ML20211C548

From kanterella
Jump to navigation Jump to search
Amend 22 to License DPR-7,establishing Physical Security Requirements for Shutdown Unit.Security Plan Reflects possess-but-not-operate Status of License
ML20211C548
Person / Time
Site: Humboldt Bay
Issue date: 02/11/1987
From: Berkow H
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20211C534 List:
References
NUDOCS 8702200128
Download: ML20211C548 (2)


Text

-

..- l ppmaog'o UNITED STATES 8 o NUCLEAR REGULATORY COMMISSION

\

[' ,$ WASHINGTON, D. C. 20555

\*..*/

~

PACIFIC GAS AND ELECTRIC COMPANY HWBOLDT BAY POWER PLANT, UNIT NO. 3 DOCKET NO. 50-133 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 22 License No. DPR-7 i

1. The Nuclear Regulatory Comission (the Comission) has found that:

l A. The application for amendment by Pacific Gas and Electric Company (the licensee) dated May 14, 1986, as revised November 17, 1986, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will be maintained in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C. There is reasonable assurance: (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; i

D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

$ h 22gggg[ f50bo 33 p PDR

g -_

2. Accordingly, Facility Operating License No. DPR-7 is hereby amended by the addition of paragraph C.I. which reads as follows:
1. The Itcensee shall fully implement and maintain in effect all provisions of the physical security plan previously approved by the Conmission and all amendments and revisions made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plan, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Humboldt Bay Power Plant, Unit No. 3, Physical Security Plan," with revisions submitted through November 17, 1986. The Guard Training and Qualification Plan and the Safeguards Contingency Plan are incorporated into the Physical Security Plan as Chapters 6 and 9, respectively.
3. This license amendment is effective when the revised physical security plan is fully implemented but in no case more than 90 days from the date of issuance of this amendment.

FOR THE NUCLEAR REGULATORY COPMISSION erbert N. Berkow, Director Standardization and Special Projects Directorate Division of PWR Licensing-B Office of Nuclear Reactor Regulation Date of Issuance: February 11, 1987 l

l

_ -. ,,_