ML20211C527

From kanterella
Jump to navigation Jump to search
Historical Data Summary of the Systematic Assessment of Licensee Performance
ML20211C527
Person / Time
Issue date: 10/31/1986
From: Mary Johnson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
NUREG-1214, NUDOCS 8610210396
Download: ML20211C527 (64)


Text

-

NUREG-1214 Historical Data Summary of the Systematic Assessment of Licensee Performance .

1 U.S. Nuclear Regulatory L Commission Offico of Inspection and Enforcement l-s -c o,,

a khbk$$3 l

l "3

t 88h 2 N M o*

n PDR 1214 p

Y ,

NOTICE Availability of Reference Materials Cited in NRC Publications Most documents cited in NRC publications will be'available from one of the following sources:

1. The NRC Public Document Room,1717 H Street, N.W.

. Washington, DC 20555

2. The Superinteadent of Documents, U.S. Government Printing Office, Post Office Box 37082, Washington, DC 20013-7082
3. Th' National e Technical Information Service, Springfield, VA 22161 s

Although the listing that follows represents the majority of documents cited in NRC publications, it is not intended to be exhaustive.

' Referenced documents available for inspection and copying for a fee from the NRC Public Docu.

ment Room include NRC correspondence and internal NRC memoranda; NRC Office of Inspection and Enforcement bulletins, circulars, information notices, inspection and investigation notices; Licensee Event Reports; vendor reports and correspondence; Commission papers; and applicant and licensee documents and correspondence.

The following documents in the NUREG series are available for purchase from the'GPO Sales Program: formal NRC staff and contractor reports, NRC-sponsored conference proceedings, and NRC booklets and brochures. Also available are Regulatory Guides NRC regulations in the Code of Federal Regulations, and Nuclear Regulatory Commission irsuances.

-Documents available from the National Technical information Service include NUREG series reports and technical reports prepared by other federal agencies and reports prepared by the Atomic i

Energy Commission, forerunner agency to the Nuclear Regulatory Commission.

Documents available from public and special technical libraries include all open literature items, such as books, journal and periodical articles, and transactions. Federal Register notices, federal and state legislation, and congressional reports can usually be obtained from these libraries.

Documents such as theses, dissertations, foreign reports and translations, and non-NRC conference proceedings are available for purchase from the organization sponsoring the publication cited.

Single copies of NRC draf t reports are available free, to the extent of supply, upon written request to the Division of Technical Information and Document Control, U.S. Nuclear Regulatory Com-mission, Washington, DC 20555.

Copies of industry codes and standards used in a substantive manner in the NRC regulatory process are maintained at the NRC Library, 7920 Norfolk Avenue, Bethesda, Maryland, and are available there for reference use by the public. Codes and standards are usually copyrighted and may be purchased from the originating organization or, if they are American National Standards, from the American National Standards Institute,1430 Broadway, New York, NY 10018.

l l

l s .-

NUREG-1214 Historical Data Summary of the Systematic Assessment of Licensee Performance i

Manuscript Completed: September 1986 Date Published: October 1986 j Division of Inspection Programs

, Offica of inspection and Enforcement l U.S. Nuclear Regulatory Commission -

Washington, DC 20555 p s ==%.,

[e" _

ABSTRACT This report presents a history of Systematic Assessment of Licensee Performance (SALP) ratings for nuclear power plant facilities in operation and under construction. The SALP results are listed by NRC region in three sections:

the most recent report, operating facilities, and facilities under construction.

The historical data summary report has been prepared by the NRC Office of InspectionLand Enforcement (IE). Information contained in this report has been updated to include those published SALP reports received before September 16, 1986.

1 l

t l

i NUREG-1214 fii

INTRODUCTION The Historical Data Sumary of the Systematic Assessment of Licensee Performance (SALP) is produced periodically by the Office of Inspection and Enforcement.

This summary provides the results of the assessment for each facility by NRC region and is further divided into the following three sections: Section 1 presen;s the most recent SALP report ratings for facilities under construction and in operation. Section 2 presents a chronological listing of all SALP report ratings for each operating facility. Section 3 presents a chronological listing of all SALP report ratings for each facility under construction. For historical purposes, past construction SALP ratings for facilities that recently have been ifcensed also are listed in Section 3.

The SALP program is an integrated NRC staff effort to consolidate available observations and data and to evaluate licensee performance based on this information. It assesses licensee performance in selected functional areas.

For facilities in operation these areas generally include: plant operations (OPS), radiological controls (RADCON), maintenance (MAINT), surveillance (SURV),

emergency preparedness (EP), fire protection (FP), security (SEC), outages (0UTG),

quality programs and administrative controls affecting quality (QP), ifcensing activities (LIC),-and training and qualification effectiveness (TRG).

The functional areas for facilities under construction are soils and foundations (SF); containment, safety-related structures, and major steel supports (CONT); piping systems and supports (PIPE); safety-related components (SRC); auxiliary systems (AUX); electrical equipment and cables (ELEC);

instrumentation (INST); design-engineering (DSN); quality assurance and administrative controls affecting quality (QA); and licensing activities (LIC).

Based on a review of the consolidated information, each functional area evaluated is -placed into one of three performance categories. A Category I rating designates a high level of performance where reduced NRC attention may be appropriate. A Category 2 rating designates a satisfactory level of performance where NRC attention should be maintained at normal levels. A Category 3 rating i designates a minimally acceptable level of performance where weaknesses are

! evident and both NRC and licensee attention should be increased. An "N" indicates that no rating was given for that category, i

l

,NUREG-1214 y l

l l

l SALP SUMMAR HOST RECENT RATINGS i

r

09/16/86 SALP

SUMMARY

REGION 1 REACTORS IN OPERATION PLANT NAME- RPT OPS RADCON MAINT SURV EP FP SEC OUTG OP LIC TRG

____________________g_____;___ ______g_____ ____g___l___g___g____g___t.__ ___

BEAVER VALLEY 1 12/05 2 2 1 2 1 1 1 3 N 1 N CALVERT CLIFFS 1/2 07/86 2 1 2 1 1 N 1 2 2 1 2 FITZPATRICK 03/86 2 2 2 2 1 1 1 2 2 2 N GINNA 1 02/85 2 2 1 1 2 1 1 1 3 1 N HADDAM NECK 05/86 1 2 2 2 2 N 1 2 2 2 2 HOPE CREEK 1 04/86 N 2 2 N 2 N 1 N 1 2 N INDIAN POINT 2 12/85 2 3 2 1 1 2 1 2 N 2 N INDIAN POINT 3 03/86 2 1 1 1 1 N 1 1 2 2 2 LIMERICK 1 06/06 1 2 2 2 1 N 3 N 1 1 2 MAINE YANKEE 01/86 2 2 2 1 1 1 1 2 N 2 N MILLSTONE 1/2 05/85 -1 2 1 1 1 1 1 1 1 1 N MILLSTONE 3 03/86 2 2 2 3 2 1 1 N N 2 N NINE MILE POINT 1 08/85 1 1 2 1 1 1 1 N H 1 N OYSTER CREEK 1 10/85 2 1 3 2 1 2 2 2 N 2 N PEACH BOTTOM 2/3 06/86~ 2 2 2 2 2 2 3 1 3 2 2 PILGRIM 02/86 3 3 2 2 3 N 2 1 N 1 N SALEM 1/2 12/85 2 1 2 2 2 2 1 2 N 2 N SHOREHAM 07/86 2 3 2 N 1 N l' 2 2 3 3 SUSQUEHANNA 1/2 07/85 2 1 1 2 1 2 1 1 1 1 N THREE MILE ISLAND 1 07/86 2 1 2 1 1 N 2 N 1 2 1 VERMONT YANKEE 12/05 1 2 1' 1 2 N 2 1 2 1 N YANKEE R0WE 04/85 1 2 1 1 1 1 2 1 2 1 N REACTORS UNDER CONSTRUCTION PLANT NAME RPT SF CONT PIPE SRC AUX ELEC INST DSN QA LIC

____________________g_____ ___g____;____;___ ___ ____;____3.__;-__ -__

BEAVER VALLEY 2 07/86 N 1 2 1 2 2 1 N 2 1 HOPE CREEK 1 04/86 N N N N N 2 2 N 1 2 LIMERICK 1/2 01/84 1 1 1 1 1 1 2 2 N 1 NINE MILE PT 2 05/86 N 1 N N N N N N 2 2 SEABROOK 1/2 06/86 N N N N N N N N 1 1 NUREG-1214 1-1

09/16/86 SALP

SUMMARY

REGION 2 REACTORS IN OPERATION PLANT NAME RPT OPS RADCON MAINT SURV EP FP SEC OUTS QP LIC TRG

_____._____.._______;_____:___g______; ..._;.___ __; __:___;____ .._;__. ___;

BROWNS FERRY 1/2/3 09/85 3 '2 3 3 2 3 3 N 3 3 2 BRUNSWICK 1/2 01/86 2 2 2 2 2 2 1 2 2 2 N CATAWBA 1 12/85 2 2 2 2 2 1 1 il 2 2 2 CRYSTAL RIVER 3 06/86 2 2 1 2 2 2 3 2 3 2 '3 FARLEY 1/2 03/85 1 1 1 2 1 1 2 1 2 1 N GRAND GULF 1 07/85 2 2 2 2 3 2 1 N 3 3 N HATCH 1/2 10/85 2 1 3 2 2 2 2 2 2 2 N MCGU1RE 1/2 . 06/86 3 2 2 2 2 3 1 1 2 2 2 NORTH ANNA 1/2 05/85 2 1 2 2 2 2 1 1 2 2 N OCONEE 1/2/3 06/06 1 2 2 1 1 1 2 1 2 2 2 ROBINSON 01/86 2 2 2 2 1 2 1 1 2 2 N SEQUOYAH 1/2 09/85 2 2 3 2 2 2 2 2 3 2 2 ST. LUCIE 1/2 02/05 1 1 1 1 1 2 1 fl 2 1 N SUMMER 03/86 3 1 1 2 1 3 1 2 2 2 N SURRY 1/2 05/05 2 1 2 3 2 N 1 g, 1 2 1 N TURNEY POINT 3/4 02/85 3 2. 3 2 2 2 2 2 3 1 N REACTORS UNDER CONSTRUCTION PLANI NAME RPT SF CONT PIPE SRC AUX ELEC INST DSN QA LIC

_ . ________________:-____;...: ___;-__. __;____;___.g..__;___: ..;___

BELLEFONIE 1/2 09/85 N 2 1 N 2 2 2 N 2 N CATAWBA 2 12/85 N 1 1 2 2 2 2 N 2 2 GRAND GULF 2 01/84 N N N N N N N N N N

SHEARON HARRIS 1 01/86 1 1 1 2 2 3 2 N 2 2 V0 GILE 1/2 11/85 2 2 2 1 2 2 1 N N 1

-WATTS BAR 1/2 11/85 N N 2 N N 2 N N 2 3 f

NUREG-1214 1-2 l

09/16/06 SALP

SUMMARY

REGION 3 REACTORS IN OPERATION PLANT NAME RPT OPS RADCON NAINT SURV EP FP SEC OUTG QP- LIC TRG BIG ROCK POINT 07/06 2 2 2 2 1 2 1 3 2 1 1-BYRON 1 01/86 3 3 2 3 1 2 3 N 2 2 N CALLAWAY 1 08/85 2 2 2 2 2 1 2 N 2 1 N D.C. COOK 1/2 01/86 2 2 2 3 2 2 3 2 3 1 N DAVIS 8 ESSE 12/84 2 1 3 2 3 3 2 1 3 2 3 DRESDEN'1/2/3 01/86 2 2 2 2 1 2 2 1 2 1 -N DUANE ARNOLD 05/86 1 2 2 2 1 1 2 2 2 1 2

FERMI 2 09/85 2 2 2 2 1- 3 2 N 2 2 N KEWAUNEE 03/86 1 1 1 2 1 1 2 1 2 1 N LACROSSE 03/85 2 2 2 1 2 1 2 N 2 1 N LASALLE 1/2 02/86 3 2 3 3 2 1 2 N 3 2 N MONTICELLO 08/86 1 1 1 2 1 1 1 1 2- 1 2 PALISADES 02/06 2 2 3 3- 2 2 2 N 3 2 N PERRY 1 06/86 2 2 2 2 1 2 1 2 2 1 2 POINT BEACH 1/2 12/84 1- 2 2 1 2 2 1 2 2 1 N PRAIRIE ISLAND 1/2 08/86 2 1 1 2 1 2 1 1 2 1 2 QUAD CITIES 1/2 01/86 2 2 2 2 1 2 1 1 2 1 N ZION 1/2 12/85 2 2 2 2 2 2 1 1 2 1 N REACTORS UNDER CONSTRUCTION PLANT NAME RPT SF CONT PIPE SRC AUX ELEC INST DSN QA LIC j ____________._______
_____ ___l____;____;___l____g____ ____:___g___g.__;

BRAIDWOOD 1/2 02/86 N J2 2 2 2 2 2 N 2 2 i BYRON 1/2 01/86 N 2 2 2 N 2 2 N 2 2 i .CLINTON 1 11/85 2 1 1 2 2 2 2 N 2- 1 i PERRY 1/2 06/86 N N 2 N N 1 N N 2 1 l

2 NUREG-1214 1-3

l l

09/16/06 SALP

SUMMARY

REGION 4 REACTORS IN OPERATlON PLANT NAME RPT 0PS RADCON MAINT SURV EP FP SEC OUTS OP LIC TRG ARKANSAS 1/2 09/85 2 1 2 2 2 2 2 1 2 1 N C00PER 04/85 2 2 2 2 2 1 2 1 2 1 N FORT CALHOUN 05/85 1- 1 1 1 2 1 3 1 2 1 N FORI ST. VRAIN 07/86 2 1 3 2 3 1 3 3 3 3 2 RIVER BEND 04/06 2 2 2 2 2 1 2 N 2 2 2 WATERFORD 3 03/86 3 2 3 2 2 2 1 N 2 2 -N WOLF CREEK 04/86 2 2 1 1 2 2 2 N 1 1 2 REACTORS UNDER CONSTRUCTION PLANT NAME RPT SF CONT PIPE SRC AUX ELEC INST DSN QA LIC COMANCHE PEAK 1/2 06/84 N 2 2 2 3 2 1 2 2 2 S. TEXAS PROJ. 1/2 09/85 2 2 2 2 2 2 2 1 2 2 l

l l

4 f

NUREG-1214 1-4

09/16/06

~

SALP

SUMMARY

i REGION 5 REACTORS IN OPERATION PLANT NAME RPT OPS RADCON MAINT SURV EP FP SEC OUTG OP LIC TRG >

_____:___!______:_____ ____:___ ___ ___:____ ___:___!___g

. DIABLO. CANYON 1/2 10/85 2 2 1 2 1 1 1 N 1 1 N PALO VERDE 1/2/3 12/85 2 2 2 2 2 1 2 1 2 2 N RANCHO SECO 11/05 2 3 2 2 2 2 1 1 2 2 2 SAN ONOFRE 1 08/86 2 1 2 2 2 1 2 1 2 2 2 SAN ONOFRE 2/3 08/86 2 1 2 2 2 1 2 1 2 2 2 TROJAN 01/86 2 1 2 2 1 2 2 1 2 2 N WNP2 07/86 2 2 2 2 2~3 2 1 2 2 2 REAC' TORS UNDER CONSTRUCTION i

PLANT NAME RPT SF CONT. PIPE SRC AUX ELEC INST DSN DA LIC

PALO VERDE 2/3 12/85 N 2 2 2 2 2, 1 N N 2 I

i 4

l l

l l

l I

i 4 NUREG-1214 1-5 i

4

___ n - _ _ __ _ _ , , , _ _ _ ~

ISTORy: FACILITIES IN DPERATicN

_,% . m , . -.,___.-

_ _u.1_ . _,. .._m._m w .,=, . m. w_ ..-, ..ua , ,.-.._... 2 .._._- . .e. ..&_. e-,__m.~%e a a _.S

+

A 5

i 4

I G

a 4

1 I

1 i

5 a

f' f

4 i

a 4

4*

I k i e

a i

i i

i i

9 4

e i

e h

i.

i l

1 i r i.

t a

1

?

o 5

i t

I 4

0 1

i I

4 e

  • ee3 r-.m ---m-wa,ewrwwee-*wwe-e re- w.m w-aara,-e-y,w-www.-wwe-sry--rmsegre e-w ms-.-w, . r py y. ---em-ym-+es-ww wym ww- -p--",-pt-r,wmmm--y-=pgT-g--y g p 9v

SALP HISTORY (REACTORS IN OPERATION)

PLANT NAME: BEAVER VALLEV 1 REGION: 1 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRS

==:====================:===:======:=====:====:===:===:===:====:===:===:

02/81 09/01/79 - 08/31/80 3 2 3- 3 2 3 3 2 3 N N

_____ ____________________ ..;______ _____ ____ -__ ___l___:____:.__g___:___

05/82 09/01/80 - 08/31/81 2 1 3 2 2 2 3 2 N 2 N 01/83 12/01/81 - 11/30/82 2 1 2 2 2 2 1 2 N 1 N

_____l_________________.__ ___

-_____:_____l____ ___:__.g __:-___:__.:___ ___;

05/84 12/01/82 - 03/31/04 2 1 2 2 1 2 1 2 N 1 N

_____:____________________: __ ______ ____. ____:-__:___:___l____:...: __;___:

12/85 04/01/84 - 09/30/85 2 2- 1 2 1 1 1 3 N 1 N

_____ ____________________ ___ ... __ _____ -___:___: __:___l___.:_..:___ ___

PLANT NAME: CALVERT CLIFFS 1/2 REG 10N: 1 RPT ASSMT PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG OP LIC TRG

==:====================:===:======:=====:==== ===:===:===:====:===:===:

12/80 10/01/79 - 09/30/80 3 2 3 2 2 2 3 2 3 N N

_____:____________________ ___:__ ___g_____:-___: __:___l___ ____:___ ___:___:

'02/83 10/01/81 - 09/30/82 2 1 2 1 1 1 2 1 N 2 N

_____g_______.. __________:___:______l_____ ____:___ __:___;____:___l___:___g 02/84 10/01/82 - 09/30/83 2 2 3 3 2 1 1 2 N 2 N

_____ -___________________ ___ ______;_____ ____:___:-__ ___;____;___l___: __;

01/85 10/01/83 - 09/30/04 1 1 2 2 1 1 1 1 N 1 N 07/86 10/01/84 - 04/30/06. 2 1 2 1 1 N 1 2 2 1 2

_____;____________________g___ ______ _____g____ ___

___l___ ____ ___:___ ___g 8

No ratings were assigned for the period 10/01/80-09/30/81.

NUREG-1214 2-1

. m . _

SALP HISTORY (REACTORS IN OPERATION)

PLANT NAME: FITZPATRICK REGION: 1 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC 'TRG

=====:====================:===:======:===== ====:===:===:===:==== ===:=== ===:

02/81 12/01/79 - 11/30/80 2. 3 2 2 3 3 3 2 3 N N

_..__g____________________:___ ______3.____:____ ___:_.. ___ ____ ___:.__;___:

09/82 03/01/81 - 02/28/82 3 3 2 2 2 2 1 2 N 2 N 07/83 01/01/82 - 12/31/82 2 2 2 2 1 2 1 N N 2 N-12/84 01/01/03 - 06/30/84 2 2 2 2 1 1 1 1 N 2 N 03/06 07/01/84 - 10/30/85 2 2 2 2 1 1 1 2 2 2 N

_____!__________________ _i___ _..___ _____ ____g__ ___g___:____g___:___:___

PLANT NAME: GINNA 1 REGION: 1 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUT6 QP LIC TRG

===== ==================== ===:======:=====:====:===:===:=== ====:=== ===:===:

07/80 01/01/79 - 05/02/80 2 2 2 2 2 2 2 2 2 N- N

_____ ____________________ ___ ______ _____:____ ___:___ .__ ____;___ ___g___:

03/82 07/01/80 - 06/30/81 1 2 1 2 2 2 2 1 2 N N

_____:____________________ ___:______l_____ ____:___ ___g___:____g___ ___:___l 03/83 07/01/01 - 06/30/82 1 2 1 2 1 2 1 1 N 1 N

_____:___ ________________;___:__ ___:_____:____;__.g __ ___ ____g___ ___ ___:

09/03 06/01/82 - 05/31/83 2 2 2 2 2 1 1 1 N 1 N

_____:. _____.____________ ___ ______g_____l____ ___ ___ ___;.___;__.;___ .__

02/05 07/01/03 - 12/31/84 2 2 1 1 2 1 1 1 3 1 -N

____.g ___________________ ...:____._;. ... ____ .__;___;___l____l___;... .. :

1 1

f NUREG-1214 2-2 i.

w- y- - - - -

v--* r - - - - - - - - - + - - + - - - - - - - - -+ - - - - - - - --- -_._

SALP HISTORY (REACTORS IN OPERATION)

PLANT NAME: HADDAM NECK REGION: 1 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRG

==: ====================:=== ====== =====:==== ===:===:===:====:===:===:

10/80 06/01/79 - 06/01/80 2 2 2 2 2 2 2 2 2 N N i _____ _______________...__ ___ ._____; ____ ____:__. ___g.__;____:___ -__:___:

07/82 07/01/80 - 06/30/81 1 1 1 2 2 1 1 1 1 N N

_____ ________________..._:_ _g.__.__:_____:-___l___ ___g___:____:-__ ___:-__

01/83 09/01/81 - 08/31/82 1 1 1 1 1 1 1 1 N 1 N

_____:___________________.g__. _ ____ _____ -_-_ ___:___;___:____;___:-__g.__;

05/85 09/01/83 - 02/28/85 1 2 1 2 2 2 1 1 2 1 N

_____l_____.______________ ___ ______ _____:____ ___ ___:___l____ ___l___g___:

05/86 03/01/85 - 02/28/86 1 2 2 2 2 N 1 2 2 2 2

_____;____________________g___:______ _____:____ ___ ___ ___: ___:___:___:___

PLANT NAME: HOPE CREEK i REGION: 1 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRS

=====:====================:===:======:===== ====:===:===g===:====:===:===:===:

804/86 11/01/84 - 10/31/85 N 2 2 N 2 N 1 N 1 2 N

_____g______..____________g___ ______:_____ ..._ ___ ___:___ .___:___ ___;__.:

8

Construction ratings were also assigned.

1 i

PLANT NAME: INDIAN POINT 2 REGION: 1 I RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG OP .LIC TRG

, =====:====================:===:======:=====:====:===:===g===:====:===g===:===:

i r

04/81 01/01/80 - 12/31/80 3 2 3 2 2 2 3' 2 3 N N

________________.___:_._l______l_____:____:___ __;___ s___;-__l_-_:___:

09/02 03/01/81 - 02/28/82 2 2 2 3 2 2 1 2 N 2 N

...._:-___________________:___ ._____ _____:____l___:-__: __;-___:___:___ ___

08/03 02/01/82 - 01/31/83 2 2 2 2 N 2 3 1 3 1 N

_____ ____ _______________ ___:______:____.i.___ ___l___;___:___.:___:-__ ___:

02/05 02/01/03 - 07/31/84 2 3 1 1 1 3 2 2 2 2 N

_____g_____.__________... __.:___.__:-____g____l___ .._

-__3.___l___ ___ -__

12/05 08/01/84 - 07/31/85 2 3 2 1 1 2 1 2 N 2 N

_____g______________......:... -_____g_____:-___;___:___;___;____;___g___ -__:

t I

i l

4 NUREG-1214 2-3

l i

SALP HISTORY i

(REACTORS IN OPERATION)  !

a i

f I

PLANT NAME: INDIAN POINI 3 REGION: 1 RPT ASSMI. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG OP LIC TRG

===== ====================:===:======:=====:====:===:===:===:....:=== ==.g...:

04/81 02/01/80 - 01/31/01 2 3 3 2 2 2 3 2 2 N N 4

_____:..______________.___ ___;______ _....: ___ _.. ___:___ ____:__.:___g___:

08/82 04/01/81 - 03/31/82 2 1 1 1 2 1 2' N N 2 N

_____:--__________._______:___:______:-____g____:-__;___:___:____ ___:___g.__:

08/83 01/01i82 - 12/31/82 1 1 1 1 1 1 1 1 N 3 N

_____:.__________________.:...:-_____ _____ __. g___:___:___:____ .__:.__;___g 12/84 01/01/83 - 06/30/84 1 1 1 1 1 1 1 1 2 2 N l 03/86 07/01/84 - 10/30/05 2 1 1 1 1 N 1 1 2 2 2

.....;._____________. ____:___:._____;_____:____l___:___;___:____ ___:... ___;

i PLANT NAME: LIMERICK 1 REGION: 1 RPT ASSMT. PERIOD GPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TR8

=====:====================:===:======:=====:====:===:===:===:==== ===:===:===:

02/85 12/01/83 - 11/30/84 2 2 N N 2 1 3 N N 1 N

__...;_______..___________l___:______:.____g____:___ ___ ___:____ _.:.___ ___g 06/86 04/01/85 - 01/01/86 1 2 2 2 1 N 3 N 1 1 2 i

_____:__. ________________ __ ______;_____: ___ ___ ___g___: ___ ___;___l___l 4

i PLANT NAME: MAINE YANKEE REGION: 1 RPT ASSMI. PERIOD OPS RADCON MAINT SURV EP FP SEC QUTG QP LIC TRG

=====:=..................=:===:======:=====:....:... ===:=== ====:===t===:===:

i 11/80 09/01/79 - 08/31/80 2 2 2 2 2 2 2 3 3 N N

_____:....________________:-__ -____.:_____:____ ___g___:___:____;___l_..:___:

04/82 07/01/80 - 06/30/81 2 2 2 1 1 1- 3 1 2 N N

_____g____._______________ ___:-__.__:_____;____:___ ___ ___:.___ ___ ___ .__l 01/83 08/01/01 - 07/31/82 3 2 2 2 2 1 2 N 3 2 N

. ...._;________.___________; __ ______ ____g____ ___ __ __:____l___ ___ ___:

10/83 07/01/82 - 06/30/83 3 2 2 2 2 1 2 1 2 2 N 09/84 07/01/83 - 06/30/94 3 2 2 2 1 2 1 1 N 2 N 01/86 07/01/84 - 10/31/05 2 2 2 1 1 1 1 2 N 2 N

.. __l_______..______.____:___;.. ___:_____;___.:.__ -__:___ ..__ ___ ___ ___g i

i

.I NUREG-1214 2-4 I

t

i SALP HISTORY

(REACTORS IN OPERATION)

PLANT NAME: MILLSTONE 1/2 REGION: 1 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRG

=====:====================:===:======:=====:====:===:===:=== ====:=== ===:===:

10/80 07/01/79 - 07/01/80 2 2 2 2 2 2 3 2 2 N N

_____l____________________ ___ ______ _____ ____ ___:___ ___ ____ ___ ___:___:

3-07/82 07/01/80 - 06/30/81 1 2 1 1 1 1 2 1 1 N N

_____l_...________._______:___ ______ _____ -___ __; __;___;____;___ ___;___:

01/83 09/01/81 - 08/31/82 1 1 1 1 1 1 1 1 N 1 N

_____g____________________:___ ______g_____ ____g__. ...g___ ___;__.g __ ___

03/84 09/01/82'- 08/31/83 2 1 1 1 1 2 1 1 N 1 N

_____:___...______________ ___:-_____ ____; ___ ___g __ __:____;___:___;___:

05/85 09/01/83 - 02/28/85 1 2 1 1 1 1 1 1 1 1 N 4

_____3..__________________ ___ ______;.____:____ ___:___ ___: ___ ___:___ ___

i

. PLANT NAME: MILLSTONE 3 REGION: 1 i

RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRG

=====:====================:===:======:=====:====:===:===:===:====:===:===:===:

803/86 09/01/84 - 08/31/85 2 2 2 3 2 1 1 N N 2 N

_____ _ ______._____._____: __g______ _____ ____ ___:___ ___ ____ ___:__.g.__

  • Transitional period to operating phase.

i PLANT NAME: NINE MILE POINT 1 REGION: 'l r

RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRG

=====:====================:===:====== =====:====:===:===:===:====:===:===:===:

05/81 02/01/80 - 01/31/81 2 3 2 2 3 2 2 2 2 N N

_____ ____________________:___ ______g_____ ____ ___ __g___g____:___ .._ ___g 09/82 05/01/01 - 04/30/82 2 3 2 2 2 2 1 1 N 1 N

___._ -___________________g___l______:-____ ____ ___ ___ ___: ___l___:___ ___:

08/83 05/01/82 - 04/30/83 2 2 2 N N 1 1 1 N 1 N

..___:....._______________:___ ______ _____;____: ..:... ___ -___g___ ___ -__:

09/84 05/01/83 - 04/30/84 .3 2 2 2 1 1 1 1 N 1 N

_____ _________________.__:__.: ..__.:_____g____ ___;.__ -__: ___ -__ .__l___:

08/05 05/01/84 - 05/31/85 1 1 2 1 1 1 1 N N 1 N

_____l________.___________:___:______ _____ ___;___ ___:-__:.___; __: _.g...:

NUREG-1214 2-5

SALP HISTORY (REACTORS IN OPERATION)

PLANT NAME: Of5TER CREEK 1 REGION: 1 RPT A55MT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC.TRG

=====:====================:===:======:=====:====:===:===:===:====:===:===:===:

10/80 08/01/79 - 07/31/80 2 3 2 3 2 2 2 2 3 N N

_____: ___________________l___: _____l_____ ____ ___ ___ ___:____ ___; __:___

03/81 08/01/80 - 01/31/01 2 2 2 2 2 2 3 2 2 N N 06/02 11/01/80 - 10/31/81 2 2 3 3 2 2 2 2 N 2 N 06/83 02/01/82 - 01/31/83 2 2 2 2 2 2 1 2 N 2 N 10/84 02/01/83 - 04/31/84 1 1 2 1 2 2 2 2 N 2 N

_____ ____________________g___ ______:_____:____;___ ___: __:____ __ __ ___g 10/85 05/01/84 - 06/30/85 2 1 3 2 1 2 2 2 N 2 N

_____:____________________ ___;______:-___ :____ ___l___:-__:-___ ___: __:-__:

PLANT NAME: PEACH BOTTOM 2/3 REGION: 1 RPT ASSMT, PERIOD OPS RADCON MAINT SURV EP FP SEC QUTG QP LIC TRG

=====:====================:===:======:=====:====:===:===:===:====:===:===:===:

07/80 05/01/79 - 05/01/80 2 N 3 2 2 2 3 2 3 N N

_____g____________________:___:______:_____:____:___ ___ ___:____:___: __:___:

09/81 07/01/80 - 06/30/81 2 2 2 1 2 3 2 1 2 N N

_____:-___________________: __ ____ _____:____ ___:___ ___ . __g___ __: __:

10/82 07/01/01 - 06/30/82 2 3 2 2 2 3 2 2 N 1 N 09/83 03/01/82 - 02/28/83 2 3 2 3 1 3 1 2 N 2 N

_____ ____________________:... ______ _____ ____l___;___ ___l____;___ ___:___:

05/84 03/01/83 - 12/31/83 2 2 2 2 2 2 1 2 N 1 N 06/85 01/01/84 - 03/31/85 2 3 1 2 2 2 3 1 N 1 N l _____:____________________:___;______ .____:____i___:___:___:____:___:___i___i l 06/86 04/01/85 - 01/31/86 2 2 2 2 2 2 3 1 3 2 2 l ____. -___________________ ___;______ _____:____:.__ ___ ___ ____g___ ___:___:

l l

l l

i l NUREG-1214 2-6 I

e SALP HISTORY (REACTORS IN OPERATION)

PLANT NAME: PILGRIM REGION: 1 4

RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG OP LIC TRG

=====:==================== === ======:=====:====:===:===:===g====:===:===:===g 04/81 01/01/80 - 12/31/80 2 3 2 2 3 2 2 3 3 N N 10/81 09/01/80 - 08/31/81 3 2 3 2 1 2 2 2 3 N N

_____g__________....______l___g______;_____g____ ___ ___;___ ____ ___ ___ ___

11/82 09/01/81 - 06/30/82 3 2 2 2 1 3 2 2 N 2 N

_____ .___________________;___:______ _____ ___ ___g __ ___ ___;___ ___:...:

01/84 07/01/82 - 06/30/83 2 2 2 1 1 1 2 N 'N 1 N

_____ -___._______________ ___;______:_____g____;___;___l___g ___ ___;___t___

12/84 07/01/83 - 09/30/84 2 3 1 1 3 2 2 1 N 1 N

_____l____________________ ___:______;_____;____ ___;___ ...;____;___ ___l___

02/06 10/01/84 - 10/31/85 3 3 2 2 3 N 2 1 N l' N i

PLANT NAME: SALEM 1/2 REGION: 1 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRG

=====t====================:===:====== , ===:==== ===:===;=== ====:===:===:===:

10/81 07/01/80 - 06/30/81 1 2 1 1 2 2 3 1 1 N N

_____ ___________________ g___g______ _____;____;___:___ ___;____ ___;___ ___

01/83 09/01/01 - 08/31/82 2 1 1 1 2 2 3 1 N 2 N

_____:____________________g___ ______;_____ ____;___ ___g___;____:___ ___ ...;

~01/84 10/01/82 - 09/30/83 3 '2 2 2 1 2 2 1 N 2 N 11/84 10/01/83 - 08/31/84 3 2 2 2 2 3 1 2 N 2 N

_____:_______ ____________ ___:...___l_____ ____ ___g.__:___ ___ __.j___ _..;

12/95 09/01/84 - 09/30/85 2 1 2 2 2 2 1 2 N 2 N

_____:-___________________ ___:______g_____ .___ ___ ___ ___:____ ___g___;___

NUREG-1214 2-7 l

i l

SALP HISTORY (REACTORS IN OPERATION)

PLANT NAME: SHOREHAM REGION: 1 RPT ASSMI. PERIOD. OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRG-

=====:====================:===:======:=====:====:=== ===:===:====:===:===:===:

05/01 03/01/80 - 02/28/81 2 N 2 2 N N N N 2 N N

_____;____________.________ ___ ______:_____ ____: __;___: __: __.g___ ___:___:

07/82 03/01/81 - 02/28/82 N 2 2 N N 2 2 2 N 2 N 09/83 02/01/82 - 01/31/83 2 2 2 N 2 2 2 N N 2 N 05/84 02/01/83 - 02/29/84 1 1 1 1 2 2 1 N N 2 N 05/85 03/01/04 - 02/28/85 1 1 1 1 N 2 1 N N 2 N 07/86 03/01/85'- 02/28/06 2 3 2 N 1 N 1 2 2 3 3

' PLANT NAME: SUSQUEHANNA 1/2 REGION: 1 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUT8 QP. LIC TRG

=====:====================:===:======:=====:====:===:===:===:====:===:===:===:

'04/81 01/01/80 - 12/31/80 2 2 3 3 2 2 2 N 3 N N

_____; _________._________ ___ _____.:_____ ____:-__;___:___g____ ___ ___ ___

-10/82 03/01/81 - 02/28/82 2 N 2 N 2 N 1 N 2 2 N 08/83 02/01/82 - 01/31/83 2 2 2 1 1 1 1 N N 1 N

_____:____________________:___g...___;_____;____:___:-__;___ ____;___ ___;___:

04/84 02/01/83 - 01/31/84 2 2 1 2 1 1 1 N N 1 N

_____ ____________________:.__ ______g_____;____ ___:___:-__:-___ ... ___ ___:

07/85 02/01/84 - 04/30/85 2 1 1 2 1 2 1 1 1 1 N Construction ratings also assigned.

- Ratings for reports 10/82 and 8/83 are for. Unit 1 only.

I d

l l

l

[

NUREG-1214 2-8

SALP. HISTORY (REACTORS IN OPERATION)

PLANT NAME: THREE MILE ISLAND 1 REGION: 1 RPT ASSMT. PERIOD OPS RADCOM MAINT SURV EP FP SEC OUTG OP LIC TRG

=====:====================:===:======:=====:====:===:===:===:====:===:===:===;

06/81 04/01/80 - 03/31/81 2 2 2 2 N 2 2 N 2 N N

____________________:___l______ _____;____:___ ___;___:____:___;___ ___

01/83 10/01/81 - 09/30/02 1 2 2 1 1 1 1 N 1 1 N

______:_____l____ ___:___ __ ____ ___;___:___;

07/04 10/01/82 - 01/31/84 2 1 1 1 1 1 1 N 1 2 N 04/85 02/01/84 - 01/31/85 1 1 1 1 1 1 1 N N 2 N

_____;____________________ ___ -_____: ____; ___:-__ -__;___:---_ -__ ___:-__l 1,

'03/86 09/16/85 - 01/10/86 2 1 2 1 N N N N 1 N N

_____!____________________;___:._____:-____ ____ -__:___l___;--__:___l___:-__

07/86 09/16/85 - 04/30/86 2 1 2 1 1 N 2 N 1 2 1 Interim SALP evaluation.

PLANT NAME: VERMONT YANKEE REGION: 1 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG OP LIC TRG

==:====================:===:======:=====:====:===:===:===:====:===:===:

03/83 07/01/01 - 06/30/82 1 1 1 1 2 1 1 1 N 1 N

_____:____________________ .__ ______:_____g____: __;___;___;____ ___ ___ -__:

11/83 05/01/82 - 04/30/83 2 1 1 1 N 1 1 2 N 1 N

_____ ____________________ ___;______ _____;____ ___:___:___g____ ___ ___:-__

12/84 05/01/83 - 10/31/84 1 2 2 1 1 2 1 1 2 1 N

_____g____________________;__________________g______:___g____l_________:

12/85 11/01/84 - 10/18/85 1 2 1 1 2 N 2 1 2 1 N

____________________:___l______ ____ ____ ___ ___ ___:____ ___; __ ___:

NUREG-1214 2-9

l SALP HISTORY (REACTORS IN OPERATION) 1 PLANT NAME: YANAEE R0WE REGION: 1 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG OP LIC TRG

...===:====================:===:======:=====:====:===:===:===:====:===:===:===:

07/80 05/01/79 - 05/01/80 2 2 2 2 2 2 2 2 2 N N I

_____ ______________ .....;___ _____ ;_____l____l__  :. _l___;____:_ .:___l___

03/02 07/01/80 - 06/30/81 1 2 1 1 1 1 2 1 2 N N

____.:___ ._______________:...:._____l__... ____;___ ___:-__;____;___;.__ ___

01/83 07/01/81 - 06/30/82 1 1 1 1 1 1 1 1 N 1 N

_____;.. .________________;___:._____:.....:____;___;___;. _ ____:_ .;___ ___l 02/04 05/01/82 - 08/31/03 1 2 1 1 1 1 2 1 2 1 N j

...__: _______________....:.__:____..:____.;____:___ ___: _ :.___:___ __g___;

04/85 09/01/83 - 01/31/85 1 2 1 1 1 1 2 1 2 1 N

...__ ____________________:.._:__ ...:. ___:____ ___ _ .: __:..__:.__ ___l___

NUREG-1214 2-10

SALP HISTORY (REACTORS IN- OPERATION)

PLANT NAME: BROWNS FERRY 1/2/3 REGION: 2 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRG

===== ====================:===:======:=====:====:===:===:===:====:===:===:===:

01/81 04/01/79 - 03/31/80 2 3 2 2 2 2 2 2 3 N N 11/82 07/01/80 - 06/30/81 3 3 2 2 N 3 2 2 -3 N N 06/83 07/01/01 - 12/31/82 3 3 3 2 2 2 3 1 3 2 N

_____ ..........__________l___;_____.:-____:____l___;___ ___

___.1.__:___ ___

06/84 01/01/83 - 02/29/84 3 3 3 2 2 N 3 3 3- 2 N

.____;________..._________ ___:______ _____:____;___; ..g__.:____;__.;...:___

09/85 03/01/84 - 05/31/85 3 2 3 3 2 3 3 N 3 3 2

..... ____________________:___:______ ____.:____ ___ ___g___ ____ ___ ___;__.

PLANT NAME: BRUNSWICK 1/2 REGION: 2 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRG

==:====================:===:======:=====:====:===:===:===:====:===:===<

01/81 04/01/79 - 03/31/80 2 3 2 2 2 2 2 2 2 N N-09/02 07/01/80 - 12/31/81 3 3 3 2 2 3 2 N 3 N N

_____g..__________________ ___ _____:_____ ____ ___ ___ ___ ____ ___: __ __:

06/83 01/01/82 - 01/31/83 3 2 3 3 1 3 1 3 3' 3 N

_____g____________________ ___ ______;.____ ____ __.;___:___!____:___ ___ ___;

08/84 02/01/83 - 04/30/84 2 1 2 2 1 2 1 1 2 2 N 01/86 05/01/84 - 10/31/85 2 2 2 2. 2 2 1 2 2 2 N

_____:____________________:___ ______;_____!____ __g___ ___ ____;___ ___ ___:

NUREG-1214 2-11

SALP HISTORY (REACTORS IN OPERATION)

PLANI NAME: CATAWBA 1 REGION: 2 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRG

=====:====================:===:======:=====:====:===:===:===:====:===:===:===:

12/05 03/01/84 - 09/30/85 2 2 2 2 '2' 1 1 N 2 2 2 PLANT NAME: CRYSTAL RIVER 3 REGION: 2 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRG

=====:====================:===:======:=====:====:===:===:===:====:===:===:===l 01/81 05/01/79 - 04/30/80 2 2 2 2 3 2 2 2 2 N N

_____:__ _____..________..:___l______:. . _ ___ ;___;___ _..: ___ ___; __l___

01/83 05/01/80 - 06/30/82 2 2 3 1 2 2 2 2 N 3 N 12/83 07/01/82 - 06/30/83 2 1 2 2 2 2 2 1 2 2 N 02/85 07/01/83 - 10/31/84 2 2 1 3 2 N 3 N 2 2 N v6/86 11/01/84 - 03/31/86 2 2 1 2 2 2 3 2 3 2 3

____.:..._________________ .._ ______;_____:____:_..: __;___ _...:___l___:___

PLANT NAME: FARLEY 1/2 REGION: 2 RPT ASSNT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRG

=====:====================:===:======:=====:====:===:===:===:====:===:===:===:

06/82 07/01/80 - 06/30/81 1 1 1 2 2 2 2 2 1 N N 03/83 07/01/81 - 07/31/82 1 1 1 1 1 2 1 1 N 2 N 04/84 08/01/82 - 07/31/83 1 1 1 1 2 N 1 1 1 2 N

.....:..__________________l___: _____l_____ ____;___ .__ ___ ____ ___:. _:___

03/85 08/01/03 - 12/31/84 1 1 1 2 1 1 2 1 2 1 N NUREG-1214 2-12

SALP HISTORY (REACTORS IN OPERATION)

PLANT NAME: GRAND GULF 1 REGION . 2 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG OP LIC TRG

=====:====================:===:======:=====:====:===:===:===:====:===:===:===:

11/82 07/01/80 - 06/30/81 2 N 2 3 N N N N 1 N N 04/83 07/01/81 - 08/30/02 3 2 N 3 2 N 2 N 2 2 N 01/84 09/01/82 - 09/30/83 3 2 3 3 1 2 2 N- 3 N

_____;____________________ ___ ______ ____ ____:... ___: __ ____ ___:_3 __:...:

07/85 10/01/83 - 04/30/85 2 2 2 2 3 2 1 N .3 3 N

_____ -___________________ ___ ______ ____ ____ __ ___ ___;____:___ ___l___

PLANT NAME: HATCH 1/2 REGION: 2 RPT ASSMT.' PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG GP LIC TRG

===== ====================:===:======:=====:====:===:=== ===:====:===:===:===:

01/81 04/01/79 - 03/31/80 2 2 2 2 2 2 2 2 2 N N


l-------------------- ---l------:-----l----l---l---l---l----l---l---l---:

10/82 07/01/80 - 06/30/81 2 2 2 2 N 2 1 2 2 N N

_____l____________________ ___:______ _____:____ ___g___ ___ ____: .. ___ ___g 03/83 07/01/01 - 10/31/82 2 2 2 2 2 2 2 N 2 2 N 3.__:-_____ _____ ____g___:___:___ ____ __ ___;___;

03/84 11/01/82 - 10/31/83 3 2 3 2 1 N 1 N 3 2 N 10/85 11/01/83 - 06/30/85 2 1 3 2 2 2 2 2 2 2 N NUREG-1214 2-13

SALP HISTORY (REACTORS IN OPERATION)

PLANT NAME: MCGUIRE 1/2 REGION: 2 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTS OP LIC TRG

=====:====================:===:======:=====:====:===:===:===:====:===:===:===:

10/80 05/01/79 - 04/30/80 2 2 2 2 2 2 2 2 2 N N 12/82 05/01/80 - 05/30/82 2 1 1 1 1 2 2 1 N 2 N

_____:..__________________;___:. __ .:_____l____l___:___:___:____;__  :. _:_ .:

10/83 06/01/82 - 04/30/83 1 1 1 2 1 2 1 1 2 1 N

..-_ ___________________ _. ;______l_ ...

12/84 05/01/83 - 08/31/84 3 2 2 2 1 N 2 1 2 1 N 06/86 09/01/84 - 02/28/86 3 2 2 2 2 3 1 1 2 2 2 PLANT NAME: NORTH ANNA 1/2 REGION: 2 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRG

=====:====================:===:======:=====:====:===:===:===:====:===:===:===:

12/80 05/01/79 - 04/30/80 2 2 2 2 2 2 2 2 2 N N

_____:_. _________________:_ .:______:.. __:____:...:___ ___ ____ ___l___;___

11/02 07/01/80 - 06/30/81 2 1 2 2 2 2 2 2 3 N N 04/83 07/01/01 - 09/30/82 2 1 2 2 2 2 1 1 2 2 N

_____:______ ____________l___:______:_____ . __ ___;__ :. _:.___:.__:-__:___

02/84 10/01/82 - 08/31/83 1 1 2 2 1 N 1 1 2 1 N

____ : __________ ._______ ...:. ____l_____ ____ ___ ... ___ -___:___ ___l___l 05/85 09/01/83 - 02/28/85 2 1 2 2 2 2 1 1 2 2 N NUREG-1214 2-14

SALP HISTORY (REACTORS IN OPERATION)

PLANT NAME: OCONEE 1/2/3 REGION: 2 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG OP LIC TRG

==:====================:===:======:=====:====:===:===:===:====:===:===:

10/80 05/01/79 - 04/30/80 2 2 2 2 2 2 2 2 2 N N

_____l____ ___;___ ___:-___ ___: __: __l 10/82 09/01/80 - 05/30/82 2 2 1 2 1 2 1 1 N 2 N

_____l____________________ ___;-_____ _____l____l___:___ ___: ___ ___l___ -__;

10/83 06/01/82 - 04/30/83 2 2 1 3 2 N 1 1 2 2 N

_____:____________________l___ ______l_____l____ -__ ___l___;-___:___l___l___

12/04 05/01/83 - 08/31/84 1 2 1 1 1 N 1 1 2 2 N

_____ ____________________ ___ ______ _____ ____ ___ ___l___l____!___;___ ___l 06/86 09/01/84 - 02/28/86 1 2 2 1 1 1 2 1 2 2 2

_____:____________________;___ ______ _____:. __;.._:-__ ___l____:__ :.__;___:

PLANT NAME: ROBINSON REGION: 2 RP7 ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRG

=====:====================:===:======:=====:====:===:===:===:====:===:===;===:

01/81 04/01/79 - 03/31/80 2 2 2 2 2 2 2 2 2 N N 09/82 07/01/80 - 12/31/81 2 3 2 2 2 2 2 2 2 N N

_____:____________________ .__;______ -____ ____l___ ___: __ .__ -__ __ ...:

08/84 02/01/83 - 04/30/84 2 2 2 1 1 1 2 1 2 2 N 01/86 05/01/84 - 10/31/85 2 2 2 2 1 2 1 1 2 2 N

___l______ ____ ____: __:__ :___;____ ___ ___ ___:

NUREG-1214 2-15

SALP HISTORY (REACTORS IN OPERATION)

PLANT NAME: SEQUDYAH 1/2 l REGION: 2 4

RPT. ASSMT, PERIOD OPS RADCON MAINT SURV.EP FP SEC OUTG QP LIC TRG

=====:====================:=== ======:=====:====:===:===:===:====:===:===:===:

01/81 08/01/79 - 03/29/80 2 2. 2 2 2~ 3 2 2 2 N N

_____: ___________________ ___ ______ _____ ____:___ ___ ___:____ ___ __g___

i . 11/82 07/01/80 - 06/30/81 3 2 2 2 2 2 '2 N 3 N N

. 06/83 07/01/81 - 12/31/82 2 2 2 1 2 N 3 2 3 2 N 06/84 01/01/83 - 02/29/84 2 1 1 1 3 1 2 1 3 2 N

_____:____________________:___ ______:. ___:. __ ___ ___ ___ ____g___:___ ___

, 09/05 03/01/84 -05/31/85 2- 2 3 2 2 2 2 2 3 2 2

--' Ratings for reports ~1/81 and 11/82 are for Unit 1 only.

I PLAN 1 NAME: .51. LUCIE 1/2 REGION: 2 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG OP LIC TRG

=====:====================:===:====== ===== ====:===:===:===:====:===:===:===:

01/01 05/01/79 - 04/30/80 2 2 2 2 2 2 '2 2 2 N N 2

_____ ____________________ ___:______:_____ ____:-__g___:-__:____:___ ___:___

l 01/83 05/01/80 - 06/30/82 '

1 2 1 2 2 2 1 N 2 N

_____ ____________________: .. _____ _____ ____ ___ ___:___:____g___ -__:-__:

4 12/83 07/01/82 - 06/30/03 a 1 1 1 1 2 2 1 2 2 N

_____:____________________: .._i______l_____:____l___ ___ ___ ____;___:-__g___

3 02/85 0'7/01/03 - 10/31/84 1 1 1 1 1 2 1 1 2 1 N

! -----t--------------------:---l------:-----l----l---l---l---:----l---!---!---I j 8. Construction ratings are assigned for reports 1/81 and 1/83 (Unit 2).

4 4

i NUREG-1214 2-16

.-.-m,- , ,,,,r-e,..-....,---,,,--..-4-,_,--. -

.,., ry .--..---,re-, .-..g,w- -

---.-yv,,., .,-p., p .-- , - , - ,.

.=. - -. .

SALP HISTORY (REACTORS IN OPERATION)

PLANT NAME: SUMMER

. REGION: 2 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRG

===== ====================i===:======:=====:====:===:===:===:====:===:===:===:

01/81 09/01/79 - 08/31/80 2 2 2 2 2 2 2 2 2 N N 11/82 09/01/80 - 03/31/82 2 N 2 2 1 N 2 2 2 N N

____________________l___ ______;_.___ ____:___:-__g___;____:...:___ ___

05/83 04/01/82 - 02/28/83 2 1 1 2 1 3 2 N N 2 N

_____ _______________.____:___ ______:_____g____ ___g___ ___;____ .__;___;___

l 10/84 03/01/83 - 06/30/84 2 1 1 2 1 2 1 N 2 2 N 4

_____:____________________;___l______;_____3__._:-__ __. ___: ___ _..:.._ ___

03/86 07/01/84 - 12/31/85 3 1 1 2 1 3 1 2 2 2 N

_____g____________________:-__:______ _____ ____: __ ___ ___!____ ___!___ ___

a PLANT NAME: SURRY 1/2 4

REGION: 2 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRG

== ==================== ===:======:=====:====:===:=== === ====:===:===:

12/80 05/01/79 - 04/30/80 3 2 2 2 2 2 2 2 2 N N

_____g...______.._________ .__:__.___ ___._ ____;___;___ ___l_.__ ___ _.g___:

11/82 07/01/80 - 06/30/81 3 2 2 2 N 2 2 2 3 N N

_____ ____________________g___g._____;_____ ____ __. ___:___:____ __. ___;___

04/83 07/01/01 - 09/30/82 1 2 2 1 2 2 1 2 2 2 N

_____g._____________._____g.._;______g.____:___.:...:-__ __.g___.g.__:___;___

02/84 10/01/82 - 08/31/83 2 3 2 1 1 1 1 1 2 1 N

_____ __....____....______;___3._____!_____ __ _:___ ___;___ ____:.__g___;___;

05/05 09/01/83 - 02/28/85 2 1 2 ~3 2- N 1 1 2 1 N

_____g________..__________ ___ ______ _____g ___ _._;...:___g ___

___l___ ___l l

l NUREG-1214 2-17

SALP HISTORY (REACTORS IN OPERATION)

PLANT NAME: TURKEY POINT 3/4 REGION: 2 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRG

..... ....................g... ...... .....:.... ... ...gn==g....:...gn== ...:

01/01 05/01/79 - 04/30/80 2 2 2 2 2 2 2 2 2 N N

_____ .___________________ ___ _____.g.____g____ ___g...g___g___.g.__g___g___

01/83 09/01/80 - 06/30/82 2 1 2 2 2 2 2 1 N 2 N

_ .__;_______...._________g___g_..___g..__.g____ ___l---l---!----l---l---l---I r 12/83 07/01/82 - 06/30/83 3 1 2 2 2 N 2 2 1 2 N

.___.g....._______..._____g___g______g__.._g....g ..:___g___g.___g___g__.g__.:

02/85 07/01/83 - 10/31/84 3 2 3 2 2 2 2 2 3 1 N

j. ____. _._________.._______g__.;__.___g_____g____g___g___g___;____l___g___g___g i

i 4

k L

1 i

l 1 NUREG-1214 2-18 i

- , , . _ . _ . . . _ . - _ - . , _ _ . , _ _ _ . _ . - , _ _ _ . _ _ _ _ . , . _ _ . , . . . _ . - _ _ _ _ . . . - _ . , . - - ._,-_--_-..,__,..m,,_,.--._-__.,_.- -

k 1

4 4

SALP HISTORY 4

(REACTORS IN OPERATION)

PLANT NAME: BIG ROCK POINT REGION: '3 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG OP LIC TRG

, =====:====================:=== ======l===== ====:=== ===:===:====:===:=== ===:

02/81.09/01/79 - 09/30/80 2 3 1 2 2 2 2 2 2 N N 07/02 07/01/80 - 06/30/81 1- 2 2 2 2 2 1 1 2 2 N

, ____.:.___________.....___:___ __. __:_____ ____:__.g__. ___ ____ ._:___;-__

i 12/82 07/01/81 - 06/30/82 1 3 1 2 2 2 2 1 N 2 N-

! _____: _______________..._ ___ ______:_____:____ ___ _. ...: ___;___ -__l___:

10/83 07/01/82 - 06/30/83 1 2 1 1 1 2 1 N 2. 2 N

, ...__ ________.___________ ___g______ _____;____:_ _ ___ ___:____:___l ._:___

01/05 07/01/83 - 10/30/84 1 2 2 1 1 2 1 1 2 2 N

_____:____________________:_._i______ _____: ___ ___ ___:-__ ____:___:.__ ___l 07/86 11/01/84 - 03/31/86 2 2 2 2 1 2 1: 3 2 1 1

, ___..:.___________________;___:___.__ _____;____ ___l___:___ ___l___l___:-__:

1 PLANT NAME: BYRON 1 REGION: 3 i

RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FF 5EC OUTG QP LIC TRG

====ut====================:===:======:=====:====:===:===:===:====; ==:===l===:

'07/84 01/01/83 - 04/30/84 N 2 N N 2 3 2 N 2 2 N

___..).____._____...___.__ __.:______:_____l__._ ___ __. ___ ____;__.:___:.__:

! 01/86 05/01/04 - 10/31/05 3 3 2 3 1 2 3 N 2 2 N

._...:..__...__... ...____ ...:____..:.____ ____l___ ___;.__ ..__!___:-__l___

8' Constr,uction ratings were also assigned for reports 7/84 and 1/86.

NUREG-1214 2-19

l SALP HISTORY (REACTORS ~ IN OPERATION)

PLANT NAME: CALLAWAY I REGION: 3 l RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TR8

. =====:====================:===:======:=====:====:=,==:===:===:====:===:===:===

504/84 10/01/02 - 11/30/83 N 1 N N N 2 2 N 2 1 N

____.;.___________________;___ ._____:_____ ___;-__;___:-__;..__:-__: . g___;-

08/85 12/01/03 - 05/31/85 2 2 2 2 2 1 2 N 2 1 N Construction ratings were also assigned.

i PLANT NAME: D.C. CODA 1/2 REGION: 3 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP. SEC QUTG QP LIC TRG

=====:====================:===:======:=====;==== ===g===:===:====:===:===:===:

! 02/01 10/01/79 - 09/30/80 2 2 2 2 3 3 2 2 2 N N

_____ _____ ______________ ___: _____ _____3 ___l___g___ ___;_ ._ __g___:___

10/02 10/01/80 - 04/01/82 2 2 2 3 3 3 2 2 3 3 N i

_____g___.________________ ___;______ _____;____ ___ ___ ___ ____:___ __.;__.;

08/83 04/01/82 - 03/31/83 2 2 3 2 2 3 2 2 3 2- N

.__3.__ ____ ___: __ ___:

) 06/84 04/01/83 - 03/31/84 2 2 2 2 2 2 2 1 3 2 N

_____ ____________________;___ ______ _____:____g___:___ ___ ____g___g___g__.:

01/86 04/01/84 - 09/30/85 2 2 2 3 2 2. 3 2 3 1 .N

_____: ___________________; __:..._ _ _____;____ ...:___g __

..__:___l___ ..;

i PLANT NAME: DAVIS BESSE REGION: 3 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRG

=====:====================:===:======:===== ====:===:===:=== ====:-==;===:===:

12/00 11/01/79 - 10/31/80 2 2 2 2 3 2 3 2 2 N N

_____ ______.________..___!__. ______ _____:____:__.: __:___l____ __.:...:__.g 09/82 11/01/80 - 03/31/82 2 1 3 2 1 2 2 1 3 2 N

_____: ______.___________.;___ ....__ ____.;,____g...g__.:___:____:-__:___l___:

10/83 04/01/82 - 03/31/83 2 1 3 2 2 2 2 1 N 2 N

____.g...________________.:...:..____:_____;__. :...:.. __.:____:___ ___:.__g 12/84 04/01/83 - 08/31/84 2 1 3 2 3 3 2 1 3 2 3

_____ .________________.._g.__l_____.:__...:....g___ ___:___ ____:.__:___!___:

i 1

i NUREG-1214 2-20

. - _ . - - _ _ . - - ~. . . _ _ .

4 SALP HISTORY (REACTORS IN OPERATION)'

PLANT NAME: DRESDEN 1/2/3 REGION: 3 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG OP LIC TRG

=====:====================;===;======:=====:====:===:===:===:====:===:===;===!

'11/80 07/01/79 - 06/30/80- 2 3 2 2 3 2 2 2 2 N N

_____ ____________________;___ ____.. ___._g____g.__:___ ___:____:___ ___ ___g 12/82'07/01/80 - 12/31/81 3 3 2 2 1 3 1 1 3 1 N

_____: ___._______________:.. __..__g_____;____g.._;___g___ ____g...g___:___g 07/83 01/01/82 - 12/31/82' 2 2 3 2- 2 2 1 1 2 1 N

____.g....._______________ ___; ____:.____g____ __.;___:___:____;__. ___ __.:

08/84 01/01/83 - 05/31/84 2 3 3 1 1 2 2 1 2 2 N

_ _ _ . . _ _ _ _ . ____________.g.__ ______;_____l____ ___g___g___; __.;___:___ ___;

01/86 06/01/C4 - 09/30/85 2 2 2 2 1 2 2 1 2 1 N

.....:___________________g_____________________g__.g.__g__..:___._____:.

4 PLANT NAME: DUANE ARNOLD REGION: 3 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG OP LIC TRG

=====;====================:===:======:=====!====:===:===:===:====:===:===g===:

12/80 09/01/79 - 08/31/80 2 3 2 2 3 2 2 3 2 N N 07/83 04/01/02 - 03/31/83 2 2 1 2 2 2 2 2 2 2 N

..... ___________.____.___g___g._____ _____g__.. ___;___g___;___.g___: ._;__ g r 11/84 04/01/03 - 08/31/84 1 2 1 3 2 1 3 N N 1 N

.____ ____________________; __g______;_____ __. ___;.__g___ ___. .__;.__;___;

05/86 09/01/84 - 02/28/06 1 2 2 2 1 1 2 2 2 1 2

_______________;___g______:____.g.___:___g.__;_..:___.g.._ .__;___g NUREG-1214 2-21 .

SALP HISTORY' (REACTORS IN OPERATION)

PLANT NAME: FERM1 2 REGION: 3' RPT ASSMT. PERIOD GPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRG

=====:====================:===:======:=====:====:===:===:===:====:===:===:===:

809/85 10/01/84 - 06/30/85 2 2 2 2 1 3 2 N 2 2 N

... .: ______. ___________:___;______:_____;-___ __;___ ___ ____l___:___;...;

  • Construction ratings were also assigned.

PLANT NAME: KEWAUNEE REGION: 3 RPT ASSNT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRG

=====:====================:===:=====,:=====:====:===:===:===:====:===:===:===!

12/80 11/01/79 - 10/31/80 2 2 2 2 3 2 2 2 2 N N 07/82 11/01/80 - 03/31/82 1 1 1 2 2 2 2 1 N 2 N

.____;____________________ ___:______:_____ ____ ___:___:.__g.___:___;__.: __;

11/83 04/01/82 - 03/31/03 2 2 1 2 2 1 2 1 N 2 N 09/84 04/01/03 - 06/30/84 1 1 1 1 2 1 2 1 N 2 N

_____ . ____..___________ __l_.____: ____l____ ___ __ ___ ____ ___;___; __:

03/06 07/01/84 - 12/31/85 1 1 1 2 1 1 2 1 2 1 N

_____:_.._________________ ___l______ ____;____:-__;__.:___:.___: __;-__ ___;

PLANT NAME: LACROSSE REGION: 3 RPT ASSMT PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG OP LIC TRG

=====:====================:===:======:=====:====:===:===:===:====:===:===:===:

01/81 08/01/79 - 07/31/80 2 3 2 2 3 2 3 2 2 N N 06/82 07/01/80 - 06/30/81 3 2 2 2 3 2 2 2 2 N N

_____;.. ________________ ;___;______:___.. ____: __: __: .. ____ ___ -__: __l 01/03 07/01/81 - Oe/30/82 3 2 1 2 3 2 2 2 N 2 N

___..;____________________ ___ _____:_____ ____l___ __;___;__._: __ ..:...:

11/03 07/01/82 - 06/30/03 2 2 2 2 2 1 2 N N 2 N

_____:-___ .__________.___: __; _____;_____;____:___;___: __ ____l___ ___;-__:

03/05 07/01/03 - 12/31/84 2 2 2 1 2 1 2 N 2 1 N

__-__l____________..._____:___:._____;_____ ____l___;___l___ ..__:___ ___ __ ,

( NUREG-1214 2-22 l

l

SALP HISTORY (REACTORS IN OPERATION)

PLANT NAME: LASALLE 1/2 REGION: 3 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG OP LIC TRG

=====:====================!===:======:=====g====:===:===:===:====:=== ===:===:

811/82 07/01/80 - 12/31/81 N 2 2 3 2 2 3 N- 2 N N

_____l_______..___________ .__g__ ___:_____ ____ ___g___ ___!____ _ _: __ ___:

07/83 01/01/82 - 12/31/82 2 2 1 3 2 2 3 1 N 2 N

.____ ____________________ ___ ______g_____:____ ___ ___:__.;____;___ ___ ___l 208/84 01/01/83 - 04/30/84 3 2 2 2 2 2 2 1 2 2 N

____. _________._______.._ ___:-_____:-____ _.._g___ ___ __.i ___l___ ___ _ .

02/86 05/01/84 - 09/30/85 3 2 3 3 2 1 2 N 3 2 N 8

Ratings in reports 11/82 and 7/83 are for Unit 1 ontv.

t 2 Surv. rated unit 1 only; Lic, and Otg. rated Unit 2 only (8/84 &2/86).

PLANT NAME: MONTICELLO

, REGION: 3 i

RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRG

=====g====================:=== ====== =====:====:===:===:===:====:===:===!===:

01/81 10/01/79 - 09/30/80 2 3 2 2 3 2 2 2 2 N N

_____ ________ __________g.__ .___._;_____:____: __; ..;__.g ___ _

_3.__:__.

05/82 07/01/80 - 06/30/81 1 2 1 1 2 2 2 1 1 N N

_____l_..___..___________.:-__:___.__:_____l____ ___ .._;___ ____:___g.__; ._

12/82 07/01/81 - 06/30/82 1 2 2 1 1 2 1 1 N 1 N

____.
____________________:___ ______g_____ -___ ___ ___ ___ ____ __ -__ ___

1 10/03 07/01/82 - 06/30/83 2 2 2 1 1 2 1 1 N 2 N i

l

____________________l___:______ __... ____ ___;___: __;_.__:...:___;___

02/05 07/01/83 - 11/30/84 1 2 1 2 1 2 1 1 2 1 N

_.___:._________ _____ ___g...:______ ...__:..__:.__ ___:__.i.___ .__ .._ __.:

( 08/86 12/01/84 - 05/31/86 1 1 1 2 1 1 1 1 2 1 2

_____g__________________.. ___

..____l_____ ____ __. .. :... ____g __;___t_ _:

i i

l l

NUREG-1214 2-23 l

1

_ _ _ _ _ . . - _ _ _ _ _ _ - . _ - . - ~ _ - - - - - ~ ~ ----- - - - - - - - - - - -

4 SALP HISTORY (REACTORS IN OPERATION)

PLANT NAME: PALISADES REGION: 3 a

l RPT ASSMI. PERIOD OPS RADCON MAINT SURV EP- FP SEC OUTG QP LIC TRG

=====
====================:===:======:=====:====:=== ===:===g====:=== ===i===
02/01 09/01/79 - 09/01/80 3 3 -2 3 2 2 2 2 2 N N

...__ ..___.....___ _____.g___ ____..i__.._:___ :___i___g... ___ g.__ ... ___;

07/82 07/01/80 - 06/30/81 2 2 2 3 2 1 2 2 3 3 N

_____!___________________.;_..: ____ _____ ____ ___ ___:___ .___g___g___ __.:

01/83 07/01/01 - 06/30/82 2 3 2 1 2 2 2 2 2 2 N

.....:.._______._.________ __. ______ -__ _g____g...;.. :___:___.g.__g_..;__.:

10/83 07/01/82 - 06/30/83 1 2 2 1 1 2 2 N 1 2 N

.....g.... ___...__.._____ -__:-_____ .____ ____3...;_..:...;____ _..g...:...:

01/95 07/01/83 - 10/31/84 2 2 2 2 2 2 2 1 2 2 N

____. ______________..____g___:__.._.g._ __g_ __;__.g __:___:_...g___ ___g.. !

i 02/06 11/01/84 - 10/31/85 2 2 3 3 2 2 2 N 3 2 N

...__:__ ... _____________g...g____..:.____g..__g___;___: ..g....g.. :.. g.._

J 4

PLANT NAME: PERRr 1 REGION: 3 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRG

=====:====================:===g======:=====:==== === ===:===:====:===:===:===:

! '06/86 07/01/85 - 04/30/86 2 2 2 2 1 2 1 2 2 1 2

...__;.._____._________...
...;._____;_____ ___.g.. g___g___g____ ___ ___: __:
  • Construction ratings also assigned.

1 PLANT NAME: POINT BEACH 1/2

REGION: 3 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRG

=====:==================== ===!======:=====:====:===!===g===:====:===g===:===:

09/82 11/01/80 - 03/31/82 2 1 2 2 2 3 2 2. N 2 N

..___ ........__...______g...
.____ :..__. ____ ___ ..:... ____: ._l___ ___g 08/03 04/01/82 - 03/31/83 1 2 1 1 2 2 2 2 N 2 N i ...._g....._______________g...g___...:...__g____g...:...:.__g....g...: __g___g
12/84 03/01/03 - 09/30/84 1 2 2 1 2 2 1 2 2 1 N

, .____ _____...___..._____.g...g___.._g...__:_ __g.__:...g___:.__.g.._g. .:.._:

i 1

l l

i l

t I

j NUREG-1214 2-24 I

i i

- . . . _ . . , - _ _ . _ - . . _ . . . _ . . , , . , _ ~ . . _ _ - , . . , , _ _ - , . _ _ . , . - . . , . . . , . _ . . _ _ . , _ , _ _ . . . . . _ _ , . . . _ _ . _ . _ . , , _ , , . . , _ . _ _ _ , , .

SALP HISTORY (REACTORS IN OPERATION)

PLANT NAME: PRAIRIE ISLAND 1/2 REGION: 3 RPT ASSMT PERIOD OPS RADCON MAINT SURV EP FP SEC 00TG OF LIC TRG

=====:====================:===:======:=====:====:===:===:===:====;===:===:===;

01/01 09/01/79 - 08/31/80 2 2 2 2 3 2 2 2 3 N N 05/82 07/01/80 - 06/30/81 1 1 1 1 2 1 2 1 1 N N

_____l____ ____ ........ g__.g _____; ___.:____ -__l_..:_..:____ .._:... -__l 12/82 07/01/01 - 06/30/82 1 1 1 1 2 1 1 1 2 1 N 10/83 07/01/82 - 06/30/03 2 1 1 1 1 1 1 1 N 1 N

____ g._________.. ____...;...:...__.: ..._; ___:...;_..:...:....;...:.__ __;

02/85 07/01/03 - 11/30/84 2 1 1 2 1 1 1 1 2 1 N

_____ ..______.......____;.. :.._ _;...__:.___:...:...:... ....:...;__.g. _:

08/86 12/01/84 - 05/31/86 2 1 1 2 1 2 1 1 2 1 2

_____;. ____..__......__..;___:...___ .---l----l---:--- ---l----l---:---!---

PLANT NAME: QUAD CITIES 1/2 REGION: 3 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG OF LIC TRG

=====:====================:===:======:=====:====g===;===:===:====;===:===:===:

11/80 07/01/79 - 06/30/80 2 3 2 2 3 3 2 2 2 N N

.....: ___. __..._________;__.: _____:.____ -___ ...;___ ___l_ ._;_ .:___ ...:

11/82 07/01/80 - 12/31/01 1 2 2 2 2 2 2 1 N 1 N

...__g.... _______________ __.:._____:.._..;____ ...:...;__ ;____ ...: __ ...

07/83 01/01/82 - 12/31/82 2 2 2 1 2 1 1 1 N 1 N

___..:..____....... _____. __.:..____;_____:. __ ___ ___ ___:.. _:... ___l___:

08/84 01/01/03 - 04/31/84 3 2 2 1 1 2 1 1 2 1 N 01/86 06/01/84 - 09/30/85 2 2 2 2 1 2 1 1 2 1 N

.....:......__________....:.__:.___.. ___..: .. g...;__.:...;_...:.. :...:...:

l NUREG-1214 2-25 t

(

SALP HISTORY .~

(REACTORS IN OPERATION)

PLANT NAME: ZION 1/2 REGION: 3 ,

RPT ASSMT. PERIOD OPS RADCON MAINT SUff! EP FP SEC OUTG QP LIC 'TR8

=====:====================:===:======:=====:===e:===:===!===:====:===:===:===:

11/80 07/01/79 - 06/30/80 2 3 2 2 3 2 2 2 2 N N

_____:.___________________ ___ ._____:__...:____ ___g.._l_..:___. ___ __ :___

11/82 07/01/80 - 12/31/81 2 3 2 2 2 N 2 1 N 2 N

.____;____________________:___ . ____ __ .:____ ___:.__ ...:____ ___l___:___

08/83 01/01/82 - 12/31/82 2 2 2 2 2 2 2 1 N 2 N

_____ ___ ._______________ __;______;_____;____l___ ___!__.:..__l___ ___ __

08/84 01/01/83 - 04/30/84 2 2 1 2 2 2 3 1 2 1 N 12/85 05/01/04 - 10/30/85 2 2 2 2 2 2 1 1 2 1 N l

l l

l NUREG-1214 2-26

- . . .-. .- . -- - ---_. . _~_- - -.

I 1

t l

i SALP HISTORY (REACTORS IN OPERATION) l PLANT NAME: ARKANSAS 1/2

, REGION: 4 I

RPT ASSMT. PERIOD OPS RADCON NAINT SURV EP FP SEC OUTG QP LIC TRG l

=====:====================g===:====== =====:====:===:===:=== ====:===:===:===:

09/80 01/01/79 - 08/19/80 2 2 2 2 2 2 3 2 2 N N

_____;.......____ .______. .._g______:_____ ....:...:___:___ ....:...: __:___

09/02 07/01/00 - 06/30/81 2 2 2 3 1 2 2 2 1 N N i .__._ ..__..._____________

-__3._____ .___.:____: __g___ _ .g....:___:.__:...:

03/83 07/01/81 - 06/30/02 3 2 3 3 3 2 2 2 3 2 N

_____ _...____________....g __ _. __.:___..:....:...:___ ___g___ .. ___ -__:

11/83 07/01/02 - 06/30/83 2 3 3 2 2 3 1 2 2 2 N

.....:..... .___.......... ___ ._____g.....:.___:.__:-__:.._ ____ ___ -__ __.:

09/84 07/01/03 - 06/30/04 2 2 3' 3 2 2 1 1 2 1 N j __ ..:.......________...._:...:_____.g_____:....:_.. ___:-__:___ :-__ ___:___i 09/85 07/01/06 - 06/30/85 2 1 2 2 2 2 2 1 2 1 N

...__;...__..___.____...__;... ___.__ ....:.... _..: .. ___:..__l___;___: ..:

i i

PLANT NAME: COOPER REGION: 4

. RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG OP LIO TRG l =====:====================:===g======:=====:====:===:===t===:==== === ===:===!

08/80 01/01/79 - 08/06/80 2 2 2 1 2 2 2 1 2 N N j ..___g_.....__ ...___..... _._ _...__ _....: __.g.._:. . ___;.... ___ ___g__.

06/02 07/01/80 - 06/30/81 1 2 2 1 3 2 2 1 1 N N

. ...g___ . ..____........ ...g....._ ..___ ..__
___ ...:...:___. .._g.._ ___3 11/02 07/01/01 - 06/30/82 1 1 1 1 3 1 1 1 2 1 N

_________..______...:._.t....__ _____ ... g.._ ...g.__l_...g.__:...g...:

I

12/83 07/01/02 - 06/30/83 2 2 1 1 2 1 2 1 2 1 N

...._:_..................g.__g____..:.....g_...:...:_..___....:.__g___:__.g_

l 04/05 07/01/03 - 01/31/85 2 2 2 2 2 1 2 1 2 1 N l

.....:......... ______....:...:._.... -___.i .__:__.g_..:...:.___ .. :...:...:

I l

I NUREG-1214 2-27 i

i i

, , - , n,v.n--_~..n ---------,r-- .m m,-,,- r---- - ,-n--ev- ~-,r- ~ ~ ~

I 4

SALP HISTORY (REACTORS IN OPERATION) 4 j PLANT NAME: FORT CALHOUN REGION: 4 4

RPT ASSMT. PERIOD - OPS RADCON MAINT SURV EP FP SEC OUT6 QP LIC TR6

=====:====================:===:======:=====g====:===:===g===g==== ===:=== ===:

. 08/80 01/01/79 - 06/30/80 2 2 2 2 2 2 2 2 2 N N

___.. ___........______...;__.;______;_____;____;... -__ ..:-__.g...:...:___

08/02 07/01/80 - 06/30/81 2 2 2 2 2 2 2 N 2 N N

..___g.._________.._______;...:__.___ _____ ....:...:__.g.__ ____;__ ;__.;___g 12/02 07/01/81 - 08/31/82 1 2 2 1 2 2 2 2 3 1 N l .....:....________________;.._ ......:.__..:.___ ___:___; .. ____ ___;___g___

02/04 09/01/82 - 08/31/83 1 2 2 1 2 2 2 1 3 2 N 2

__...:............__ _____g.. ;______;_____;___.g___g___g___ -___ -__:-__;___

1 05/05 09/91/03 - 02/28/85 1 1 1 1 2 1 3 1 2 1 N j .. __l_______________..__.;___;......;___..;....:.__;...;___g____l___:__.;___

t I

, PLANT NAME: FORT ST. VRAIN REGION: 4 i

! RPI A55HT. PERIOD OPS RADCON HAINT SURV EP FP SEC OUTG QP LIC TRG

=====:====================;===g======:=====:====:===g===:===:==== === === ===g 10/80 10/01/79 - 10/01/80 2 2 2 2 2 2 -3 2 2 N N

___..: ________....._____.;___ ...__;___..:....;___g...:...:._..g... _.. ...

06/82 07/01/80 - 06/30/81 3 2 2 2 2 2 2 2 2 N N i .....
.............__.....;___ __....:.....:....:...:.._:-__; ___:__.;-__ ___g 01/03 09/01/01 - 08/31/02 3 2 1 2 2 1 2 N 2 1 N
.___.g.__._...............;...______
-__.___.:...;.._;_-_..__;-..:-____.

06/04 09/01/82 - 09/30/03 3 2 2 2 1 N 2 2 2 3 2 j

_____g...........__.......g.__ ____..:.....:....: .. _. g ._g____ ___ ___g.__g j- 05/05 10/01/83 - 02/28/05 3 1 3 2 2 2 2 1 3 3 2

..__.g......_____........g_____.___:-___.g....g...:...:..._...:._____!___:

t l 07/06 03/01/05 - 05/06/06 2 1 3 2 3 1 3 3 3 3 2

.__..g............__..____
..:......g.___.i ___ ...:... ___:_...:...:...:. .;

l l

4 4

i l

l 1

I i

I NUREG-1214 2-28

SALP HISTORY (REACTORS IN OPERATION) 1 PLANT NAME: RIVER BEND REGION: 4 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRG

.....:....................:... ======:===== ....g...:..=;===:====:...:...:...;

'02/05 08/01/83 - 12/31/84 2 2 N N 2 N 2 N- 2 2 N a .....g.___.._____........_ ...g_...._g.__ _g___.:.__:__.: ..

____3 ..;.__g...:

04/06 01/01/85 - 01/31/86 2 2 2 2 2 1 2 N 2 2 2

___. :..._____ .__......__g...:..... g..___;_...; ..:...g___; ... ___ -__ ..:

  • Construction ratings were also assigned.

l PLANT NAME: WATERFORD 3 REGION: 4 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG OF 'LIC TRG

.....g....................:...!...===:=====:====:===:===:===:====g...:..=;...:

07/82 07/01/80 - 06/30/81 3 N N 2, N N 2 N 3 3 N

.....g.........___........:...:___...:.____;..._;_ .:.._ ___:_...g___g .. ___:

12/02 07/01/81 - 06/30/02 2 3 N 3 N 2 1 2 3 2 N

___..:....____.. ..____...:___ ......:.....:____; ..:__.g___ _...;___:__.g.__;

+

01/04 07/01/82 - 06/30/03 2 2 3 N 3 1 2 N 1 2 N

.....:...____ .____..____.g_..:...__ :..... ___.:...:.__g.. ____g___ .. :...;

03/06 12/18/84 - 12/31/85 3 2 3 2 2 2 1 N 2 2 N

___._g_........_____...... ___ __...g.....:.__.g...:...g__.:....:__ :...: ..:

PLANT NAME: WOLF CREEK i

REGION: 4 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG OP LIC TRG

.....:....................:===:...... .....g.... ...:=== ... ==== === === ..

802/85 08/01/83 - 09/30/84 N 2 2 N 3 1 2 N 2 1 N

____.g.......__ ..____....:_. :._____ _....:. .  :.__g___:__.g....g___ ...:.._:

04/86 10/02/04 - 01/31/06 2 2 1 1 2 2 2 N 1 1 2

.... _..___.....______... __. ___.._g. ...:____:___ ...:___!____ __;...:...:

' Construction ratings were also assigned.

NUREG-1214 2-29

b SALP HISTORY i

i (REACTORS IN OPERATION) i PLANI NAME: DIABLO CANYON 1/2 l REGION: 5 RPT ASSMT PERIOD OPS RADCON MAINT SURV EP FP SEC.0UTG QP LIC TRG

! === .:====================:===g====== =====1 ===g===:===g===:====:===:===:===:

203/83 07/01/01 - 12/31/82 2 2 2 2 1 2 1 N 2 2 N i, _____ _____..____...______ ...:______:_____g____:___:___:___:____:___ ___ __:

I 11/04 01/01/83 - 06/30/04 2 2 2 2' 2 2 1 N 2 2 N.

_____ _. ________________.;___:______t..___:___. ___ _. :___g____ ___ __.g..  ;

1 i

10/85 07/01/84 - 07/31/85 2 -2 1 2 1 1 1 N 1 1 N

.... : .______.___ ....__.: ..g...__.g.....g_...g__.g.__g___ -__.g...:...g__.:

i

  • Construction ratinos were also assioned.

i PLANT NAME PALO VERDE 1/2/3 l REGION' 5 I

\

PPT ASSMT.~ PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC'TRG

===== ======....==========g===
=== .. === . ====:=== ... ===:==== ===:===:===:

1 1 '06/83 07/01/81 - 02/28/83 2 1 2 N N N N N .N 1 N i .....;_.....___.._________g__.: ____.g..___ .__.g.__:.__ ___ -__. ___:___ ...:

06/84 03/01/03 - 03/31/84 2 2 2 N 1 N 2 N N 2 N

.....:...........____..___g_.. ______g_____g.___!___g...:...g_...:.. :.__g___: .

1 12/85 04/01/04 - 09/30/05 2 2 2 2 2 1 2 1 2 2 N

_____:......______________:__g______g.....g.__.g...g...:._g.___g___g...;...:

i ' Construction ratings also assigned for reports 6/83, 6/84, and 12/85.

i, l

PLANT NAME: RANCHO SECO REGION: 5 j RFT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC 0UTG OP LIC TRG

.....:..................== ...;......:=====:====:===:=== ===:====t===g=== ...g i 08/80 04/15/79 - 04/15/80 2 2 2 1 2 2 2 2 3 N N 4

___..
...__.......______..g.__ __....:.__._g_...:_.. ... _.. ____ ...:...:.__g i

j 04/82 06/06/80 - 06/30/81 2 2 2 2 2 1 2 1 2 N N

.....;..____________.....
...:....._ _____ ..__ ___:.._ __ _... ___ __.g___g i 03/83 07/01/81 - 09/30/02 2 2 2 2 2 2 1 'l N 1 N j ___.. _.........__...___ . .__:......: ____;.__.g... ___ _..g____g...:___ _..g i 06/04 10/01 82 - 11/30/03 3 2 2 3 2 2 1 i N 3 N j ....______......__..__.g_._g_____.g.....____:______._._______:...g__.-

11/85 12/01/83 - 05/21/85 2 3 2 2 2 2 1 1 2 2 2

...._ . _____.....____ .
..:.____.g.__._ ____:___

___l__. ____3.._i___:.__l i

I 1.

1 NUREG-1214 2-30

-. -- m.m-----m.-mm.-r.,-v sr, - - -- .-,..---.v...-nom...n---m ,,m nr-,--w.,----- .egs,+,-,m.--- y-m- m w4m sy m w - wm s v-v z -m nm e--n-,wr,----g

i t SALP HISTORY l (REACTORS ~I N OPERATION)

PLANT NAME: SAN ONOFRE 1 REGION: 5

. RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG OP LIC TRG 4

.....:====================:=== ======l..... ====:===:===:=== ====:=== === ===:

09/81 05/16/80 - 06/30/81 2 3 3 1 2 2 3 1 2 N- N j _____..__...____.__.________:__.___;-______.:...:....:.___l_..g_____:-

01/83 07/01/81 - 06/30/02 3 3 3 2 1 2 3 N 2 '2 N i- __...

.___.....__..__...__l__. _____. __...g____ ...:...:... .... ... -_.g...t

11/84 06/01/83 - 09/30/84 1 2 1 2 1 1- 2 N N 2 N l ____.
_.__..__. .....____.g__.g......: ____ ____!___ ___:__.;____ _..:.__g_._

08/06 10/01/04 - 05/31/06 2 1 2 2 2 1 2 1 2 '2 2

', PLANT NAME: SAN ONOFRE 2/3

, REGION: 5 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG OP LIC TRG

..... ................... 1===:====== =====:====:=== ===:===:====:===:===:===:

, 09/80 06/01/80 - 06/30/81 2 3 3 1 1 2 3 1 2 N N

_ _ _ . . g . _ _ _ _ _ _ _ _ _ _ _ _ _ . . . _ _ . g . . . _ _ _ _ _ _ : _ _ _ _ _ _ _ _ _ _ _ _ : _ _ . : . _ _ l _ _ _ _ ; _ _ _ : _ _ _ : ,_ _ . ;

i 12/02 07/01/01 - 06/30/82 2 2 2 2 1 2 2 1 2 2 N

. . _ _ . ; _ _ _ _ . _ _ _ _ . . . . . _ _ _ _ g . ,_ _ _ _ _ _ _ 3 _ _ _ _ ; . _ _ _ l _ . . : . _ _ : . . . ; _ _ _ _ : _ _ . : _ _ _ : _ _ _ g

11/84 06/01/83 - 09/30/84 3 3 2 2 1 2 2 2 N 2 N

_____g.....______________g.____....:.....:.___.____;___;_______:___:__

f 08/06 10/01/04 - 05/31/86 2 1 2 2 2 1 2 1 2 2 2

_____l_. .........________ .__ _____.;. ... .___;___ __. __.:.__.:.__3.__;...:

l NUREG-1214 2-31

1 l

s SALP HISTORY (REACTORS IN OPERATION)

' PLANT NAME: TROJAN REGION: 5 RPT ASSMT. PERIOD OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRG l .....:....................:...:......:.....:....:...:...: ..;....:...:...;...! .

i 10/80 09/01/79 - 08/31/80 '2 2 2 2 2 2 2 2 -N N

...._;-__......._________...:.____;__'2- ___;___.;___;.. :.__:____ .._:___ __.;

i 04/02 06/01/80 - 06/01/81 1 2 2 2 1 1 2 1 2 N N t .....j . ... ___..........:-__;______;. .__; _..;___:___:___ ....: __:___;___;

i 12/02 07/01/01 - 08/31/82 2 1 1 2 1 2 1 1 2 1 N

...__;_______________.____;_ .:....._g_____;____:___;___ ___:____g___:___:___g 04/84 09/01/82 - 08/31/83 2 2 2 1 1 2 1 1 3 1. N

_.__.:___________.........g...:......:_____ ____ .. __.;___;__..:.._ __.:.__g i v1/85 09/01/83 - 10/31/84 3 1 2 1 1 2 1 1 3 2 N

.....; .._.___..__.__ ....g...:......;...__ ____ ...g...:__.;.__.g.._g __g___g

] 01/86 11/01/84 - 10/31/85 2 1 2 2 1 2 2 1 2 2 N

.....:____...__... _______i_..:______:_ .._ . ..:...:...:._.:..._: __;___: __i i

a f '

PLANT'SAME: WNP2 I

REGION: 5 RPT ASSMT. PEB10D OPS RADCON MAINT SURV EP FP SEC OUTG QP LIC TRG.

, .....:....................:...:......:.....i....!...:...:...:....:...:...i...:

! 811/81 05/01/80 - 06/30/81 2 N 1 1 N N N N 2 N N

___..:......__....____... :...:......:..___g....g...:... __.:__..:...g__.g.__

12/02 07/01/81 - 07/31/82 2' 2 N N N N N N 2 1 N

-....:........._____....._;... ...___g..... ___.;__.:___g.__ ____:_._g__.g ._;

i 12/83 08/01/82 - 07/31/93 2 2 N N 2 N 2 N N 2 N

. _ _ _ . ; _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ g . . . : . . . . _ _ _ . . . . _ _ _ _ . . . . . . g . . . : . _ _ _ i . . _ g _ _ _ l _ _ .' :

I 05/85 08/01/03 - 01/31/85 2 2 2 1 2 2 2 N 2 2 N

.____ _________________... ___g______; _... __._ ...g...:.._:..__g__.;...:.._:

i 07/86 02/01/05 - 01/31/86 2 2 2 2 2 3 2 1 2 2 2

.....:................... g...:....__g.....;....:...:...:... ..._;.. : __; __:

  • Construction ratinos also assigned for rents. 11/81, 12/82, and 12/83.

i l

l

{

NUREG-1214 2-32

-- - _ . - - _ . - - - - _ . _ _ . _ _ _ _ _ _ _ _ _ , . . _ . _ _ ~ _ _ . _ . .

e SALP HIS10RV: FACILITIES UNDER CONSTRUCTION A

l 4

, . . - . . , . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ . . _ _ _ . _ _ _ ~ , _ . , _ . _ _ _ _ _ _ _ , , , , , , _ _ . _ . _ . _ . _ _ . _ _ _ . . . _ . _ . - _ . _ . _ . - _ - _ - _ - _ _ _ ~ _ _ . - _ _ _ _ _ _ _ _ _ . -

SALP HISTORY (REACTORS UNDER CONSTRUCTION) 1' PLANT NAME: BEAVER VALLEY 2 REGION: 1 RPT ASSMT. PERIOD SF CONT P1PE SRC AUX ELEC INST DSN QA L1C

.....:................... 3=== ....:====:===:====g.... ====:===g===l...:

04/81 03/01/80 - 02/28/81 2 2 2 2 2 2 2 N 2 N

...__g________......__.._.i. _i__..g____
...:___.g_... ___ i.__:___ .. :

03/82 09/01/80 - 08/31/82 1 2 2 N N 2 N N N N

____.g ____...._____... ..:___:..._g____g.._ ....:___.g.... ___l__.g.__

05/84 12/01/82 - 03/31/84 N 1 3 1 1 3 2 3 N 2

)

..___ ___ ....____..______g...:.___g..._ ___:.___;.__.g.___3___ .._g__.g i 06/05 04/01/84 - 03/31/85 N 1 2 1 1 2 2l 2 2 2 4

...__:..____....______....:___ .... ____:-__ .__.g.__. _.._g.__g_..:.__:

j 07/06 04/01/85 - 03/31/86 N 1 2 1 2 2 1 N 2 1

...__:.______...__________g___l____g.___3.__g__..g____g ___ ___g.._i___g PLANT NAME: HOPE CREEK 1 i REGION: 1 RPT ASSMT. PERIOD SF CONT P1PE SRC AUX ELEC INST DSN DA L1C

.....
..======.......==...:===:.... ==== ===:====:====:.... ... ===:===:

01/01 11/01/79 - 10/31/80 2 2 3 2 N 2 N N N 2

...__ .___....________..._ ..  :.___g.___;___ . _:.__.g ...:_._:___ __.:

03/82 07/01/80 - 06/30/81 N 2 1 1 1 1 N 1 2 N l .....:.._______...........:___:____3. ..

__l__..g____:.___g__.i.._i_..:

11/82 09/01/01 - 08/31/82 1 2 1 2 2 N N N N N

.....
..................__:...:____ ____:__.g____g....:..._ .. g___ ...

08/03 09/01/82 - 07/31/83 1 2 2 1 2 N 2 N N 2

___.. .... ______.....____:...:____:..._:__.g ...g..__ ....:___:...g_._:

04/85 08/01/03 - 10/31/84 N 1 2 1 1 2 2 N 1 2 r .....

.____....__........_l_..:.__ g.... __.t..._l___.i.___:___g___l___:

{ '04/06 11/01/04 - 10/31/85 N N N N N 2 2 N 1 2 l ...._g..........______....;_..:....g....)__. ____:__ .:__._:.._g.__3...:

Operations ratings were also assigned.

l 4

l l

l l

f 1

, NUREG-1214 3-1 t-I

,.-,.-.v-.-_,,-..-.--

SALP HISTORY (REACTORS UNDER CONSTRUCTION)

PLANT NAME: LIMERICK 1/2 REGION: 1 RPT ASSMT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN QA LI"

.....:....................g=== ....:....;...:.... ....g... g... ...g.. g 12/80 10/01/79 - 09/30/80 2 2 2 2 2 2 2' N 3 N

_____g.....__...._______..g...g.... ....:.__g___.g.___g.__.g.__g___g_..:

08/81 07/01/80 - 06/30/81 N 2 1 2 2 2 2 2 2 N

_____g______________._....g.__l___ :___.g.__ __._g___.;____g__.:_..g...

, 04/83 01/01/82 - 12/31/92 1 1 1 N 2 2 2 2 N 2

_____g_________________ .. .__g____g....g. _g.___; ___g_. _g.__ ._.g___l 01/84 12/01/82 - 11/30/83 1 1 1 1 1 1 2 2 N 1

_____g___________________.g.__g ___g....l__.g....:....g____g__.g.._g___g l PLANT NAME: MILLSTONE 3 REGION: 1 RPT ASSMT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN QA LIC

.....g....................:...l....:....:...l.... ... g....l...gn==g ..

04/01 03/01/80 - 02/28/81 2 2 2 2 N 2 N N 3 N

_____: ___________________l___g.___g____l___l....g..__g....i___ ...

.__l 10/81 07/01/80 - 06/30/81 1 1 1 1 N 1 1 3 2 N 4

_____l.. ________________.g___g___. _.__g_._l__._g____l____g __g. _l.__

10/82 09/01/01 - 08/31/82 1 1 1 2 1 1 1 N 2 1 j .___.g.... ___________.__.g...g ___l____3 .. ____ .. _l.... ... -__ ..g 11/83 09/01/82 - 08/31/83 N 1 1 2 1 1 N N 1 2

.....g_________.__________g_. g.... .___g.__l__._g ___g.... ...g. _l...

10/84 09/01/83 - 08/31/94 N 1 2 1 1 1 1 1 N 2

_____g___...__..______..__l...l....g....g.._g___.g. __:..__l.._:...g___l l

4 I

J F

NUREG-1214 3-2 i

, . . , - - ---,-----,---m - - - --------w.--e - ,e tm,wnx-- g- -a e, ~c-e- ~ -~

- .- _ _.m . _

a t

e SALP HISTORY (REACTORS UNDER CONSTRUCTION) i i

1 PLANT NAME: NINE MILE PT 2 l REGION: 1 RPT ASSMT. PERIOD SF C0'NT PIPE SRC AUX ELEC INST DSN QA -LIC

, .....:....................:...: === ==== ...:====;....:.... ...:...:...:

04/81 02/01/80 - 01/31/81 2 2 2 '2 2 2 2 N 2 N

.....:___..........______.:-__g __.g__..;___; ___:____g____: __:___:__.

12/83 10/01/82 - 09/30/83 1 2 3 2 N 2 2 N- 3 2

.....;-___._ _____________g..
.___3.___:__.g.___1. __:____:__.;___:.._

, 03/05 10/01/83 - 01/31/85 N 2 2 1 1 3 2 3 2 2

..__.g..._________________
-__ .__g .. __.;___. ____ ___.g.__g . g_..:

05/86 02/01/85 - 01/31/86 N 1 N N N N N N 2 2 j __...:..______..._________g__.:___.:.___g.__;..__:____g.___g.__:__.:___:

4 PLANT NAME: SEABR00A 1/2 REGION: 1 RPT ASSMT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN QA LIC

.....:....................:...:....:....g...:....:....:....:...:...:...:

02/81 01/01/80 - 12/31/80 2 3 1 2 2 2 2 N 1 N i

...__;...____..__._______.g.__g.__.g. __: __:-___;___.g.___g___ ___:.._g 09/81 07/01/80 - 06/30/81 1 2 2 2 N 2 N 3 2 N

.___.:___..________..... _g_..:____ ____ ...: ___ ____:.___g___ ...;-__g i 09/82 08/01/81 - 07/31/82 1 2 3 2 1 2 1 N N 2

...__ ...___..____ __..... ___ ____l_.__g...:..._ ____g ___ ___: ._g___

l 08/83 07/01/82 - 06/30/83 1 1 3 2 1 2 1 N 2 2

.....:.________. ___. ..__g__.:.___;____:._.:____g__..;____ ___g___g_..:

j 02/05 07/01/83 - 12/31/84 N 1 2 2 1 3 2 N 1 2

.... ________..__....____ .__
..__;____:.__ .___g..._:.___:___;_..;__.

! v6/06 01/01/85 - 03/31/86 N N N N N N N N 1 1 l .....g___..___.....__..___:...:..__ _.__: ..g....:____:..__g___ ___:_..g 1

1 l

l l

l l

l i

i j

i l

1 NUREG-1214 3-3 i

i

-r w, , - -, , -wr---m- -mm---,----~r- wr--<, --r w v-- e., ,--ne--, -enw--~~~----- -,-,-----~~~wev--~~e---w,,= ve.-- *+~ - - - - - - - -

SALP HISTORY (REACTORS UNDER CONSTRUCTION)

PLANT NAME: SUSQUEHANNA 1/2 REGION: 1 t

RPT ASSMT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN QA LIC l =====:====================:===:====:====:===:====:====:====:===:===:===

804/81 01/01/80 - 12/31/80 1 N 2 2 N 3 3 N 3 N

_____ ..______________... . _ -___:... :...:....;___. ____g___ -__

.__l 310/92 03/01/01 - 02/28/82 N N N N N 2 2 N 2 2

.....g__________......____ ___!___.g____ _. -___:____ .___: __:.._ .__;

08/83 02/01/82 - 01/31/83 N N 2 1 N 2 N N N N

_____ ___.._______________:___:..__g____!___ ____ .___g____ _.. ___:...

i 04/84 02/01/83 - 01/31/84 N 1 1 1 N 1 1 N N 1

  • Operations ratings were also assigned for reports 4/81 and 4/84.

d Ratings in reports 10/82. 8/83, and 4/84 are for Unit 2 ontv.

l 4

l 4

4 l

NUREG-1214 3-4

SALP HISTORY (REACTORS UNDER CONSTRUCTION)

PLANT NAME: BELLEFONTE 1/2 REGION: 2 APT ASSMT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN QA LIC

=====:====================:===:====:====:===:====:====:==== ===:===:===:

10/80 04/01/79 - 08/31/80 2 2 2 2 2 2 2 N 2 N

_____;____________________:___:____ ____:___ ____:____g____ ___ ___ ___:

12/02 07/01/81 - 12/31/82 N 2 3 2 N 2 2 N 2 2

_____j.___________________:___:____:____:___ ____ -___:____ .__ ___;___:

06/84 01/01/83 - 02/29/04 N 2 2 2 2 2 1 N 2 N 09/85 03/01/84 - 05/31/85 N 2 1 N 2 2 2 N 2 N

_____:____________________l___:____ ____

___l____:____:____:-__ ___ ___:

PLANT NAME: CATAWBA 2 REGION: 2 RPT ASSMT. PER10D SF CONT PIPE SRC AUX ELEC INST DSN DA LiC

==:==================== ===:====:====:=== ====:====:====:===:===:

03/81 09/01/78 - 02/28/81 2 2 2 2 N 2 2 N 3 N

_____: ___________________ ___ __... ____:___g____ ____:____ ___ .__ ___:

12/82 09/01/80 - 05/30/82 N 1 2 2 N 2 N N N 2

_____g.___________________ ...:____ ____:___l____ ____:____:___ ___ ___;

10/03 06/01/82 - 04/30/83 N 2 1 N N 2 2 N 1 2

_____l____________________:-__:____:____g___:____: ___:____ ___l___ -__:

07/84 05/01/03 - 02/29/84 N 2 2 N 2 2 2 N 1 2

...__!____________________;___l____ ____ ___ ____;____;____: __ ___ ___

12/85 03/01/84 - 09/30/85 N 1 1 2 2 2 2 N 2 2 e

7 4

NUREG-1214 3-5

SALP HISTORY (REACTORS UNDER CONSTRUCTION)

PLANT NAME: GRAND GULF 2 REGION: 2 RPT ASSMT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN DA LIC

=====:====================:===:====:====:===:====:====:====:===:===:===l 01/81 09/01/79 - 09/30/80 2 2 2 2 2 2 2 N 2 N

_____;____________________:___;____: ___:___g____:____:-___:___:-__;___;

11/82 07/01/80 - 06/30/81 N N 2 2 N 1 1 2 .2 N 04/03 07/01/01 - 08/30/82 N N 2 N 2 2 2 N 2 2

_____3.___________________ ___: ___l____:___:____:____ ____:-__:___:___l 01/84 09/01/82 - 09/30/83 N N N N N N N N N N PLANT NAME: MCGUIRE 2 REGION: 2 RPT ASSMT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN QA LIC

=====:====================:===:====:==== ===:====:====:====:===:=e=:===l 10/80 05/01/79 - 04/30/80 2 2 2 2 2 2 2 N 2 N 12/02 09/01/80 - 05/30/82 N N 1 N 2 1 1 N N 2

_____: ___________________;___ ___ t....;___:. __:____;____:___:___:-__:

PLANT NAME: SEQUOYAH 2 REGION: 2 RPT ASSMT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN QA LIC

=====:====================:===:====:====:===:====:====:====:===:===:=,=: ,

01/01 08/01/79 - 03/29/80 2 2 2 2 2 2 2 2 2 N

_____:____________________;___:____g____;___ ____:____:.___:___ __;___

11/82 07/01/80 - 06/30/81 N 2 2 2 2 2 N N 2 N


t--- ----:----l---!----l----:----:---l---l---!

4 NUREG-1214 3-6

1 SALP HISTORY (REACTORS UNDER CONSTRUCTION)

PLANT NAME: SHEARON HARRIS 1 REGION: 2 RPT ASSMT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN QA LIC

=

====================:===:====:====:===:====:====:====:===:===:===l 10/80 04/01/79 - 08/31/60 2 2 2 2 N 2 2 N N N 05/82 07/01/80 - 12/31/81 2 2 2 2 2 2 N 2 2 N

.....:. __________________ ___ ..__ ____ .__:. __:--.  :..__;___:___l___:

05/03 01/01/82 - 01/31/83 N 1 2 2 1 2 N N 2 3 08/04 02/01/83 - 04/30/84 1 1 2 2 1 2 N N 2 2 01/86 05/01/04 - 10/31/85 1 1 1 2 2 3 2 N 2 2

_____ ___________________ ___ ___:-_ .:.__:____:____:.__ :.__ ___;___l PLANT NAME: ST. LUCIE 2 REGION: 2 RPT ASSMT. PERIOD SF CONT PIPE SkC AUX ELEC INST DSN QA LIC

=====:====================:===:====:====:===:====:====;....:===:===:===:

01/81 09/01/79 - 08/31/80 N 2 2 2 2 2 2 2 2 N 01/03 09/01/80 - 06/30/82 N N 2 2 2 2 2 N N 2 PLANT NAME: SUMMER REGION: 2 RPT ASSMT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN QA LIC

=====:====================:===:====:====:===:====:====:====:===:===:===:

'01/81 09/01/79 - 08/31/80 2 2 2 2 2 2 2 N 2 N

... .:. __________________;___ ___.:____; __; ___:____;____ -__ __l___:

11/82 09/01/80 - 03/31/82 N N 2 N 1 1 1 N 1 N

_____:--__________________:___ ___.;____:___ ____;____l____:.__:...:__  :

  • Doerations ratings also assigned for reports 1/81 and 11/82.

m ___ ___ _ _ _ _ _ _ - _ _ _ _ .

l SALP HISTORY (REACTORS UNDER CONSTRUCTION)

PLANT NAME: V0GTLE 1/2 REGION: 2 RPT ASSMT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN 04 LIC

=====:====================:===:====:====:===:====:====:==== ===:===:===:

N N 09/81 07/01/80 - 06/30/81 N 2 2 2 N N N N

____ :.____________ __..__l___:____:.. _:_ .g....;____;____l__.t__

2 10/82 07/01/81 - 10/31/82 2 1 2 2 N N N N 1

_____;__.... ___..........:___;____;....:... .__:..__:-___l_..: __ __ ;

2 05/84 11/01/82 - 10/31/83 2 2 2 1 N 2 N N 1

____ :.__ .___.........___;__.t..._; __

___:_...:..._3_... ___:___:-__;

11/85 11/01/83 - 06/30/05 1 2 2 1 2 2 N N l' 2 PLANT NAME: WATTS BAR 1/2 REGION: 2 RPT ASSMT. PERIOD SF CONT PIPE SRC aux ELEC INST DSN QA LIC

====s:=========== ........ ...:....:....:...:....:....:....:..=:. =:===:

09/80 04/01/79 - 08/31/80 N N N N N N N N N N

_....:._____________ .___. _.. __..;__.. _..g____ .__. ____g__.g___:-__l 10/81 07/01/80 - 06/30/81 N 2 3 3 2 2 2 2 N N

_____ _____________......g___g___.g__..:.._3....:.___:__.. ___:__.;___

3 2 04/83 07/01/01 - 12/31/82 N N 2 2 2 2 2 N

_. __:._ ..._...__________:__. ___ :____ _..;_.._i.__.g_...i.__

'06/84 01/01/03 - 02/29/84 1 2 2 N N 2 N N 2 2

.___.;____________________ .__:__ _;..__:.. g.___3....g..__:__.;___ .__

406/84 01/01/83 - 02/29/84 1 2 2 N N 2 N N 2 3

_____;._______________.___:...:___.:....:___ ____ ___g.__ g___ ___;...:

3 03/85 03/01/84 - 12/31/84 N N N N N N N N 2

.... :..._.._________.__.. ___:....:..__;_..g___.l..__;..__;__.;___ ___:

311/85 01/01/85 - 05/31/85 N N 2 N N 2 N N 2 3

..___:....__________.___.g__.g....g_...:.__.....__._____..:..;..:

  • Ratings are for Unit 1 only for reports 6/84 and 3/05.

- Ratings are for Unit 2 only.

5 Rpt. per. for Unit 1. Report period for Unit 2 was 03/01/84-05/31/85.

NUREG-1214 3-8

SALP HISTORY (REACTORS UNDER CONSTRUCTION)

PLdNT NAME: BRAIDWOOD 1/2 REGION: 3 RPT ASSMT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN DA' LIC

===<=:====================:===:====:====:===:=s==: ====:====:===:===:===:

06/80 07 01/79 - 06/30/80 N N N N N N N N N N

, ___l____ _... ___;____;.___l____l___;___l___

04/02 07/01/80 - 12/31/01 N 2 2 2 2 2 2 N N 2 05/S3 01/01/82 - 12/31/82 N 2 2 3 2 2 N N 3 1

..._g..._________________;.._;____:__._:.__:___:____:-__.;-__...;_.:

11/04 01/01/83 - 06/30/04 N 2 3 3 2 2 2 N 3 2

. ___:____________________ __ ;____:___ :...:____ ____l____;___;___;___:

v2iB6 07/01/84 - 11/30/85 N 2 2 2 2 2 2 N 2 2 PLANT NAME: BYRON 1/2 REGIJN: 3 RPT ASSMT PERIOD SF CONT PIPE SRC AUX ELEC INST DSN QA LIC

==:====================:===:====:====:===:====:====:====:===:===:

02/02 07/01/80 - 12/31/81 N 1 2 2 N 3 2 N 2 2 06/83 01/01/82 - 12/31/82 N 2 2 3 3 3 N N 3 1

..._.:.______ _____......_:___:__..:.___:__.:-___:__ _:....:.__l___l___:

'07/84 01/01/03 - 04/30/84 N 2 2 2 2 2 2 N 2 2

.. __ .....____..__ ____.:___;____:_ _:___;____ ____l____:___ ___;___:

01/86 05/01/84 - 10/31/85 N 2 2 2 N 2 2 N 2 2 Operations ratings were also assigned for reports 7/84 and 1/86.

NUREG-1214 3-9

t -

SALP HISTORY (REACTORS UNDER CONSTRUCTION)

PLANT NAME: CALLAWAY 1 REGION: 3 RPT ASSMT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN DA LIC

=====:====================:===:====:====:=== ====:====:====:===:===:===l 07/82 07/01/80 - 09/30/81 2 ~2 2 2 N 3 N N N 1

____________________!_. ;____l____:___ ____;____: ___:___l___;___

06/03 10/01/81 - 09/30/02 N 2 2 1 N 2 2 N 1 1

_____ ._______________ ...:.__;____ ____:-__:____:..._:.___ ___ .__l___:

804/84 10/01/82 - 11/30/83 N 1 2 1 1 2 1 N 2 1

...._;_____________.. ____l_ .:____ ____ ___l____ ____ ____:___; __l___

  • Operations ratings were also assigned.

PLANT NAME: CLINTON 1 REGION: 3 RPT ASSMT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN DA LIC

=====:====================:===:====:====:===:====:====:====:===:===:===:

10/80 07/01/79 - 06/30/80 N N N N N N N N N N

_____:____________________ ___ -___ ____ ___:. __l____ ____:-__:...:...:

04/82 07/01/80 - 09/30/81 2 2 3 2 2 N 2 N 3 2

_____ ____________________:-__: ___ ____l___ ____ .___ ___ ___;___l___:

01/83 10/01/81 - 09/30/82 2 2 2 2 N N 2 N 3 2

_____:____________________:___l____ ____:___:____ ____:____;___:___: __;

07/84 10/01/82 - 02/29/84 N 2 2 2 2 2 2 N 2 2 11/95 03/01/84 - 08/31/85 2 1 1 2 2 2 2 N 2 1 I

NUREG-1214 3-10

1 SALP HISTORY (REACTORS 'UNDER CONSTRUCTION)

PLANT NAME: FERMI 1 REGION: 3 RPT ASSMT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN OA LIC

=====:====================:===:====:====:===:====:====:====:===:===:===:

12/84 10/01/83 - 09/30/84 N N 2 N N 3 3 N 2 2 PLANT NAME: FERMI 2 REGION: 3 RPT A55MT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN DA LIC

=====:====================:===:====:====:===:====:====:====:===:===:===:

0//83 10/01/81 - 09/30/82 N 2 2 2 2 3 N N 2 1

.. __;___.._______________:__ :____ -_..:.__:.. _:_ _:____: __:-_.t.__:

02/04 10/01/82 - 09/30/83 N 2 2 2 N N N N 3 2 12/04 10/01/83 - 09/30/84 N N 2 N N 3 3 N 2 2

'09/85 10/01/84 - 06/30/85 N N 2 N N 2 2 N 2 2 Operations ratings were also assigned.

PLANT NAME: LASALLE 1/2 REGION: 3 RPT ASSMT. PERIOD 5F CONT PIPE SRC AUX ELEC INST DSN QA LIC

=====:====================:===:====:====:===:====:====:====:===:===:===:

10/80 07/01/79 - 06/30/80 2 2 2 2 2 2 2 N 2 N

'11/82 07/01/80 - 12/31/01 N 2 2 2 N 2 2 2 2 2 07/83 01/01/82 - 12/31/82 N N 2 N N N N N N 2 208/84 01/01/83 - 04/30/84 N 2 2 N N 2 N N 2 2 Operations ratinos also assigned for reports 11/82 and 7/83 (Unit 1).

Ratings are for Unit 2 oniv.

NUREG-1214 3-11

SALP HISTORY (REACTORS UNDER CONSTRUCTION)

PLANT NAME: PERRf 1/2 REGION: 3 RPT ASSMT. PERIOD SF CONT PIFE SRC AUX ELEC INST DSN DA LIC

=====:====================:===:====:====:===:====:====:====:===:===:===:

07/80 07/01/79 - 06/30/80 N N N N N N N N N N

___ . _ ..__________..___.:..-:____ ____:___:_-__ ____:____ __.: ..:___l 03/82 07/01/80 - 09/30/81 N 2 2 2 2 3 2 1 N 1 01/83 10/01/81 - 09/30/82 N 1 2 2 2 N N 2 N 1 03/84 10/01/82 - 12/30/83 N 1 2 2 2 2 2 N 2~ 2 09/85 01/01/84 - 06/30/85 N 1 2 1 2 2 1 N 2 2

  • 06/86 07/01/85 - 04/30/86 N N 2 N N 1 N N 2 1

_____l______________ ..__ ___ ..__;.... __.:.___ ___ ____:_..: ..;___:

Ratings for unit 1 oniv. Operational ratings also assignea.

NU,iEG-1214 3-12

SALP HISTORY (REACTORS UNDER CONSTRUCTION)

PLANT NAME: COMANCHE PEAK 1/2 REGION: 4 RPT ASSMT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN DA LIC

=====:======== ===========:s==:====:====:===:====:====:====:===:===:===:

10/80 08/01/79 - 07/31/80 N N N N N N N N N N 09/82 10/01/E1 - 09/30/82 N 2 2 1 N 1 1 N N 1

____ -_____.._____. .... ;___;-___:... :___ ____:____:____;___: __l___;

06/84 10/01/82 - 10/31/83 N 2 2 2 3 2 1 2 2 2

-___ :..______________ ..:... ____ ____ -__:--__;__ .: ___l___:___:...:

PLANT NAME: RIVER BEND REGION: 4 RPT ASSMT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN DA LIC

=====:====================:===:====:====:===:====:====:====:===:===:===:

09/80 09/01/79 - 08/31/80 N N N N N N N N N N

____.:.______________...._i___:____;-___:___: _ .:____l_...:.__l___l___

10/81 07/01/80 - 06/30/81 1 2 2 N N 2 N N N 1

_____;____________________ ___:....;____: ..:____l___ :..__:___:-__l___l 10/82 09/01/81 - 08/31/82 N 2 2 2 N 2 N 2 N 2 09/83 09/01/82 - 07/31/83 N 2 2 2 2 2 2 1 2 2

'02/05 08/01/83 - 12/31/84 N 1 2 2 2 2 2 2 2 2

  • Ooerations ratings were also assigned.

NUREG-1214 3-13

SALP HISTORY (REACTORS UNDER CONSTRUCTION)

PLANT NAME: S. TEXAS.PROJ. 1/2 REGION: 4 RPT ASSMT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN QA LIC

=====:====================(===g====:====:===:====:==== ====:===g===:===:

06/02 07/01/80 - 06/30/81 N 2 N N 2 N N N 3 1

_____l______..____________g__.g____ .___:___ ... :____g____g___:.._g_.  :

06/84 12/01/82 - 11/30/03 3 2 1 2 N 1 N 2 2 1

_____g__________________..g___l_...g___.:___;-___;.___g____ ___:___t__.:

09/85 12/01/03 - 06/30/85 2 2 2 2 2 2 2 1 2 2 ,

.____g____________________ ___:.___ ____;___: .__ ___.:.___ ___g_._:-__:

PLANT NAME: WATERFORD 3 REGION: 4' RPT ASSMT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN DA LIC

==:==================== ===:====g====;===:====:====:====:===:===:

11/80 08/01/79 - 07/31/80 1 1 2 2 N 2 2 N 2 N

_.__.g____________________g___l____ .___;___g____:____:____:___;___ __.

07/82 07/01/80 - 06/30/81 N 1 2 2 N 2 2 N N 3

____. ____________________ ___ ____ .___ ___:..__ ____;..__:___:___l_..:-

12/82 07/01/01 - 06/30/82 N 2 3 3 N -2 3 N N 2

____.g____________________:___:____;____:.__g____:____;____:___:___g___

01/84 07/01/82~- 06/30/83 N N N N N N N 2 2 2

__...:..___________.______l___:____g____g___g____;____ ____ ___: __:-__;

PLANT NAME: WOLF CREEK REGION: 4 RPT ASSMT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN QA LIC

=====:==================== ===g====:====:===:====:====:====:===:===:===:

11/80 08/01/79 - 07/31/80 1 1 2 2 N 2 2 W N N

_____g________......______ ___ ..__:____:___;____ .__.g____g.__ ___g_..:

06/82 07/01/80 - 06/30/81 N 1 2 2 2 2 N N N 1

_____l___________. _______;___;____g____ ___:____;__._;___.;___!__.:___;

11/82 08/01/81 - 07/31/E2 N 1 3 2 2 2 2 li 1 1

____.g..._________________ ___;____;____ ___g____l____;-_.. ___g___:.__;

12/83 08/01/82 - 07/31/83 N N 3 3 2 1 N N 2 2


:---l--------l---l----l--------l---l------l 502/85 08/01/83 - 09/30/84 N N 2' 2 1 2 1 N 2 1

.__._:_______.____________g__.g____ ____:___:-__.:____: ___:___: __ ___

  • Operations ratings were also assigned.

l l

NUREG-1214 3-14 l

l

SALP HISTORY (REACTORS UNDER CONSTRUCTION)

PLANT NAME: DIABLO CANiON 1/2 RE010N: 5 RPT ASSMT. PERIOD SF CONT P1PE SRC AUX ELEC INST DSN OA LIC

==:====================:===:====:====:===:====:====:====:===:===:

'03/83 07/01/81 - 12/31/82 N 1 2 1 1 2 2 2 2 N Operations ratings were also assigned.

PLANT NAME: PALO VERDE 2/3 REGION: 5 RPT A55MT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN QA LIC

=====:====================:===;====:====:===:====:====:====:===:===:===:

05/80 05/01/79 - 05/30/80 N N N N N N N N N N


:--...---.. ---....--:---:- --:----:---:----:_-..:----:-- :---l-..:

09/81 Oo/01/80 - 06/30/81 N N N N N N N N N N

' v6 / 8 3 0 7 / 01/ 81 - 02/28/83 1 1 2 1 2 2 2 N N 1 06/84 03/01/83 - 03/31/84 1 2 2 2 3 2 1 N N 2 12/05 04/01/84 - 09/30/65 N 2 2 2 2 2 1 N N 2 Operations ratings also assigned for reports 6/83, 6/84 and 12/85.

PLANT NkME: SAN ONOFRE 2/3 REGION: 5 RPT ASSMI. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN QA LIC

=====:====================:===:====:====:===:====:====:====:===:===:===:

09/80 06/01/79 - 06/30/80 1 1 3 2 2 2 2 N 2 N

'09/81 06/01/80 - 06/30/81 N N 2 N 2 2 1 2 1 N

--...;--...-----..........:---:----l-...:--_:-...:----:--..: --l- .:---:

12/02 07/01/81 - 06/30/82 N 1 2. I 1 2 2 2 2 N

_-------..._--:---:----;_--.:---:----:----:..--:---l---:--.

' Goerations ratings were also assigned for reports 9/81 and 12/02.

NUREG-1214 3-15

SALP HISTORY (REACTORS UNDER CONSTRUCTION)

PLANT NAME: WNP2 REGION: 5 RPT ASSMT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN DA LIC

=====:===========s========:===:====:====:===:====:====: ====:===:===:===:

11/81 05/01/80 - 06/30/81 N 2 3 2 2 2 2 3 2 N

_____:..__________________:__.:_ ._;____:___:___.: ...: ___ ___l___:___l 12/82 07/01/81 - 07/31/82 2 2 2 2 2 3 2 2 2 1

_____l____________________ ___:____ __ .:._.;____:..._:____ ___ ___ .._

12/83 08/01/02 - 07/31/83 N 2 2 N N 2' 2 N 2 2

_____:____________________l___:.___ ___ :.__ ._..:.___:____:___:__ ___:

l l

NUREG-1214 3-16

u s. Nucu AR RioutATORv w . swm aE*Oa f ~u .E a ~~<

  • r >oC. v., N < .*>

,,Re,ORo m 12 84p Ec," ',s'- BIBUOGRAPHIC DATA SHEET WRMM

$EE INSTRUCTIONS ON THE REVERSE 3 LE AVE BLANK 2 TITLE AND 5v87sTLE Hi.itorical Data Sumary of the Systematic Assessment of Licensee Performance A OATE at oat cO tETED MONYM YEAR i Auf aORIS. September 1986 6 CATE REPORT ISSUED

" ~'" "

Michael R. Johnson October I 1986 7 PER50RMING ORGANi2 AYiON NAvf AND MafLING ADDRES5 flasc4pela Camp 8 PROJECTIT A5K/ WORK UNsf NUMBER Division of Inspection Programs , ,,4 0R cRA,,T,,Uo.ER Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D. C. 20555 to 5PON50ptNG ORGANi2 ATION NewE AND MAILING ADDRESS ffac,vdele Capet 11a TYPE OF REPORT Division of Inspection Programs Office of Inspection and Enforcement

  • "a'*"*'a'o"~~~**'

U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Jul 1, 1986-Sept 30, 1986 12 SUPPLEMENT AR v NOTES None This report presents a history of Systematic Assessment of Licensee Performance (SALP) ratings for nuclear power plant facilities in operation and under construction.

The SALP results are listed by NRC region in three sections: the most recent report, operating facilities, and facilities under construction.

The historical data summary report has been prepared by the NRC Office of Inspection andEnforcement(IE). Information contained in this report has been updated to include those published SALP reports received before September 16, 1986.

14 DOCuvENT AN ALytis - e KE vwORDS/OESCR,pTORs 16 Ava LAsitiT v Systematic Assessment of Licensee Performnce (SALP) s'^"~

U.S. Nuclear Power Plants ..

Unlimited Licensees Performance History Construction Facilities e stcuRiTvcLAssi icATiO~

< ra-

. Oper n

. DINT,.ati,0,g .' Facilities

, irs " " * '

Unclassified ITwo repert)

Unclassified o ,,u .E m O. , Ac,E s

$ 6 *R+CE

- Qf qs. gM K Q.

UNITED STATES a

~

NUCLEAR REGULATORY COMMISSION

$*ECIAL FOURTH-CLASS RATE Postace re nts raio S

~

. ,'4'? .y . -

~

WASHINGTON, D.C. 20555 wfs2"EC. .2 L.. .

PERMIT No. re-67 5.,

{., .. i')' .(-

] . -

  • . } ) '-- ."

L OFFICIAL SUSINESS - i'

~

PENALTY FOR PRIVATE USE,8300 A a. av. .e .. '

a- j S .. ,

s<._,,,,,~~~,.y
  • Y l-&L; o.;
g
r. j ]4 d. .- y

,,;;g';4*',7-9 y '.

er 2 . r, .

.t.',

v'~ s' _.-

f.

. ?.g.'s 'k'j -'_'.4. :,_ f*

, .- .-S

' 's. , {. ,,. .

..'$ .,e s.

-} 't * ' { 3$

{.',.),-[9'

~

7' .),[ t, *

~ .on. < .x, :, -

p . . g c. '.'i4

' ,F't :N s ,y '-

.'3 f,4- 'j e p.y Ii ? '

_ s,

. 3.

.f '

.% g. '

diij n...- . ' E'4 .

. ,% .' c.:

p . .x..,

. - . . , - 3

_r'*l.'.'.; ,

. . . . ' . - ,.I T E. ;. S g- .p . . > , ..

..' : _.['; . '- :j '

}-s,. ' . _ ; > G w ;y-y .g ,

- ' " . ,j -

g 4, .- d.% .

- ,.,*. ., & f' , ;

, .', p 3

< 'i . .i, . ?. * ,

[ ' k_.

.i+

4' ."c-,,. 3 .

i m 9, t

y'?; ;V'k y . :N ' .

F f -*. .

J;% . 0-E LK'4lid c ^"j.., :? . i b .$. $ NA' s$.-

- 9

. ' , 4.j

  • ,,.' .-a s .:

',' . ' . .., .f' . ,

b .

n.s .'.';

?.

0

~ , 8 .

r_ . - (

r L s - .. .

V %g _

W * '. Q

"^

.g._

s, y

..p ..

' , : _h*