ML20210U545

From kanterella
Jump to navigation Jump to search
Notice of Withdrawal of Application for Approval of Indirect Transfer of FOL for Pilgrim Npp.Approval No Longer Needed Since Beco Sold Interest in Pilgrim to EOI & No Longer Holds License for Pilgrim
ML20210U545
Person / Time
Site: Pilgrim
Issue date: 08/17/1999
From: Wang A
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20210U521 List:
References
NUDOCS 9908200160
Download: ML20210U545 (3)


Text

_

  • o l

7590-01-P UNITED STATES NUCLEAR REGULAiORY COMMISSION BOSTON EDISON COMPANY DOCKET NO. 50-293 NOTICE OF WITHDRAWAL OF APPLICATION FOR APPROVAL OF INDIRECT TRANSFER OF FACILITY OPERATING LICENSE

' The U.S. Nuclear Regulatory Commission (the Commission) has granted the request of Boston Edison Company (BECo) to withdraw its February 3,1999, application, as supplemented on May 27,1999, by BECo for approval of the indirect transfer of the Facility Operating License for the Pilgrim Nuclear Power Station (Pilgrim).

The application was seeking approval of the indirect transfer of the Facility Operating License for Pilgrim held by BECo. The indirect transfer would have resulted from the planned formation of a new holding company, NSTAR, of which Commonwealth Energy System and BEC Energy, the parent company of BECo, are to become wholly owned subsidiaries. The approvalis no longer needed since BECo sold its interest in Pilgrim to Entergy Nuclear Generation Company on July 13,1999, and no longer holds the license for Pilgrim.

The Commission had previously issued a Notice of Consideration of Approval of Application Regarding Proposed Corporate Merger and Opportunity for Hearing published in the FEDERAL REGISTER on June 17,1999 (64 FR 32556). However, by letter dated July 20, 1999, the applicant, through counsel, withdrew the application.

1 For further details with respect to this action, see the application dated February 3,1999, as supplemented May 27,1999, and the applicant's letter dated July 20,1999, which withdrew the application for approval of the indirect transfer. The above documents are available for public j i

9908200160 990817 '

PDR ADOCK 05000271 P PDR

p .

l I- inspection at the Commission's Public Document Room, the Gelman Building,2120 L Street, NW., Washington, DC, and at the local public document room located at the Plymouth Public Library,132 South Street, Plymouth, Massachusetts 02360.

Dated at Rockville, Maryland, this 17th day of August 1999.

FOR THE NUCLEAR REGULATORY COMMISSION dde ha>Lt Alan B. Wang, Proje Manager, Section 2 Project Directorate l Division of Licensing Project Management Office of Nuclear Reactor Regulation l

1 i

i I I

l n_ l

F DISTRIBUTION: J

' Dock t Filo-PDI-2 r/f TCLARK August 17e 1999 ""U MEMORANDUM TO: Rules and Directives Branch Division of Administrative Services {

Office of Administration

{'

FROM: Office of Nuclear Reactor Regulation

SUBJECT:

BOSTON EDISON CS FANY - PILGRIM NUCLEAR POWER STATION

,1 One signed original of the federal Register Notice identified below is attached for your transmittal to the Office of the Federal Register for publication. Additional conformed copies ( FIVE ) of the Notice are enclosed for your use.

Notice of Receipt of Application for Construction Permit (s) and Operating License (s).

Notice of Receipt of Partial Application for Construction Permit (s) and Facility License (s):

Time for submission of Views on Antitrust matters.

Notice of Consideration of issuance of Amendment to Facility Operating License. (Call vdith 30-day insert date).

Notice of Receipt of Application for Facility License (s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of issuance of Facility License (s) and Notice of Opportunity for Hearing.

Notice of Availability of NRC Draft / Final Environmental Statement.

Notice of Limited Work Authorization.

Notice of Availability of Safety Evaluation Report.

Notice of Issuance of Construction Permit (s).

Notice of Issuance of Facility Operating License (s) or Amendment (s).

Order.

Exemption.

Notice of Granting Exemption.

Environmental Assessment.

Notice of Preparation of Environmental Assessment.

Receipt of Petition for Director's Decision Under 10 CFR 2.206.

Issuance of Final Director's Decision Under 10 CFR 2.206.

Other: ge,. .i ug +u- - -1 of a 14,.+q F. , i y.;_m1 af Indira,tTTranefer of Facility Operating License.

DOCKET NO. 50-293 l Attachment (s): As stated

Contact:

A. Mang ,

Telephone: 415-1445 DOCUMENT NAME: MA53333.WTD To rec 4ve a copy of this document, indicate in the box: 'C" = Copy without attachment / enclosure "E' = Copy with attachment / enclosure 'N' = No copy OFFICE LA/fDift lC l l l l l l l NAME [Cl W l DATE 08/lK /99  ;

{ OFFICIAL RECORD COPY

( .. , _ . .

_