Requests Waiver of 10 Reactor Startup Requirements for Training Program,For Listed Senior Reactor Operator Candidates.Objectives for Plant Startup Training Simulator Encl
ML20210T876
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 02/06/1987
From: Josiger W
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IP3-MPC-017B, IP3-MPC-17B, IP3-WAJ-012Z, IP3-WAJ-12Z, NUDOCS 8702180329
Download: ML20210T876 (3)


Text

m-Indian Point 3 Nuclear Power Plant P.O. Box 215 Buchanan, NewWrk 10511 914 739.8200

  1. > NewYorkPbwer 4# Authority February 6, 1987 IP3-WAJ-012Z IP3-MPC-017B Docket No.

50-286 License No. DPR-64 Dr. Thomas Murley Region I Administrator U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406

Subject:

Senior Reactor Operator License Applications

Dear Mr. Murley:

I am writing on behalf of the Authority to request a waiver from a training requirement specified in Examiner Standard 109 applicable to Senior Reactor Operator (SRO) candidates.

Specifically, a waiver is requested from the training requirement that ten (10) reactor startups be performed by our current SRO candidates.

In lieu of this training, the candidates have participated in extensive simulator training utilizing a full scope simulator. This training included ten startups performed by each candidate. Attached is a listing of the objectives associated with the simulator Reactor Startup course.

The simulator utilized was the Indian Point 2 simulator which is fully capable of duplicating Indian Point 3 operation for the purpose of evaluating the attached objectives.

Furthermore, the Indian Point 3 plant simulator training program has been accredited by the Institute of Nuclear Power Operations.

8702180329 870206 PDR ADOCK 05000286 V

PDR ffe $ neb

$4b g,.gg4 8H/r/////d a

4 lAdf1/$1fa ij,

m-s.

.)

4

- We would appreciate the' waiver of.the. ten reactor startup requirement from the training program for the.following SRO applicants:

Candidates:

s James Comiotes John Donnelly Elizabeth Lee-

. Thomas Orlando Thomas Pulcher Carl Reiniger

. Brian Sullivan

~ Very truly y rs,

. A.-Jos ge Resident a ager Indian t 3 Nuclear Power Plant WA C:1g cc:

M. Cass R. Tansky

_,v

~.

d 1i ATTACHMENT II OBJECTIVES FOR' PLANT START-UP TRAINING: SIMULATOR-

-Terminal Objective 2.2.0 Perform a reactor startup to the point of adding heat and warmup and pressurize the secondary plant in preparation for turbine generator startup.

Enchling Objective 2.2.1 Calculate an estimated critical position using SOP-RPC-3.

2'2.2 Calculate Boron concentration to achieve an. estimated criticr1 rod position of 100 steps on Bank "D".

2.2.3 Startup the main condensate. system using SOP-C-2.

2.2.4 Warmup the secondary plant using SOP-MS-1.

2.2.5 Place all circulating water pumps in service as per SOP-RW-1.

2.2.6 Establish condenser vacuum using SOP-C-1.

2.2.7 Maintain pressurizer level.

2.2.8 Withdraw the shutdown banks in sequence.

2.2.9 Take the reactor critical at no time exceeding a SUR of 0.5 DPM.

2.2.10 Perform source range and intermediate range channel check 3PT-V1 and 3PT-V2.

-2.2.11 Verify proper rod bank overlap while withdrawing control banks.

2.2.12 Use the power doubling rule to predict actual critical rod height at each doubling.

2.2.13 Block S.R.

and S.R.

High Flux Trip when P-6 lamp illuminates.

-8 2.2.14 Raise reactor power to 1X10 amps and stabilize the reactor'for critical data, without exceeding a 0.5 DPM SUR.

2.2.15 Maintain S/G levels between 40% and 55% using_ auxiliary feedwater.

2.2.16 Increase reactor power to the POAH and properly identify the POAH.

2.2.17 Properly maintain the CCR logbook and logsheets taking appropriata actions for out of normal readings.

2.2.13 Respond to all annunciators using the ARP's.

The trainee shall demonstrate mastery of the enabling objective by performing each one on the simulator meeting the standards specified in the objective or the applicable procedures.

Page 2 of 3 (ILO-SIM-2)

,