Forwards SER Re Beaver Valley Unit 1, 1996 Alternate Repair Criteria 90 Day Rept, Submitted on 960802 & Suppl by .Review of 90-day Rept Concludes That Structural Integrity Analyses & Data Consistent W/Those in GL 95-05
ML20211D839
Person / Time
Site: Beaver Valley
Issue date: 09/17/1997
From: Brinkman D
NRC (Affiliation Not Assigned)
To: Cross J
DUQUESNE LIGHT CO.
Shared Package
ML20211D843 List:
References
FACA, GL-95-05, GL-95-5, TAC-M96250, NUDOCS 9709290254
Download: ML20211D839 (3)


Text

__

\\ Mr. J. E. Cross Septernber 17. 1997 President - Generation Group Duquesne Light Company Post Office Box 4 Shippingport, PA 15077

SUBJECT:

REVIEW 0F BEAVER VALLEY POWER STATION, UNIT NO. 1 (BVPS-1) 1996 STEAM GENERATOR TUBE INSPECTION 90-DAY REPORT (TAC NO. M96250)

Dear Mr. Cross:

By letter dated August 2, 1996, as supplemented July 1, 1997 Duquesne Light Company (DLC)ia 90 Day Re) ort." submitted a copy of the " Beaver Valley Unit 1,1996 Alte l

Repair Criter The 90-day report was submitted to satisfy a commitment as a part of tie NRC staff's approved voltage-based alternate repair criteria for the BVPS-1 technical specifications.

The alternate repair l

criteria were implemented based on NRC Generic Letter (GL) 95-05, ' Voltage-

)

l Based Repair Criteria for Westinghouse Steam Generator Tube Affected By Outside Diameter Stress Corrosion Cracking."

The NRC staff has reviewed the 90-day report for BVPS-1 and has concluded in the enclosure that the structural integrity analyses and data contained in the 90-day report are consistent with those specified in GL 95-05.

This completes our effort for TAC No, M96250.

Sincerely.

Original signed by Tilda Liu for Donald S. Brinkman, Senior Project Manager Project Directorate 1-2 Division of Reactor Projects - I/II office of Nuclear Reactor Regulation Docket No.

50-334 1

Enclosure:

Review of BVPS-1 Steam Generator l

90-Day Report I

hCDI I

cc w/ encl:

See next page DISTRIBUTION:

THarris (SE only) eastsee44b M0'Brien PUBLIC OGC PDI-2 Reading PEselgroth, RI rfnkman k h kf h @ { {' D {f so TLiu ACRS CBeardslee OFFICE PDI-2/PM PDT-$/tb PDL-2/D NAME DBrinkman:cD M0kib JSNr__

DATE i /lI/97

$/h97 i/U/97 0FFICIAL RECORD COPY

/

DOCUMENT NAME:

BV96250.RPT D b OO N 0500 ll l l llllllll ll 4

$* %q k

  • p UNITE) STATES g

NUCLEAR RECULATGRY COMMIS810N WASHINGTON. o,C. SteeHeM September 17, 1997 Mr. J. E. Cross President - Generation Group Duquesne Light Company Post Office Box 4 shippingport, PA 15077

SUBJECT:

REVIEW 0F BEAVER VALLEY POWER STATION, UNIT NO. 1 (BVPS-1) 1996 STEAM GENERATOR TUBE INSPECTION 90-DAY REPORT (TAC NO. M96250)

Dear Mr. Cross:

i By letter dated August 2, 1996, as supplemented July 1, 1997 Duquesne Light Company (DLC)ia 90 Day Resort."suba' tied a copy of the ' Beaver Valley Unit 1, 1996 A Repair Criter The 90-day report was submitted to satisfy a commitment as a part of tie NRC staff's approved voltage-based alternate repair criteria for the BVPS-1 technical specifications. The alteraate repair criteria were implemented based on NRC Generic Letter (GL) 95-05, " Voltage-i Based Repair Criteria for Westinghouse Steam Generator Tube Affected By i

Outside Diameter Stress Corrosion Cracking.'

l The NRC staff has reviewed the 90-day report for BVPS-1 and has concluded in l

the enclosure that the structural integrity analyses and data contained in the 90-day report are consistent with those specified in GL 95-05. This completes l

our effort for TAC No. M96250.

Sincerely.

Mu I Donald S. Brinkman, Senior Project Manager Project Directorate I-2 Division of Reactor Projects - I/I!

Office of Nuclear Reactor Regulation Docket No. 50-334

Enclosure:

Review of BVPS-1 Steam Generator 90-Day Report cc w/ enc 1: See next page

J. E. Cross Beaver Valley Power Station Duquesne Light Company Units 1 & 2 Cc!

Jay E. Silberg, Esquire Bureau of Radiation Protection Shaw, Pittman, Potts & Trowbridge Pennsylvania Department of 2300 N Street, NW.

Environmental Resources Washington, DC 20037 ATTN: Michael P. Murphy Post Office Box 2063 Director-fafety and Licensing Harrisburg, PA 17120 Department (BV-A)

Duquesne Light Company Mayor of the Borrough of Beaver Valley Power Station Shippingport PO Box 4 Post Office Box 3 Shippingport, PA 15077 Shippingport, PA 15077 Commissioner Roy M. Smith Regional Administrator, Region I West Virginia Department of Labor U.S. Nuclear Regulatory Comission Building 3, Room 319 475 Allendale Road Capitol Complex King of Prussia, PA 19406 Charleston, WVA 25305 Resident Inspector Director, Utilities Department U.S. Nuclear Regulatory Commission Public Utilities Comission Post Office Box 298 180 East Broad Street Shippingport, PA 15077 Columbus, OH 43266-0573 Director, Pennsylvania Emergency Duquesne Light Company Management Agency Beaver Valley Power Station Post Office Box 3321 PO Box 4 Harrisburg, PA 17105-3321 Shippingport, PA 15077 ATTN:

S. C. Jain, Vice President Ohio EPA-DERR Nuclear Services (BV-A)

ATTN:

Zack A. Clayton Post Office Box 1049 Columbus, OH 43266-0149 Dr. Judith Johnsrud

'nattnal Energy Comittee Cierca Club 433 Orlando Avenue State College, PA 16803 Duquesne Light Company Beaver Valley Power Station PO Box 4 Shippingport, PA 15077 ATTN:

R. L. Grand, Division Vice President, Nuclear Operations Group and Plant Manager (BV-SOSB-7)

-