%,t UNITED STATES NUCLEAR REGULATORY COMMISSION
- f
{
WASHINGTON. D. C. 20666 l
~
February 6, 1987 Docket No. 99900003/86-01 General Electric Company Nuclear Fuel and Components Manufacturing Facility ATTN: Mr. E. A. Lees Manager Pcst Office Box 780 Wilmington, North Carolina 28402 Gentlemen:
This refers to the inspection conducted by Messrs. R. L. Cilimberg, P. J. Prescott, D. J. Lynn, and B. J. Mincher, of this office on December 8-12, 1986, of your facility at Wilmington, North Carolina and to the discussions of our findings with Mr. W. W. McMahon and members of your staff at the conclusion of the inspection.
The purpose of this inspection was to review the fabrication and inspection activities related to fuel assemblies, and to review Ouality Assurance (QA) program implementation at your Wilmington facility. Areas examined during the inspection included a review of pellet and fuel rod manufacturing, fuel assembly operations, nondestructive testing, corrective action on previous inspection findings, and recent fuel problems reported at LaSalle Unit 2 on January 29, 1986. Areas examined during the inspection and our findings are discussed in the enclnsed report. Within these areas, the inspection consisted of an exam-ination of procedures and representative records, interviews with personnel, and observations by the inspector.
Based upon the results of this inspection, GE has implemented appropriate cor-rective actions which address previous NRC inspection findings.
As noted in the enclosed report, these findings, involving procedural adequacy and adherence to procedures, are considered closed based upon this inspection.
However, these areas may be reviewed during future NRC inspections.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Roon.
(0 0702190456 070206 PDR GA999 ENVGENE h
99900003 PDR
O General Electric Company Nuclear Fuel and Components Manufacturing Facility February 6, 1987 Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, original signed by:
Ellis W. Merschoff, Acting Chief Vendor Progran Branch Division of Quality Assurance, Vendor and Technical Training Center Programs Office of Inspection and Enforcement
Enclosures:
1.
Appendix A-Inspection Report No. 99900003/86-01 2.
Appendix B-Inspection Data Sheets (4 pages)
DISTRIBUTION:
22 ws:IE:05..
VPB Reading DQAVT Reading RStarostecki, IE JStohr, RII JHind, RIII RBernero, NRR BGrimes, IE HMiller, IE EMerschoff, IE JStone, IE LParker, IE JCraig, IE RCilimberg, IE PPrescott, IE DLynn, O'Donnell & Associates BMincher, EG&G Resident, LaSalle
)'h VPB:DQAVTg4 C/VPB:DQAVT AJr
.DQAVT RCilimberg.lt JCraig N.choff
//JJ/87
% /87 4/87