Informs That USEC Is Preparing Security Plan Revs to Resolve Inconsistencies Among Three Security Plans & Other Minor Changes.Meeting Has Been Verbally Requested W/Nrc to Review All Security Plan Changes,Due to Scope of All Plan Changes
ML20211A959
Person / Time
Site: Paducah Gaseous Diffusion Plant
Issue date: 09/19/1997
From: John Miller
UNITED STATES ENRICHMENT CORP. (USEC)
To: Lieberman J
NRC OFFICE OF ENFORCEMENT (OE)
References
GDP-97-0167, GDP-97-167, NUDOCS 9709250029
Download: ML20211A959 (2)


Text

.

es,(, :

United Statis PD z Ennehm:ntCorcoration 2 Democracy Center 6903 Rockledge Dnve Bethesda, MD 20817 Tel: (301)S64 3200 Fax:(301)564 3201

- JAMES H. MRER.

Dir: (301) 544-3309 VICE PRESIDENT, PRODUCTION Fax: (301) 8718279 September 19,1997 Mr. James Lieberman -

SERIAL: GDP 97-0167-Director, Oflice of Enforcement United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 Paducah Gaseous Diffusion Plant (PGDP)

Docket No. 70-7001 Status of Revisions to the PGDP Security Plans

Dear Mr. Lieberman:

United States Enrichment Corporation (USEC) letters to the Nuclear Regulatory Commission (NRC) GDP 97-0125, dated July 18,1997 and GDP 97-0139, dated August 11,1997 provided a schedule for revising the PGDP classified matter, transportation security, and physical protection security plans.

The changes to these PGDP security plans that were determined by USEC not to require prior NRC approval were completed by September 5,1997 as committed to in the referenced letters. These changes were required to bring the plant into compliance and achieve completeness and accuracy.

USEC has identified no change to date as a result of our review that requires prior NRC approval.

This transmittal completes USEC's commitment described in the referenced letters to forward any plan revisions requiring NRC approval by September 19,1997.

USEC is preparing security plan revisions to resolve inconsistencies among the three security plans

~

and other minor changes. Until such time as these changes are completed, PGDP will remain in compliance with the most conservative of the commitments in the three plans. These inconsistent and other minor changes are being reviewed, and it appears to date that none of these changes will require

_ prior NRC approval. Due to the scope of all security plan changes made to date, USEC has verbally requested a' meeting with NRC to review all security plan changes.

f.

i U 9709250029 970919 l

llhll l

l PDR ADOCK 07007001 C

PDR Offices in Overmore. Cahfomia 1 Paducah, Kentucky Portsmouth, ohio Washington. DC

,4,.,-

Mr. James Lieberman September 19,1997 GDP 97-0167, Page 2 There are no new commitments made as a result of this letter. If you have any questions regarding this maner, please call Mr. Mark Lombard at (301) 564 3248 or Mr. Bill Sykes at (502) 441-6796.

Sincerely, es H. Milbr

' ice President, Production CC:

NRC Document Control Desk Acting Director, Division of Nuclear Materials Safety, NRC Rcgion III (R. Caniano)

NRC Oflice of Nuclear Material Safety aad Safeguards (N. Mamish)

NRC Special Projects Branch (R Pierson)

NRC Resident Inspector - PGDP

. - - - _ _