, e .f October 3, 1986

~ Docket No. 50-416 LICENSEE: Mississippi Power.& Light Company (MP&L)

FACILITY: Grand Gulf Nuclear Station, Unit 1

SUBJECT:

SUMMARY

OF SEPTEMBER 18, 1986 MEETING REGARDING HYDRAULIC STABILITY TESTING The purpose of the treeting at the plant site was to review the instrumentation, procedure and expected data for tests of hydraulic stability testing and tour the plant control room. These tests are planned to be run during startup from the first refueling outage. Enclosed is a list of the attendees. This report was prepared by L. Phillips.

Y. Balas of MP&L presented the agenda for the meeting (Attachment 1) and a proposed test plan (Attachment 2). Attachment 3 is a power-flow operating map with EXXON pre-predictions of decay-ratios of 0.60 and 0.90 indicated on the map. It was agreed at the meeting that a test objective would be measurement of the decay ratio at the five operating points indicated on Attachment 3. It was also agreed that EXXON would use the GETARS data for evaluation of the stability measurements and benchmaking of EXXON codes. Data obtained from the ORNL on-line monitor would also be available. It was also agreed that ORNL would obtain tapes of the test data as backup to GETARS and for use in an independent audit if needed. GETARS data will also be available to NRC/0RNL if needed for evaluation purposes.

Discussions concluded that measurements which indicate substantially lower measured decay ratios compared to predictions may provide a basis for early

. technical specification relief of detection / suppression requirements above 45%

flow. Further refinement of GE SIL-380 defined operating regions would-depend strongly on the demonstrated reliability and predictive results of EXXON analyses.

After the meeting, there was a tour of the control room area to review the accessibility to plant process signals needed for ORNL noise measurements.

Potential signal connector locations were chosen, pending the result of a review of wiring diagrams and signal characteristics by MP&L.

CH88a*! h aby Lester L. Kintner, Project Manager BWR Project Directorate No. 4 Division of BWR Licensing Enclosure (s):

As stated

,, DISTRIBUTION cc w/ enclosure (s):

  • Docket File > M0'Brien See ext page NRC PDR Young, OGC LPDR EJordan PD# M PD#4/D ,

PD#4 Rdg BGrimes LKintner:ca WButler ,

WButler ACRS (10) 10/3/86 10/ /86 LKintner 3

8610100034 861003 PDR ADOCK 05000416 P PDR

~ ._ _

. Mr. Oliver D. Kingsley, Jr.

Mississippi Power & Light Company Grand Gulf Nuclear Station cc:

Robert B. McGehee, Esquire The Honorable William J. Guste, Jr.

Wise, Carter, Child, Steen and Caraway Attorney General P.O. Box 651 Department of Justice Jackson, Mississippi 39205 State of Louisiana Baton Rouge, Louisiana 70804 Nicholas S. Reynolds, Esquire Bishop, Liberman, Cook, Purcell Office of the Governor and Reynolds State of Mississippi 1200 17th Street, N.W. Jackson, Mississippi 39201 Washington, D. C. 20036 Attorney General Mr. Ralph T. Lally Gartin Building Manager of Quality Assurance Jackson, Mississippi 39205 Middle South Services, Inc.

P.O. Box 61000 Mr. Jack McMillan, Director New Orleans, Louisiana 70161 Division of Solid Waste Management Mississippi Department of Natural Mr. Larry F. Dale, Director Resources Nuclear Licensing and Safety Bureau of Pollution Control Mississippi Power & Light Company Post Office Box 10385 P.O. Box 23054 Jackson, Mississippi 39209 Jackson, Mississippi 39205 Alton B. Cobb, M.D.

Mr. R. W. Jackson, Project Engineer State Health Officer Bechtel Power Corporation State Board of Health 15740 Shady Grove Road P.O. Box 1700 Gaithersburg, Maryland 20877-1454 Jackson, Mississippi 39205 Mr. Ross C. Butcher President Senior Resident Inspector Claiborne County Board of Supervisors U.S. Nuclear Regulatory Commission Port Gibson, Mississippi 39150 Route 2, Box 399 Port Gibson, Mississippi 39150 Mr. Ted H. Cloninger Vice President, Nuclear Engineering Regional Administrator, Region II and Support U.S. Nuclear Regulatory Commission, Mississippi Power & Light Company 101 Marietta Street, N.W., Suite 2900 Post Office Box 23054 Atlanta, Georgia 30323 Jackson, Mississippi 39205 Mr. J. E. Cross Grand Gulf Nuclear Station Site Director Mississippi Power & Light Company P.O. Box 756 Port Gibson, Mississippi 39150 Mr. C. R. Hutchinson GGNS General Manager Mississippi Power & Light Company Post Office Box 756 Port Gibson, Mississippi 39150

O Enclosure Grand Gulf Attendees for September 18, 1986 meeting Larry Phillips RSB/ DBL USNRC Mike Harrigill MP&L GGNS Technical Support Dykes Cupstid MP&L Tehnical Support Ray Patterson MP&L Technical Paul Burnett USNRC Region II Larry Nielsen ENC Engineer Hal Williamson ENC Engineer Dwayne N. Fry ORNL I&C Division Israel Nir MSS Nuclear Engineering Yosi Balas MP&L Reload Project Manager

--~

Jim Lee --

MP&L Nuclear Fuels Rich Kelley MP&L NPE Shie-Jeng Peng MSS Nuclear Engineering

- W h3

, Attachment 1 AGENDA CS Test Necting - 9/18/86 I. Irrtroduction: YB(MP&L)

A) Purpose of meeting B) Purpose of test C) Operating License Condition II. Description of recording instrumentation and DwayneN. Fry (0RNL) irrterface requirements:

A) Equipment verification B) Equipment hook-up C) Signal conditioning III. Overview of test process DNF A) Signal selection; number of signals; -

characteristics / requirements B) Test description: Data acquisition /on line processing

  • f C) Responsibility / number of personnel -

D) Pre-test arrangements / requirements: Equipment Y transport, set-up, baseline data acquisition, etc, E) Startup pattern infonnation requirements /other ;

information IV. Post test Da'ta handling / processing DNF A) analyses and methodology B) correlation between test results and definition of DAS region V. Review / discussion of test procedures YB/All J13 MISC 86091501 - 1

= = - - - - - -

u__ _ _, _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ . _ . _ . _ _ _

, , eg.m sa amnives m ewxmmemm us. e.c VI. Terms / conditions / agreements YB A) TTS methodology acceptance by NRC (See Test Plar. Attachment 2)

B) Data /Results proprietary to GGNS C) Copy of Data / analysis results from ORNL VII. Milestone schedule & DDR (Attachment 3) YB VIII. Inspection of GETARS/ test area DGC/YB I

I i

l l

I i

l J13 MISC 5 091501 - 2 l

t.,.. .. . . . _ _ . _ . . _ . . . . . . . . _ . . . . _ . . _ . . . . . _ . ..

Attachment 2

~

Proposed j CS Test Plan (Schedule & DOR)

1) Methodology of Test to TS (TTS)* ENC 9/16/86
2) Draft test procedure ENC 9/16/86 (S/U Pattern, interface requirements, contingency 3x noise, contingency if DR greater than calculated)
3) Review / comments - Methodology and PLS, NPE, NFS, 9/18/86 procedure MSS, ORNL, NL
4) Meeting at GGNS PLS, NPE, NFS, 9/18/86 MSS, ORNL, NL
5) Definition of D0R/ interface NL 9/19/86
6) Complete TTS Methodology ENC 9/23/86
7) Confirm acceptance of outlined TTS NL/ ENC 9/25/86 Methodology with NRC
8) Draft Pre-test DR Predictions ENC C/7/^LCo%ffi eg
9) Review / comments on Draft PLS, NPE, NFS, , C, .,, Jc emf/ c 4 MSS, NL
10) Complete Test Procedure & 50.59 NL/NFS/NPE 10/10/86
11) Confirm acceptability of procedure PLS 10/16/86
12) Test Procedure to PSRC NL 10/17/86
13) Final Pre-test DR Prediction ENC 10/21/86
14) Confirm NRC acceptance of detailed NL 10/24/86 TTS Methodology
15) Equipment Verification ORNL
16) GETARS Verification PLS 10/24/86
17) Equipment Hook-up ORNL
  • TTS - from Test to TS change - Methodology to define the D&S region by identifying a correlation between test data and Equilibrium cycle COTRAN predictions, and elimination of uncertainties.

J16 MISC 86091501 - 1

Attachment 2

18) Perform Test PLS/0RNL 11/5/86
19) Provide GETARS tapes to MSS PLS 11/7/86

>&A it /o 6/JL

20) ProvidefdataandresultstoMP&L ORNL
21) GETARS tapes to ENC MP&L 11/17/86 e-"*-

. .._ .':._ N r_'r '-

- :,m . , ; ,C -

enink' 2$). Test generated DR - Draft report ENC 11/28/86

23) Draft report of D&S Region ENC 11/28/86 Contingent upon evaluation of test results 2$) Review / comments on draft reports MP&L 12/5/86 2j7 CS PCOL for reviews NL 12/5/86 '

2J) Final report of D&S Region ENC 12/12/86

29) Final PCOL to PSRC/SRC NL 12/15/86
23) PSRC/SRC Approval NL 12/18/86

,39p NRC Submittal NL 12/19/86 9

J16 MISC 86091501 - 2

,5 ,

OTACHHENT 3 -

g26/84 gs 18 0 0

A - leATUIIAL Calu2 EAT 9008 g 3 - LOW IEtaIICULATION Puer SPEED wet.vt emsetestas 7098790B0 j # ' 43.6 .

@ 10. - ,

C - RJDW MOstCULATl000 PUIsP SPEED wnLVE teAltessues potty

    • 8g g;

o - nATEo ucsuutATion euer sPEEo wu.vr maansuu PoseT

/p* .

E q a -

- o 4 - o S' I o8a#',

    • #' y y 5*

~

GE ] y .

$ h,

./'

9 . ,

i fn . O -Tbs t Po,'nts -

/  :

}g }

j 4

s g ,

8

/ I

,np s** -

s iyj l^

i y so - - ts y>"

\ . . t

[a 5" i j y

=

40 - 4 w ' #

u,,..,.. .

fb# to M

. c. -

!' 6888' #

! 5 4.

i 7 08'

if . .

" ~

cAvsvafsoM setesoes p

I

.x D * ~

l lk7 i

to -

O I l Il l I I I I I I 2 o so . . . ,o . . .

I1 Percosst of RATED CGIE flour 2.

s O % f fl in ts l FIGURE B 3/4 2.3-1 POWER - FLOW OPERATING MAP h

4 .% -