ML20211A479
| ML20211A479 | |
| Person / Time | |
|---|---|
| Site: | 05200003 |
| Issue date: | 09/12/1997 |
| From: | Huffman W NRC (Affiliation Not Assigned) |
| To: | Quay T NRC (Affiliation Not Assigned) |
| References | |
| NUDOCS 9709240272 | |
| Download: ML20211A479 (4) | |
Text
r L
September 12, 1997 MEMORANDUM 10:
Theodore R. Quay, Director Standardization Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation FROM:
William C. Huffman, Project Manager original signed by:
Standardization Project Directorate Division of Reactor Program Management
, Office of Nuclear Reactor Regulation
SUBJECT:
NOTICE Of AP600 DESIGN /QA THE NUCLEAR REGULATORY COMMISSION (NRC) flNAL INSPECTION READINESS REVIEW DATE AND TIME:
September 23, 1997 - 8:30 a.m. - 5 p.m.
September 24, 1997 - 8:30 a.m - Noon (If necessary)
LOCATION:
Westinghouse Electric Corporation Westinghouse Energy Center Monroeville, Pennsylvania PURPOSE:
To review select Westinghouse documents and/or information related to AP600 design certification activities in order to ascertain their completion, i.e., readiness to support a final QA/ design NkC inspection, and adherence to AP600 project configuration manageraent control processes.
See attachment for scope of review.
PARTICIPANTS *:
HRG WESTINGHOUSE Bob Pettis Bob Tupper Juan Peralta Earl Novendstern, et al.
Ralph Landry Ed Throm Dave Terao Bill Huffman Docket No.52-003 hh Q ((g g [
Attachment:
As stated cc w/att: See next page
' Meetings between the NRC technical staff and applicants or licensees are open for interested #bers of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on 7
Staff Meeting Open to the Public," 59 federal Renit11t 48344, 9/20/94.
O,,#
However, portions of this meeting may be closed to protect Westinghouse proprietary information. Members of the public who wish to attend should i
contact me at (301) 415-1141.
\\
\\
DISTRIBUITON:
S" ""' " S "
ll l llllJilli ll DOCUMENT NAME: A:QA-9-23.N0T n.....,,.e w. 6,.
.. w.. w w,c c. c.,,.,em.n=s,n.ov w...
c. c.,,.%.n =h, nu.=w...
v. u. o,,
OfflCE PM:PDST:DRPM l
D:PDST:0 RPM l
NAME WCHuffmarfahCAA TRQuay-ON
'3 DATE 09/Q/97 09/p/97 m 1CIAL RECORD COPY 9709240272 970912 PDR ADOCK 05200003 A
Westinghouse Electric Corporation Docket No.52-003 cc: Mr. Nicholas J. Liparulo, Manager Mr. Frank A. Ross Nuclear Safety and Regulatory Analysis U.S. Department of Energy, NE-42 Nuclear and Advanced Technology Division Office of LWR Safety and Technology Westinghouse Electric Corporation 19901 Germantown Road P.O. Box 355 Germantown, MD 20874 Pittsburgh, PA 15230 Mr. Russ Bell Mr. B. A. McIntyre Senior Project Manager, Programs Advanced Plant Safety & Licensing Nuclear Energy Institute Westinghouse Electric Corporation 1776 I Street, NW Energy Systems Business Unit Suite 300 Box 355 Washington, DC 20006-3706 Pittsburgh, PA 15230 Ms. Lynn Connor Ms. Cindy L. Haag Doc-Search Associates Advanced Plant Safety & Licensing Post Office Box 34 Westinghouse Electric Corporation Cabin John, MD 20818 Energy Systems Business Unit Box 355 Dr. Craig D. Sawyer, Manager Pittsburgh, PA 15230 Advanced Reactor Programs GE Nuclear Energy Mr. M. D. Beaumont 175 Curtner Avenue, MC-754 Nuclear and Advanced Technology Division San Jose, CA 95125 Westinghouse Electric b rporation One Montrose Metro Mr. Robert H. Buchholz 11921 Rockville Pike GE Nuclear Energy Suite 350 175 Curtner Avenue, MC-781 Rockville, MD 20852 San Jose, CA 95125 Mr. Sterling Franks Barton Z. Cowan, Esq.
U.S. Department of Energy Eckert Seamans Cherin L Hellott NE-50 600 Grant Street 42nd Floor 19901 Germantown Road Pittsburgh, PA 15219 Germantown, MD 20874 Mr. Ed Rodwell, Manager Mr. S. M. Modro PWR Design Certification Nuclear Systems Analysis Technologies Electric Power Research Institute Lockheed Idaho Technologies Company 3412 Hillview Avenue Post Office Box 1625 Palo Alto, CA 94303 Idaho Falls, ID 83415 Mr. Charles Thompson, Nuclear Engineer AP600 Certification NE-50 19901 Germantown Road Germ.ntown, MD 20874
e, PROPOSED ECOPE OF SEPTEMBER 23 AND 24(If NECESSARY), 1997 a
AP600 DESIGN /QA NRC FINAL INSPECTION READINESS REVIEW Review configuration management control processes in place SCOPE:
for activities related to the verification, validation, and application of the NOTRUMP LOFTRAN, and WGOTHIC computer
- codes, includingbutnotlimitedto:
Code development records Calc notes and code files Record files for code input modelling Independent Verifications Review configuration management control processes in place for activities related to test analysis.
Including but not limited to!
Development of computer code input data and correspon-dance to facility physical parameters Determination of error bands / uncertainties considering both experimental data and code uncertainties Review the extent of completion of calculations and/or analyses that support the AP600 piping systems design, including associated ITAAC.
Specifically:
piping stress analyses (including Class 1 fatigue analy-ses, large and small-bore piping system design, finality of loadings such as seismic input and thermal stratifica-tionlords) pipe support design (typical des %n of seismic restraints used) high-energy line break analyses (break locations, typical pipe whip restraint design) environmental qual 1*ication assumptions (basis for selecting pipe bre k,/ cracks for pressurtration, flood-ing, temperature, hoinidity) leak-before-break analyses Examine the completion status of DSER confirmatory items identified during inspections of design certification test facilities AGENDA:
I Introduction and orientation 11 Review of selected material III Summary of staff ohn rvations Attachment
V
- GN!
randum to Theodore R. Quay. Dated: Seotember 12. 1997 PUBLIC' PDST R/F SCollins/FMiraglia. 0-12 G18 8Sheron, 0-12 GIS
'RZimmerman,-0-12 G18 JRoe DMatthews TJKenyon-WCHuffman JMSebrosky
.JWilson D$caletti WDean, 0-5 E23
-JMoore, 0-15 818 ACRS-(11)
RBalley, 0-2 82
- 1 Collins 0-8 E23
- C8erlinger, 0-8 H7 Alevin. 0-8 E23
.JKudrick,.0-8 H7 RLandry, 0-8 E23 EThrom, 0-8 H7 GHolahan, 0-8 E2 JPeralta, 0-9 /.,
RGramm, 0-9 Al 581ack, 0-9 Al RPettis.:0-9 04 GCwalina, 0-9 04 SRichards, 0-9 D24 LSpessard, 0-9 E4 PMNS (e-mail)
OPA (e-mail)
__.