ML20211A021
| ML20211A021 | |
| Person / Time | |
|---|---|
| Site: | 07001113 |
| Issue date: | 09/03/1997 |
| From: | Reda R GENERAL ELECTRIC CO. |
| To: | Weber M NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| Shared Package | |
| ML20211A026 | List: |
| References | |
| NUDOCS 9709240085 | |
| Download: ML20211A021 (3) | |
Text
o1Y_
GENaclear Energy ce w te ncca w y-ro awm nevocmx
+
910615-NDO i
- September 3,1997
. Mr. M. F. Weber Licensing Branch, NMSS U.S. Nuclear Regulatory Commission Mail Stop T 8-D-14 4.
- Washington, D.C._ 20555-0001
Subject:
Revision to the Radiological Contingency and Emergency Plan (RC&EP)
References:
- 1) Docket 70-1113, NRC License SNM-1097
- 3) Approval, RC Pierson to JF Klapproth,1/10/95
- 3) Approval, RC Pierson to JF Klapproth,3/1/95
- 4) Submittal, RJ Reda to RC Pierson,7/31/96
- 5) Approval, RC Pierson to RJ Reda,9/20/96 L
6)' Submittal, RJ Reda to MF Weber, 12/17/96 4
Dear Mr. Weber:
Pursuant to activities authorized by NRC License SNM-1097, GE's Nuclear Energy Production f.gy.
(NEP) facility hereby submits a minor revision to the Radiological Contingency and Emergency _
7 Plan (RC&EP) that does not reduce the effectiveness of the plan.
) is a description of the changes by page and section made to the RC&EP, F
i-Revisions are provided in Attachment 2 by entire chapter to facilitate replacement into the existing b
- RC&EP i.1anual. Chapters containing changes have the same submittal date (8/29/97) on the bottom of each page. These changes are indicated by an asterisk (*) in the right hand column of each page..
Six copies of this RC&EP submittal are hereby provided for your review, p
if you have any questions or would like to discuss the matter further, please call me on (910) 675-
~5889.
Sincerely,-
i GE gCL R EN RG 9709240085 970903 ?
. J.
ed anager h
PDR ADOCK 07001113 a
B-paq ;
Facility Licensing J
/zb enclosure -
I hh!.N k
.'cc:L RJR-97-108 7
A Gooden - NRC, Atlanta J
)
T Mr. M. F. Weber September 3,1997 Page 1 of 2 ATTACHMENT 1 DESCRIPTION OF CHANGES Page Section Description Master index Changed procedure title from " Confrontation' to
" Security Compromise".
i Revision Date By Changed dates of affected Chapters / Appendices to e
Chapter / Appendix 8/29/s7 with an asterisk.
I 1
Table of Contents Added DCP and FET to titles.
1.10 1.2.7 Added (FET) to title.
1.11 1.2.7 Updated Figure 1.2 with new fence line.
1.12 & 1.13 1.2.7 Updated drawings, Figures 1.3 and 1.4.
1.15 1.2.9 Updated Table 1.1, Chemical Storage.
1.16 1.2.9 Updated Figure 1.5, Grid Map.
1.31 1.3.1 Updated Tables 1.2 and 1.3 on Population Characteristics.
2.1 2.1 Clarified description on use of dry process.
2.3 -
2.1.2 Updated description to include DCP equipment.
2.6 2.1.3.3 Updated description to include DCP equipment.
3.3 & 3.4 3.1 Clarified use of Plan during non-radioactive incidents.
3.7 & 3.8 3.2.1 Clarified use of Plan during non-radioactive incidents.
3.10 3.2.2 Clarified use of Plan during non-radioactive incidents.
4.3 4.1 Updated Table 4.2 to reflect current titles.
4.5 4.2.1 Clarified that Appendix D is demonstration only and does not reflect current personnel.
4.6 4.2.1 Updated titles in Table 4.3.
4.12 4.3.2 Modified wording to indicate that some outside agencies do not issue agreement letters.
J
Mr. M. F. Weber September 3,1997 Page 2 of 2 l
DESCRIPTION OF CHANGES Page Section Description 4.13 4.4.1 Updated agency title.
5.4 & 5.5 5.2.3 Clarified use of Plan during non-radioactive incidents.
5.7 5.3.1 Clarified use of Plan during non-radioactive incidents.
5.8 5.3.1 Updated Table 5.2 to Clarify use of Plan during non-radioactive incidents.
5.9 5.3.2 Updated to include changes for DCP structure.
4 5.11 5.3.3 Updated Figure 5.1 with new fence line.
_5.16 & 5.17 5.3.7 Updated water capacity figures.
5.19 5.3.11.1 Updated Table 5.3 to show only items related to -
ventilation systems.
i 5.27 5.3.16 Updated water capacity figures.
5.31 5.4.1.1 Clarified the use of criticality alarm in CAA only.
5.32 5.4.1.1 Updated Table 5.4 to clarify the use of criticality alarm in CAA only.
5.34 5.4.2 Clanfied that Table 5.5 is used for emergencies involving radioactive materials only.
5.36 5.5.1 Updated Table 5.5 to clarify HF toxic exposure action levels.
7.1 7.1 Clarified that Appendix D is demonstration only and does not reflect current personnel.
7.3 7.2.2 Updated Table 7.1 to clarify facility personnel 4
experience used versus formal training.
7.9 7.7 Modified wording to indicate that some outside agencies do not issue agreement letters.
C.1 Appendix C Changed dates.-
)