ML20211C614

From kanterella
Jump to navigation Jump to search
Notification of 990819 Meeting with CEOG in Rockville,Md to Discuss Methodology Used in TR CE NPSD-1167, Elimination of Pressure Sensor Response Time Requirements
ML20211C614
Person / Time
Issue date: 08/09/1999
From: Stephen Dembek
NRC (Affiliation Not Assigned)
To: Richards S
NRC (Affiliation Not Assigned)
References
PROJECT-692 NUDOCS 9908260045
Download: ML20211C614 (5)


Text

n

' August'9, 1999.

MEMORANDUM TO: Stuart A. Richards, Director Project Directorate IV & Decommissioning.

Division of Licensing Project Management

, Office of Nuclear Reactor Regulation FROM:

, Stephen Dombek, Chief, Section 2 (Original signed by) e Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation

SUBJECT:

NOTidE OF MEETING Wl'TH CE OWNERS GROUP (CEOG) AND M STAFF ON TOPICAL REPORT CE NPSD-1167 DATE & TIME:

Thursday, August 19,1999

/

9:00 a.m. -112:00 p.m.

. LOCATION:

One White Flint North 11555 Rockville Pike Rockville, MD Room O 4-B-6 PURPOSE:

The CEOG requested this meeting to discuss the methodology used in Topical Report CE NPSD-1167, " Elimination of Pressure Sensor Response Time Testing [RTT] Requirements (CEOG Task 1070)." The draft agenda contains the discussion topics proposed by the CEOG.

PARTICIPANTS:

Participants of the meeting from the NRC include members of the Office of Nuclear Reactor Regulation's Electrical and Instrumentation Controls Branch.

NRC/NRR CEOG P. Loeser D. McQuade, ABB/CEOG

. A. Marinos et al.

hh gp etal.

9

- Project No. 692

Attachment:

Draft Agenda cc: See next page

%/k Meetings between NRC technical staff and applicar,ts or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to the " Commission Policy Statement on Staff Meetings Open to the Public," 59 Federal 1

Register 48344,9/20/94. Members of the public who wish to attend should contact Stephen Dembok (NRC) at (301) 415-1455.

(

9908260045 990809

~^$

g u

PDR TOPRP EMVC

'k' OFFICE-PDIV-2/LA PDIV-2/SC s,,

L NAME EPehoY SDembek:rdM QSOb DATE 8/Co /99 8/((

OFFICIAL RECORD COPY F glV-2EE Vntgno819.wpd

. DOCUMENT

p3Lituq g*

UNITED STATES g

j NUCLEAR REGULATORY COMMISSION 2

WASHINGTON, D.c. 20066-0001

,,, +#

August 9, 1999 MEMORANDUM TO: Stuart A. Richards, Director Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM:

Stephen Dembek, Chief, Section 2, c

Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation

SUBJECT:

NOTICE OF MEETING WITH CE OWNERS GROUP (CEOG) AND NRC STAFF ON TOPICAL REPORT CE NPSD 1167 DATE & TIME:

Thursday, August 19,1999 9:00 a.m. - 12:00 p.m.

LOCATION:

One White Flint North 11555 Rockville Pike Rockville, MD Room O 4-B-6 PURPOSE:

The CEOG requested this meeting to discuss the methodology used in Topical Report CE NPSD-1167, " Elimination of Pressure Sensor Response Time Testing Requirements (CEOG Task 1070)." The draft agenda contains the discussion topics proposed by the CEOG.

PARTICIPANTS:

Participants of the meeting from the NRC include members of the Office of Nuclear Reactor Regulation's Electrical and Instrumentation Controls Branch.

NRC/NRR CEOG P. Loeser D. McQuade, ABB/CEOG A. Marinos et al.

et al.

Project No. 692

Attachment:

Draft Agenda cc: See next page Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant i

to the " Commission Policy Statement on Staff Meetings Open to the Public," 59 Federal Reaister 48344,9/20/94. Members of the public who wish to attend should contact Stephen Dembek (NRC) at (301) 415-1455.

m

L CE Owners Group cc w/stt:

Mr. Charles B. Brinkman, Director Washington Operations ABB-Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Gordon C. Bischoff, Project Director CE Owners Group ABB Combustion Engineering Nuclear Power M.S. 9615-1932 2000 Day Hill Road Post Omce Box 500 Windsor, CT 06095 Mr. Ralph Phelps, Chairman CE Owners Group Omaha Public Power District P.O. Box 399 Ft. Calhoun, NE 68023-0399

f TECHNICAL REVIEW MEETING t-

., FOR TOPICAL REPORT CE NPSD-1167. "' ELIMINATION OF PRESSURE SENSOR RESPONSE TIME TESTING REQUIREMENTS (CEOG TASK 1070P August 19,1999 Agenda items Duration Resoonsible Individual

===1.

Background===

15 minutes D. McQuade a.

CEOG Plan for RTT Elimination b.

Phase 1 Efforts c.

Phase 2 -Topical Report 2.

Overview of CE Utility RTT Testing -

15 minutes D. McQuade Methodology 3.

CEOG Technical Approach to Sensor 30 minutes D. McQuade RTT Elimination 4.

Walk Through of Methodology 60 minutes D. McQuade a.

APS Data b.

WSES Data 5.

NRC Comments on CE NPSD-1167 30 minutes P. Looser 6.

Round Table Discussion of CE 30 minutes ALL Methodology a.

ABB b.

NRC Attachment

i.

Meeting with CE Owners Group on August 19,1999

'd QlSTRIBUTION:

EMail BSheron JZwolinski/SBlack SRichards SDembek EPeyton GTracy JZwolinski/SBlack JStrosnider/RWessman JCalvo AMarinos PLoeser OPA (e-mail to OPA)

)

PMNS Hard Coov Central File PUBLIC PDIV-2 Reading OGC ACRS Receptionist (OWFN and TWFN)