ML20211E375

From kanterella
Jump to navigation Jump to search
Ltr Contract:Task Order 48, Requalification Exam Insp for Calvert Cliffs NPP, Under Contract NRC-03-94-035
ML20211E375
Person / Time
Site: Calvert Cliffs  
Issue date: 09/26/1997
From: Wiggins E
NRC OFFICE OF ADMINISTRATION (ADM)
To: Sanders L
SONALYSTS, INC.
References
CON-FIN-J-2259, CON-NRC-03-94-035, CON-NRC-3-94-35 NUDOCS 9709300113
Download: ML20211E375 (4)


Text

.,

() CQ f**"%,t UNITED STATES p

S NUCLEAR REGULATORY COMMISSION g

m......-,

....+

September 24. 1997 Sonalysts. Inc.

ATTN: Ms. Laveria Sanders Contracting Officer 215 Partway North Post Office Bux 280 Waterford. Connecticut 0638b

SUBJECT:

T,6K ORDER No. 48 ENTITLED 'Rf00ALIFICAT10N EXAMINATION INSPECTION FOR CALVERT CLIFFS NUCl. EAR POWER PLANT

  • UNDER CONTRACT NO. NRC 03 94-035

Dear Ms. Sanders:

In accordance with the section G.4(c) of the subject contract. entitled ' Task Order Award,* this letter definitizes the subject task order. This effort shall be performed in accordance with the enclosed Statement of Work..

Tesk Order No. 48 shall be in effect from October 1. 1997 through November 14 1997 with a cost ceiling of 59.295.00. The amount of 58.488.00 represents the total estimated reimbursable costs, the amount of $729.00 represents the fixed fee, and the amount of $78.00 represents the facility's capital cost of money.

The accounting date for the subject task order is as follows:

B&R No.:

720-15-11-20 00 ($6.867.00)

B&R No.:

720-15-11-10-00 ($2.428.00)

Job Code No.-

J-2259 Appropriation No.:

31X0200.720 BOC No.:

252A g.gg.p gJgg FTS Number:

NRR94035048 Total Obligated Amount:

59.2 %.00 1

'O The following individuals are considered to be essential to the successful performance of the work hereunder:

T.

Guilfoil. 1.

Kingsley. W.

McGonegal.

and G.

Weale. The Contractor agrees that such personnel shall not be removed I from the effort under the task order without compliance with Contract Clause g 93 g g 970926 1

NRC-03-94-035 PDR en an.i onn ou of

>t n.q das 96ES-S10-102 : ~131 NOW10H '3-Wd30-3BH

--________J

' gTRACTS._

503-437d374 __.. _. ~

P $ '57 54i

  • h T0i2 P'-.

C0 1D:

\\

g, t i j

}

i l

t 1 Contract No. NRC 03 94 035 Task Order No.

48 i

Your cy acts during the course of this task order are:

Teinical Matters:

Mr. Lawrence Wck Project Officer (301) 415-3181 dritractual Matters:Ms. Anita Hughes Contract specialist (301) 415 6526 I

The i nnqnce of this task order does not amend any terms or co diti

-subjecjtdodirect.

n ons of the Please n';pd to bind your organization, execute three author it docune

'In the space provided and return two (2) copies to the U.S. Nuclear Regula try Consission, ATTN:

Propert /. Monagement. T-712, NN/DCPM/062Hs. Anita Hughes, Division of C shoulq rhtain the third copy for your reco. Washington, D.C.

20555. You rds.

l Sincerely.

fW i

i E o s J. Wiggins. Contracting Officer Contract Hane96 ment Branch No. 2 Division of Contracts and Property Management Encle6 det Office of Administration As st B.'jd tL. Yens. A.So 4: 4. g w ACan Name 1

b n ku(t W

/

.i th Title 7 "j fV l

'I

$1 Nil b o,te

.I i

I tii

e A.

DESCRIPTION Requu ification examinations are scheduled at the nuclear power plant described below. Details of the examinations follow:

Facility:

Calvert Cliffs Location:

Lusby, MD Docket:

50-317/318 Date of Exam:

10/20-24/97 Type of Exam:- Requal Examinations Inspection Number of Candidates: Total _ (RO:_, SRO:_, SROU:_, SR01:_9) l Note: X denotes applicable item related to this task order The number value indicates the number of task per item i

._L Contractor will assist in Requalification Examination inspection activities.

I l

CONTRACT EXAMINERS SHALL:

In-Office Preparation Activities Prepare for the inspection by reviewing inspection related background documentation and in:;pection records and prepare a summary of findings as directed by the NRC inspector.

l On-Site Insoection Activities x

1 Assist the NRC inspection team during the on-site requalification program evaluation. The inspection shall be conducted in accordance with IP-71001, and the inspection plan.

x 1

Provide the NRC inspector with a written report detailing the results of the inspection findings. This should be in format specified by the NRC inspector.

x 1

Attend the entrance / exit briefing.

x 1

Travel to-/ from site.

o B.-

ESTIMATED LEVEL L. EFFORT Requalification Examination Inspection support activ' ties.

Management:

4 -PSH, Technical: lQ Travel for _1_ examiner (s) between contractor's main office and plant site: __lft PSH Clerical:

8 PSH C.

PERIOD OF PERFORMANCE 10/01/97 thru 11/1497 D.

REPORTS l

The contractor shall submit to the NRC inspector a written report detailing the results of the inspection findings. This should be in format specified by the NRC inspector.

1 E.

NRC HOLB CONTAci:

Brian Huohes. (301) 415-1096 NRC REGION CONTACT:

Don Florek.(610) 337-5185 l

.