ML20211A785

From kanterella
Jump to navigation Jump to search
Provides Guidance on 10CFR20.103(b)(2) Re 40 MPC-hour Control Measure.Control Measure Not Limit Except for Recurrence of Exposure to Greater than 40 MPC-hours
ML20211A785
Person / Time
Issue date: 06/26/1980
From: Higginbotham L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8610170012
Download: ML20211A785 (1)


Text

r:

F 1

E)

,"4'h UNITED STATES

'; W( g /;: 5 NUCLEAR REGULATORY COMMISSION

%., N {/

s E

WASHING TON. O. C. 20555 c,

JUN 2 61980 NEMORANDUM FOR:

A. B. Davis, Chief, FFMS Branch, Region III FROM:

Leo B. Higginbotham, Assistant Director, Division of Fuel Facility and Materials Safety Inspection, IE

SUBJECT:

10 CFR 20.103Or)(2)

Reference:

I Memo, Fisher to (copy enclosed).Higginbotham, 12/11/79, AITS F03082979H08 recurrence of exposure to greater than 40 MPC-hoursIn

" citable" recurrence if the second instance occurs,.

You asksd if it is a different campus.sity in a different department in a different building, p

, even, on a The answer is yes, if the location and workers involved in the recur e governed by the same licensee system of management controls as th r nce are-rence.

I believe the reason is evident--the corrective actio instance should be. broad and comprehensive enough to correct th ur-fact happen.to the particular locale or segment of the e problem _through-ust ncident did in

\\

s

\\

\\.

1

$.NoTbotham o

Assistant rector Division of Fuel Facility and

~~

Materials Safety Inspection, IE cc:

G. H. Smith, R. I J. P. Stohr, R.II G. D. Brown, R.IV H. G. Book, R. V

,w'*'~

-- gg.7oo12 8o0626

'pg IbE pp -

_ Misc

..