Georgis Power Company Fest Offico Box 2832
._ g Wayr4sbcro, Georgia 30830 o 12
. Telephone 404 554-9961, Extension 3413 aJ 404 724-8114. Extension 3413 i
h n 7 ((B 9 P12 : 52 Georgia Power P. D. Rice Vice President Vogtl,e Proiact Ine southern e:ectac system s
s
\\
February 5,1987 s
L UnitedfNates'NuclearRegulatoryCommission Region II, Suite 2900 File:
X7BG10 101 Marietta Street, Northwest Log:
GN-1344 Atlanta, Georgia 30323
Reference:
50-424/86-118 Attention:
Mr. Luis A. Reyes The Geobgia Power Company wishes to submit the following information concerning the violation identified in your inspection report 50-424/86-118:
Violat o'rt 50-424/86-118-01, " Failure to Adequately Document and Evaluate Diesel Generator Performance" - Severity Level IV Georgia Power Company acknowleges the violation as identified in the USNRC inspection report.
As indicated in the USNRC inspection report, Vogtle operating procedure
(
13145-1, " Diesel Generators," and surveillance procedure 14980-1, " Diesel Generator Operability Test," prescribe instructions to implement the js requirements of Regulatory Guide 1.108.
These requirements. include jl '-
documentation and evaluation of each diesel generator start attempt.
Personnel responsible for implementing procedures 13145-1 and 14980-1 failed to properly complete the form used for recording diesel generator start attempts and to properly route the form to the Engineering Support Superintendent.
To ensure full compliance with Regulatory Guide 1.108, operations and engineering personnel conducted a review of the Shift Supervisor and Plant Operator logs to identify the diesel generator starts attempted since completion of reliability testing.
Engineering evaluated all identified start attempts and entered required information in the diesel start log.
1 5
h k'
% 2 $ $ [ [5 0 4
o 1
rEo/
- A e'Q c --
3 3 fo
.m f
c Mr. Luis A. Reyes-di
Reference:
50-424/86-118 File: X7CG10 Log:
GN-1344
.5
-Page two-y.-
r
]
The following actions have been/will be taken to' prevent re' cur 4nce:
4: ' ' -
1.
During De'cember 1986, operations personnel _ received general trairiing *
~
which emphasized the importance of individual awareness of procedure requirements and effective' implementation of plant procedures.
b 2.
Personnel responsible for. implementation of diesel generator 3
3 operatforp and surveillance procedures received additional special
=
instructions, relative to the documentation and evaluation of diesel
\\
i i
generator start attempts.
n 13145-1 and 14980-1 were reviewed.and evaluated
'3.
Plant. procedures 3
on January 28, 1987, by appropriate supervisory personnel to ensure
{
adequacy and clarity.
Although both procedures were determined.
'to be adequate, procedure ~13145-1 will be amended to provide clearer
(
=
instructions and evaluation criteria.
I Revisions to procedure '13145-1 are expected to be completed by February 28,-1987.
All other corrective actions relative to the h;)
violation have been completed.
g This response contains. no proprietary information and ma.) be placed in the USNRC Public Document Room.
i y
Yours truly, P. D. Rice j
<3-CWH/PDR/wkl xc:
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C.
20555 H. G. Baker D. R. Altman L. T. Gucwa J. P. O'Reilly J. A. Bailey C. W. Hayes G. F. Head G. Bockhold, Jr.
G. A. McCarley R. E. Conway J. F. D'Amico R. W. McManus R. H. Pinson W. D. Drinkard Sr. Resident (NRC),
B. H. Guthrie C. C. Garrett (OPC)
J. E. Joiner-(TSLA)
R. A. Thomas D. Feig (GANE)
NORMS
)
s
..