ML20210V060
ML20210V060 | |
Person / Time | |
---|---|
Issue date: | 09/30/1986 |
From: | Rossi C Office of Nuclear Reactor Regulation |
To: | Rahe E WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
Shared Package | |
ML20210V063 | List: |
References | |
NUDOCS 8610100483 | |
Download: ML20210V060 (4) | |
Text
-
4:
Mr. E. P. Rahe, Jr. , Manager Nuclear Power Department SEP SO M Westinghouse Electric Corporation Box 355 Pittsburgh, Pennsylvania 15230
Dear Mr. Rahe:
Subject:
Acceptance for Referencing of Licensing Topical Report WCAP-7908, "Factran-A Fortran IV Code for Thermal Transients In UO2Fuel Rod" We have completed our review of the subject topical report WCAP-7908 and Appendix submitted by Westinghouse Electric Corporation letters NS-SL423 and NS-CE-563, respectively.
The material reviewed describes a computer program used in the calculation of fuel rod temperatures for various accidents and transients analyzed in Chapter 15 of Safety Analysis Reports. We find that this computer' program, FACTRAN, ,
is an acceptable code for referencing in licensing actions which require the '
calculation of heat fluxes and cladding temperatures during Chapter 15-type events, to the-extent specified and under the limitations delineated in the report and the NRC evaluation, which is enclosed.
We do not intend to repeat our review of the matters described in the report and found acceptable when the report appears as a reference in license applications, except to assure that the material presented is applicable to the specific plant involved.
~
Our acceptance applies only to the matters described in the report.
In accordance with procedures established in NUREG-0390, it is requested that Westinghouse publish accepted versions of this report, proprietary and non proprietary, within'three months of receipt of this letter. The accepted version is to incorporate in the text, as appropriate, all pertinent material included in the additional information furnished to the staff during the review as listed above. It is recommended that the accepted version be therefore published as Revision 1 to WCAP-7908. The accepted versions shall incorporate this letter and the enclosed evaluation between the title page and the abstract. The accepted versions shall include an -A (designating accepted) following the report identification symbol.
8610100483 860930 PDR TOPRP EMVWEST f>
C PDR I]
L
Mr. E. P. Rahe, Jr. Should our criteria or regulations change such that our conclusions as to the acceptability of the report are invalidated, Westinghouse and/or the applicants referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for the continued effective applicability of the topical report without revision of their respective documentation.
Sincerely, Original eigned$
Charles E. Rossi, Assistant Director Division of PWR Licensing-A
Enclosure:
As stated DISTRIBUTION:
Central File DPLA RF NRC PDR R. Emch, PPAS RSB RDG B. Clayton AD RF D. Moran H. Smith R. Diggs W. Thomas W. Minners W. Hodges
- See previous concurrence RSB:PWR-A RSB:PWR-A RSB:PWR-A R-
- THsii:sl
- RLobel *CBerlinger ossi 9 g 86 9/n'86 9hal.86 9/5dh6
Mr. E. P. Rahe, Jr. In accordance with procedures established in NUREG-0390, it is requested that Westinghouse publish accepted versions of this report, proprietary and .
non-proprietary, within three months of receipt of this letter. The accepted version is to incorporate in the text, as appropriate, all pertinent material .
included in the additional information furnished to the staff during the ,
review as listed above. It is recomended that the accopted version be therefore published as Revision 1 to WCAP-7908. The accepted versions shall incorporate this letter and the enclosed evaluation between the title page and the abstract. The accepted versions shall include an -A (designating accepted) following the report identification symbol.
Should cur criteria or regulations change such that our conclusions as to the acceptability of the report are invalidated, Westinghouse and/or the applicants referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for the continued effective applicability of the topical report without revision of their respective documentation.
This letter of acceptance and the Safety Evaluation attached correct and supersede the Safety Evaluation transmitted by letter of October 16, 1984, Cecil 0. Thomas to E. P. Rahe, Jr.
Sincerely, Charles E. Rossi, Assistant Director Division of PWR Licensing-A
Enclosure:
As stated DISTRIBUTION:
Central File DPLA RF ,
NRC PDR R. Emch,,PPAS RSR RDG B. Clayton AD RF /
D. Moran /
H. Smith /
R. Diggs W. Thomas /
/
W. Minners % pww.o Mu_u )A W. Hodges p OLc M u h RSB:PWR-A6 'RSB:PWR d RSB:PWR-AM PWR-A:AD YHsii:sl , RLobel CBerlinger CERossi 9W86 9/g#86 9/gf86 9/ /86 s _ _ _ . - _ _ _ _ . _
I
. Mr. E. . P. Rahe, Jr. - In accordance with procedures established in NUREG-0390, it is requested that Westinghouse publish accepted versions of this report, proprietary and
'non-proprietary, within three months of receipt of this letter. The accepted version is' to incorporate in the text, as appropriate, all pertinent material included in the additional information furnished to the staff during the review as listed above. It is recommended that the accepted version be therefore published as Revision 1 to WCAP-7908. The accepted versions shall incorporate this letter and the enclosed evaluation between the title page and the abstract. The accepted versions shall include an -A (designating accepted) following the report identification symbol.
Should our criteria or regulations change such that our conclusions acceptability of the report are invalidated, Westinghouse and/or th,as e to the applicants referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justificatipii for the continued effective applicability of the topical report wit out revision of their respective documentation.
ThisletterofacceptanceandtheSafetyEvaluationaptachedcorrectand superside the Safety Evaluation transmitted by lett f of October 16, 1984, Cecil 0. Thomas to E. P. Rahe, Jr.
Sincer y, Charles E. Rossi, Assistant Director for-PWR Licensingh' Division of PWR Licensing-A
Enclosure:
As stated DISTRIBUTION:
Central File gp SB R C */#
AD RF 08 D. Moran H. Smith R. Diggs W. Thomas ,'.
W. Minners W. Hodges RSB: -A RSk R- RSB:PWR-A PWR-A:AD YHsit:sl RLobel CBerlinger CERossi 9/tJ86 94?/86 9/)#86 9/ /86 I