed by the NRC inspector.

On-Site Insoection Activities x

1 Assist the NRC inspection team during the on-site requalification program evaluation.

The inspection shall be conducted in accordance with IP-71001, and the inspection plan.

x 1

Provide the NRC inspector with a written report detailing the results of the inspettici findings.

This should be in format specified by.the NRC inspector.

x 1

Attend the entrance / exit briefing.

x

__L

  • Travel to / from site, f

4

e w

B.

ESTIMATED LEVEL EFFORT Requalification Examination inspection sug> ort activities.

Management:

4 PSH, Technical: Q6 P Travel for _L examiner (s) between contractor's main office and ~

plant site.

l Clerical:

8 PSH C.

PERIOD OF PERFORMANCE

_09/14/97 thru 09130/97 D.

REPORTS The contractor shall submit to the NRC inspector a written report detailing the results of the inspection findings. This she !d be i

in format specified by the NRC inspector.

E.

NRC HOLB CONTACT:

Brian Huahes. f301) 415-191(

NRC REGION CONTACT:

Don Florek.(610) 337-5185 3

3 a

i i

i 1

e r

--,y-m-