7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION TOLEDO EDISON COMPANY AND THE CLEVELAND ELECTRIC ILLUMINATING COMPANY DAVIS-PESSE NUCLEAR POWER STATION, UNIT N0. 1 DOCKET NO. 50-346 NOTICE OF DENIAL OF AMENDMENT TO FACILITY OPERATING LICENSE AND OPPORTUNITY FOR HEARING The U.S. Nuclear Regulatory Commission (the Commission) has denied in part a request by the Toledo Edison Company for an amendment to Facility Operating License No. NPF-3, issued to Toledo Edison Company and The Cleveland Electric Illuminating Company (the licensees), for operation of the Davis-Besse Nuclear Power Station, Unit No.1, located in Ottawa County, Ohio.
Notice of consideration of issuance of this amendment was published in the FEDERAL REGISTER on December 4, 1985 (50 FR 49793).
The proposed amendment, in part, would require verification that diesel generators can be synchronized (but not actually electrically connected) to offsite power during surveillance testing rather than the verification of diesel generator synchronization to offsite power and loadino to at least 1000 kw and operation for at least 60 minutes. Toledo Edison Company did not present a substantial technical argument for this revision which does not meet the objective of the original testing to demonstrate the capability 2
of the diesel to assume its designed load. Therefore, the Commission has determined that this TS revision should not be granted.
8702190390 870210 PDR ADOCK 05000346 P
7590-01
~
All other provisions of the amendment request have been approved by Amendment No. 97 dated February 10, 1987. Notice of Issuance of Amendment No.
97 will be published in the. Commission's biweekly FEDERAL REGISTER notice.
Toledo Edison Company was notified of the Commission's denial of the I
proposed TS change by letter dated February 10, 1987.
By
, the licensees may demand a hearing with respect to the denial described above and any person whose interest may be affected by this proceeding may file a written petition for leave to intervene.
A request for hearing or petition for leave to intervene must be filed.
with the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, Attention: Docketing and Service Branch, or may be delivered to the Commission's Public Document Room, 1717 H Street, N.W.,
Washington, D.C., by the above date.
A copy of any petitions should also be sent to the Office of the General Counsel /Bethesda, U.S. Nuclear Pegulatory Commission, Washington, D.C. 20555, and to Gerald Charnoff, Esq., Shaw, Pittman, Potts and Trowbridge, 2300 N Street, N.W., Washington, D.C. 20037, attorney for the licensees.
For further details with respect to this action, see (1) the application for amendment dated May 28,1985,(2) the Commission's letter to Toledo Edison Company dated February 10, 1987, and (3) the Commission's Safety Evaluation issued with Amendment No. 97 to NPF-3 dated February 10, 1987, which are available for i
l l
l 7590-01 l
public inspection at the Commission's Public Document Room, 1717 H Street, N.W.,
Washington, D.C., and at the University of Toledo Library, Documents Department, 2801 Bancroft Avenue, Toledo, Ohio. A copy of items (?) and (3) may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, Attention:
Director, Division of PPP Licensing-B.
Dated at Bethesda, Maryland, this 10th day of February,1987.
FOR THE NUCLEAR REGULATORY COMPISSION
'ls(
)
J hn F. Stolz, Director WR pro,iect Directorate #6 i #sion of PWR Licensing-B
February 10, 1987 DOCKET NO.
50-346 Rules and Procedures Branch MEMORANDUM FOR:
Division of Rules and Records Office of Administration i
FROM:
Office of Nuclear Reactor Regulation Division of PWR Licensing-B
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION. UNIT NO.1 One signed original of the Federal Register Notice identified below is enclosed for your transmittal to the Office of the Federal Register for publication. Additional conformed copies (
5 ) of the Notice are enclosed for your use.
Notice of Receipt of Application for Construction Permit (s)and Operating License (s).
Notice of Receipt of Partial Application for Construction Permit (s)and Facility License (s): Time for Submission of Views on Antitrust Matters.
Notice of Consideration o? Issuance of Amendment to Facility Operating License.
Notice of Receipt of Application for Facility License (s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of issuance of Facility License (s)and Notice of Opportunity for Hearing.
Notice of Availability of NRC Draft / Final Environmental Statement.
Notice of Limited Work Authorization.
Notice of Availability of Safety Evaluation Report.
Notice of issuance of Construction Permit (s).
Notice of Issuance of Facility Operating License (s) or Amendment (s).
Order.
Exemption.
Notice of Granting Exemption.
Environmental Assessment.
Notice of Preparation of Environmental Assessment.
t e--Facil-ity-Operating-License-and-Opportunity Other:- --41st-ice-oNa t
fer h;; ring. Please-conteet-us-with-th: 3O d:y-fill-in-date-en-page 2 p:r:gr:ph 2.
Office of Nuclear Rcactor Regulation PWR Project Directorate 96 Division of PWR Licensing-B
Enclosure:
As stated
Contact:
Phone:
R. Ingram 25545 P LR#,6,,
cmcz>
?]lLQam...
>= ~ ~
Im>
. /.
/S2.
yIc rcLes si% etoisol NRChe o24o OFFICIAL RECORD COPY
- -