p.,
GPU Nuclear Corporation Ng g7 Post Office Box 480 Route 441 South Middletown, Penasylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:
(717) 948-8461 4410-86-L-0184 Document ID 0120P October 8, 1986 TMI-2 Cleanup Project Directorate Attn: Dr. W. D. Travers Director US Nuclear Regulatory Commission c/o Three Mile Island Nuclear Station Middletown, PA 17057
Dear Dr. Travers:
Three Mile Island Nuclear Station, Unit 2 (TMI-2)
Operating License No. DPR-73 Docket No. 50-320 1986 Program Master Schedule Update Attached for your information is the TMI-2 Program Master Schedule (PMS) dated October 1986 which supersedes the previous PMS.
The program end point remains unchanged; and, based on the results of the Core Stratification Sampling during July,1986, we have been able to schedule our defueling activities (both in-vessel and ex-vessel) to show completion by December, 1987. The projected completion for Waste Management activities and Processed Water Disposal are after the program end point.
Sincerely,
/
N tanderfer Vice President / Director, TMI-2 FRS/RDW/eml l
s6kk[170208861008 Attachment
~~
PDR ADOCK 05000320 9
p.
PnR
\\
t GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation l
l L
\\.
T M I-2 PROGRAM MASTER SCHEDULE DESCRIPTION 3rd QTR 4th OTR ist OTR 2nd GTR 3rd GTR 4th OTR Ist OTR 2nd GTR 3rd GTR 4th GTR let GTR 2nd GTR DEPuELING & CNAR ACT ERIZ ATION CNARACTE 2ATIO,N EX-VESSEL DEFUELING g
't I
I DESIGN)& PROCURE TOOLINS l
DEFUELING TOOLING
/
3
'l
'1 h
g I
I l
o l CODE RE GION, CSA 4 LOWERNEADDEPdELIy g
IN-VESSEL DEFUELING I
):NsP.) REPORi PuEL ACCOuMTAa:LNw s
DATA ACQUISITION i
tC j
O- -
k LOAO & sN P PuEL gN NOTE I l
FUEL SHIPPING C
.O g
8ENE EN S.
SEOla ENT REMOVAL COMPLETE DECON gVSTEMS DECON Oi lNL DECON AFHB 1C.T I
I g
EN S.
COATg &
g I
T C
Al 3
DECON -- RB i
O i NN l
1 l
l T)4
- l uNPP NORuAL & AeNORuAL WASTE uANAeEuEn sN PP:No sees DASTE MANAGEMENT t----t C I
I Af *"fgy,' M$,g",',0 NRC R &A -
PLAN OssPOsE PROCEssE WA ER 7/98 PROCESSED WATER C
O O
I I
ONFs PLA IATE LI N
9 Ts POST DEFUELING PLANT i
0; STATUS NOTE Is OEPENDS ON SNIPPING EXPERIENCE AND PINAL DETERMIN A TION OF MuMSER OF CANIETERs TO DE SNIPPEO.