September 18, 1997 MEMORANDUM TO:
Gregory C C valina, Section Chief Vendor Inspection Section Specialinspection Branch FROM:
Larry L. Campbell, Reactor Engineer Quality Assurance Section Quality Assurance and Maintenance Branch
SUBJECT:
INSPECTION PLAN COR: Nova Machine Products Corp.
INSPECTION DATES:
October 2 and 3,1997 VENDOR LOCATION:
Nova Machine Products Corporation P.O. Box 30879 Middleburg Heights, OH 44130 CONTACTS:
James Fitzwilliams, Manager - Quality Assurance DOCKET NO.:
99901052 INSPECTION REPORT NO.:
99901052/97-01 (Revision 1)
UNANNO'JNCED INSPECTION:
No INSPECTION TEAM MEMBERS:
Larry L. Campbell Donald Naujock VENDOR PRODUCTS:
Nova is a manufacturer and supplier of ferrous and nor';rrous bars, threaded fasteners, fittings and flanges, welding material, and other products used primarily in g
nuclear applications.
INSPECTION BASES:
10 CFR Part 50, Appendix B; 10 CFR Part 21 INSPECTION SCOPE:
Evaluate the implementation of Nova's quality program for safety related items including commercially dedicated
, n n p p, g material. Follow up on procurement issues and a
nonconformances identified during the June 2-6,1997, NRC Inspection at Nova. Determine if Nova performs required material specification tests and analysis for small products as addressed in NRC Inspection Report g g% f[
No. 99901052/97 of Nova, dated July 22,1997.
d O:
g ly H 00Y TppC t 5 c
9709d4 E'8 970918 c.,
ndo b
PDR GA99 e9e 9 ENVNOVA e
e I
i Examine appropriate records and documentation and confirm that Nova's description of steps that were taken to correct and prevent recurrence of Nonconformance No. 99901052/97 0101 (as discussed in Nova's Letter,
- Reply to a Notice of Nonconformance, " dated, August 18,1997) were satisfactory completed.
- 2. Review selected Nova commercial grade material dedication packages for the supply of small products and determine if all applicable tests and analysis required by the product material specification and customer purchase order were performed.
OTHER INFOhMATION:
Entrance meeting: October 2,1997, at approximately 8:00 a.m.
Exit meeting: October 3,1997, at approximately 10.00 a.m.
9ds/97 Signature:
v1 Larry L dampbeJI DATE' Approval:
f&U Gregory C. Cwalina, Section Chief, VlS DATE DISTRIBUTION: HQMB R/F Central Files SBlack RGramm
=
- =