ML20210U077
| ML20210U077 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 01/31/1987 |
| From: | Couture R, George Thomas PUBLIC SERVICE CO. OF NEW HAMPSHIRE |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NYN-87016, NUDOCS 8702180382 | |
| Download: ML20210U077 (6) | |
Text
..
-t OPERATING DATA REPORT DOCKET NO.
50-443
'DATE 02/06/87 COMPLETED BY
-R. Couture TELEPHONE (603) 474-9521 j:
(Ext. 4077)
OPERATING STATUS 1.
Unit Name:
Seabrook Station Unit 1
- 2. -Reporting Period:
January 1987 3.
Licensed Thermal Power (NWt):
3411 4.
Nameplate Rating (dross NWe):
1197 5.
Design Electrical Rating (Net NWe):-
1148 6.
Maximum Dependable Capacity.(Gross NWe):
1197 (Initial design value)
,1 7.
Maximum Dependable Capacity (Net NWe):.
1148 (Initial design value) 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
{
Since Last Report, Give Reasons:
Not Applicable f
9.
Power Level To Which-Restricted, If Any (Net NWe):
Zero power
[
j
- 10. Reasons For Restrictions, If Any:
License issued on 10/17/86 is a zero power i
license which allows fuel loading and performance of non-nuclear testing.
1 j
This Month Yr.-to-Date Cumulative-1 l
- 11. Hours In Reporting Period 744.0 744.0 2569.0
{
- 12. Number Of Hours Reactor Was Critical 0.0 0.0 0.0
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On-Line 0.0 0.0 0.0 l
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 i
- 16. Gross Thermal Energy Generated (MWH) 0 0
0 l
- 17. Gross Elec. Energy Generated (MWH) 0 0
0 i'
- 18. Net Electrical Energy Generated (NWH) 0 0
0
- 19. Unit Service Factor 0.0 0.0 0.0 -
{
- 20. Unit Availability Factor 0.0 0.0 0.0 i
- 21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 0.0 2
- 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 0.0 i
- 23. Unit Forced Outage Rate 0.0 0.0 0.0 4
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration-of Each):
Not Scheduled
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup Not Applicable 4
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved 1
INITIAL CRITICALITY 1987 Not Applicable l
INITIAL ELECTRICITY 1987 Not Applicable COMMERCIAL OPERATION 1987 Not Applicable 1
i i
4 3
8702180302 870206 _
PDR ADOCK 0500044a A
I R
PIN 4 gr 1
\\\\
L.
a-AVERAGE DAILY UNIT POWER LEVEL
- \\
DOCKET NO.
'50-443-UNIT -Seabrook 1 DATE 02/06/87
. COMPLETED BY R. Couture TELEPHONE (603) 474-9521 (Ext. 4077).
. MONTH JANUARY, 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
.(MWe-Net)
(MWe-Net)
-1 0
16
-0 2
0 17
'O-3 0
18 0-
'4 0
19 0:
5 0
20 0
6 0
21 0
7 0
22 0
8 0
23 0
9 0
24 0
10 0
25 0
11 0
26 0
12 0
27
'O 13 0
28 0
14 0
29 0
15 0
30 0
31 0
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each_ day in the reporting month. Compute to the nearest whole megawatt.
i l
l
DOCKET NO.
50-443 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Seabrook 1 DATE 02/06/87 COMPLETED BY R.
Couture REPORT MONTH JANUARY, 1987 TELEPHONE '(603) 474-9521 (Ext. 4077) 1 No. Date Type Duration Reason 2 Method of Licensee
'Cause & Corrective l
(Hours).
Shutting Event Action to 3
Down Reactor Report #
Prevent Recurrence NO ENTRIES FOR THIS M0KrH 1
2 3.
F: Forced Reason:
Method:
S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test
. 2-Manual Scram-f,-Re fueling -
3-Automatic Scram D-Regulatory Restriction 4-Continued from E-Operator Training & License Examination previous month.
F-Administ rat ive.
. 5-Power Reduction G-Operational Error.(Explain)
(Duration.= 0)
H-Other (Explain) 9-Other (Explain):-
e
-c Doekst No.
50-443 Lt Dhto' 02/06/87
~~
Unit Name' Serbrook 1 <
'l
'l l~
' Completed By' R. Couture l
Telephone'-(603) 474-9521 (Ext. 4077) 1 CORRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY RELATED EQUIPMENT Page 1 of 1 REPORT MONTH JANUARY, 1987 l
l DATE SYSTEM COMPONENT MAINTENANCE ACTION l
l 01/19/87 Containment CAH-FV-6573 Repaired burned solenoid coil Conax Air Handling Radiation Monitor Supply connection.
Line Isolation (Inside Reactor Compartment) 01/26/87, Service Water SW-TSL-6103-V7 Replaced sheared valve stem.
Effluent sample valve.
i l
w.
-Docket N2.
50-443
~
Datot-02/06/87 Completed By:
R. Couture Telephone:
(603) 474-9521 (Ext. 4077)-
F
-REFUELING INFORMATION REQUEST ~
'1. Name of" facility:
Seabrook Unit 1
- 2. Scheduled date for next refueling shutdown:
Not Scheduled
.3.
Scheduled date for restart following refueling:
'Not. Scheduled
[
- 4. Willirefueling or resumption of operation thereafter require a technical specification change or other license amendment?
?
Unknown at this time.
j-
- 5. ?cheduled'date(s) for submitting licensing action and supporting information:
l Not Applicable
- 6. Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
j None i
- 7. The number of fuel assemblies (a) in the core and (b) in the spent-I fuel storage pool:
i (a) In Core:
193 (b) 0
- 8. The present licensed spent fuel pool storage capacity and the' size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present licensed capacity:
1236 No increase in storage capacity requested or planned.
I
- 9. The projected date of the last refueling that can be discharged to i
the spent fuel pool assuming the present licensed capacity:
i Licensed capacity of 1236 fuel assemblies based on sixteen refuelings and full core offload capability.
The current licensed capacity is adequate until at least the i_
year 2007.
i
r:
Geot9eS M yI wo.needert Nuchar Moduchon Put2c Service of New HampeNro New Hampshire Yankee Division NYN-87016 February 6, 1987 United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk
Reference:
(a) Facility Operating License No. NPF-56, Docket No. 50-443 Subj ect: Monthly Operating Report
Dear Sir:
In accordance with Technical Specification Section 6.8.1.5, enclosed please find Monthly Operating Report 87-01 covering the operation and shutdown experience relating to Seabrook Station Unit 1.
Very truly yours, d
George S. Thomas Enclosure cc: Regional Administrator U.S. Nuclear Regulatory Commission - Region I 631 Park Avenue King of Prussia, PA 19406 Mr. A. C. Cerne NRC Senior Resident Inspector Seabrook Station Seabrook, NH 03874 d
f 1
N P.O. Box 300. Seabrook, NH 03874. Telephone (603) 474-9574