ML20211B654
| ML20211B654 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 10/14/1986 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | Ballard R, Milhoan J, Rossi C Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8610170314 | |
| Download: ML20211B654 (1) | |
Text
OCT 141986 Docket Nos. 50-456 DISTRIBUTION.
and 50-457 E ket: Filed NRC PDR PD#3 RDg.
MEMORANDUM FOR:
E. Rossi, Assistant Director S. Varga Division of PWR Licensing-A J. Stevens R. Ballard, Chief Engineering Branch, PWR-A J. Milhoan, Chief Plant Systems Branch, PWR-A C. Berlinger, Chief Reactor Systems Branch, PWR-A V. Benaroya, Chief Facility Operations Branch, PWR-A F. Rosa, Chief Electrical, Instrumentation and Control Systems Branch, PWR-A S. Treby, Deputy Assistant General Counsel Hearing Branch 1, 0GC FROM:
Steven A. Varga, Director PWR Project Directorate #3 Division of PWR Licensing-A
SUBJECT:
REVIEW 0F FINAL DRAFT OF BRAIDWOOD SSER 2 Enclosed is the final draft of Supplemental Safety Evaluation Renort No. 2 for Braidwood Station, Units 1 and 2 which is being transmitted for your review, comment, and approval.
Since the projected fuel load date is October 15, 1986, an expedited review by COB today is requested.
Please provide comments to the Braidwood Project Manager, Janice A. Stevens, extension 27702.
t
)
Steven A. Varga, Director Project Directorate #3 Division of PWR Licensing-A
Enclosure:
As stated cc: Thomas Novak 8610170314 861014 0500g6 W/o enclosure A
PD#3 JStev rfs a
10/14/
6 10 4/86
-.