Text
-.
dmmowunn ianom.iune
,o 1h INic Getterphtg Nathm
' 2601 Nonh 214 Ito.nl -
a*-
Wrwillo, lL (el 4414?47
+
.wisis m won =
- September 19,1997 United States Nuclear Regulatory Commisalon
' Attention: Document Contiol Desk Washington, D.C. 20555
Subject:
Supplemental Response to Notice of Violation 373(374)/96004 03
- LaSalle County Station, Units 1 and 2 Facility Operating License NPF 11 and NPF-18 NRC Docket Nos. 50 373 and 50 374
Reference:
J. C. Brons letter to United States Nuclear Regulatory Commission Dated August 2,1996, LaSalle County Station Response to NRC to Notice of Violations
_ Inspection Roport Nos. 50 373/96004; 50-374/96004 NRC Docket Numbers 50-373 and 50 374.
The reference letter submitted the LaSalle County Station response to
' Not!ce of Vloktion 373(374)96004 03, for the site meteorological tower regarding an inadequate engineering review. The letter contained the immediate corrective actions taken, including an laterim GSEP procedum revision to ensure that any inaccuraclew created by the existing site y
structures are bounded, as well as long-term corrective actions to preclude
[{
further violations is' to relocate the 10 meter wind speed hnd wind direction recurrence of the violations. The long term corrective action to prevent i
meteorological sensors to' a replacement meteorological tower located cutside the Station protected arsa at a distance from major site buildings in accordance with the ANSl/ANS 2.5 guldence. The replacement tower and meteorological Iristruments were to be operational by, September 30,1997.
y The replacement tower and' meteorological instrument project was initiated in November 1996. During April.1997, a preliminary 10CFR50.59 review y
L
' determ! nod that the proposed tower location was not a sufficient dictance
= ju' away from offsite power lines to assure that a tower or guy' wire failure would L not interfett with the onsite power lines. The tower 4
6 this assurance. The ralocation caused a significant project delay due to th_e gy J
' series ot9nginesring and permit reapplication actir s ruquired.
y y
i
+
9709240027 970919 e-
' ADOCK 0500o3?3b-(
U>
FDR POR $
fea h <, ma,,
[ Y ',',, s
',The permit to construct the tower at the new location was approved by the Federal Aviation Administration (FAA) on June 4,1997. The design for preliminary site work was issued on July 23,1997. The design for all other work was issued on August 5,1997. Project construction in the field started on July 28,1997. The current forced and refueling outages' priorities are also impacting the completion of this project. Shutdown risk considerations have blocked this project's work in the switchyard, and such blocks will reoccur in various upcoming outage work windows. As a result, LaSalle has revised the schedule. The new tower and its associated meteorological equipment will be installed, tested, and placed in service by July 31,1998.
In the meanwhile, the interim GSEP procedure provisions are in place.
If there are any questions or comments conceming this letter, please refer them to me at (815) 357-6761, extension 3600.
Respectfully, W~
fMC
~
W. T. Subalusky Site Vice President 7