Forwards Results of Review of Design Basis for Operation of motor-operated Valve Switch Settings,Per IE Bulletin 85-003.Written Results Will Be Submitted Upon Conclusion of Testing Program
ML20210T831
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/01/1986
From: Agosti F
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-85-003, IEB-85-3, VP-86-0137, VP-86-137, NUDOCS 8610090221
Download: ML20210T831 (5)


Text

- . .

h /n 6 Oc"titOf Nuclear Operations MrOR r.. . October 1, 1986 Nb (@3:33 58s.4 50y'@ll,H%ig VP-86-0137 Nuclear operations I

Mr. James G. Keppler Regional Administrator Region III

' U. S. Nuclear Regulatory Commission 799 Roosevelt Road

, Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

1

Reference:

(1) Fermi 2.

NRC Docket No. 50-341

, NRC License No. NPF-43 e

(2) IE Bulletin 85-03, Motor-Operated Valve Common Mode Failures During Plant Transient Due to Improper Switch settings (3) NEDC-31322, BWR Owner's Group Report on the Operational Design Basis of Selected Safety-Related Motor-Operated Valves, September 1986 (4) NRC letter to BWROG, " extension of BWROG submittal for IEB 85-003 until September 1, 1986", dated June 8, 1986

Subject:

Motor-Operated Valve Switch Settings In accordance with the requirements of IEB 85-03, paragraph a, Detroit Edison has reviewed the design basis for the operation of each valve requiring testing, in accordance with 10CPR50.55a(g). The results of this review are included in Table 1. Detroit Edison has adopted the basic methodology set

[ forth in reference 3 to calculate the maximum valve differential pressure. This letter is being submitted in accordance with the revised schedule stated in reference 4.

Based on the calculated maximum differential pressures listed i.

in Table 1, Detroit Edison will determine those torque switch

!. settings which are enveloped by our current design basis.

Those settings found to be within the design basis require no

, modifications or special tests, as our design basis for Motor Operated Valves has been compared to the as-built condition of Fermi 2 and verified during pre-operational and surveillance testing. Motor operator valves encompassed by Fermi 2's existing design basis and previously verified to be operable will be identified by December, 1986.

8610090221 861001 2 YIO PDR ADOCK 05000341 00T G PDR ,

f fi J j

6 tir. James G. Keppler October 1, 1986 VP-86-0137 Page 2 For those valves whose maximum differential pressure exceeds the design basis differential pressures, new settings will be obtained from the valve manufacturer. Upon receipt of the new, vendor supplied, settings Fermi 2 procedures will be modified accordingly.

Any switch setting changes determined to be necessary as a result of the reviews described above will be made as soon as possible following verification and approval in accordance with Detroit Edison's design modification program. Settings found to be nonconservative will be evaluated to determine equipment operability in accordance with Fermi 2's non-conformance/cor-rective action process.

A valve testing program will be established to demonstrate that each required valve, for which operability has not been previously demonstrated, will operate at the established maximum differential pressure. For those valves which cannot be tested against maxinum differential pressure due to system or operational limitations, alternate test methods will be proposed. The testing program will be submitted to the IHC by November, 1987.

At the present time it appears that the testing program will require an extended plant shutdown to instrument and test the valves. Since the next extended plant outage is scheduled for the first refueling outage in March 1988, Detroit Edison hereby requests an exerption from the Novenber 15, 1987 test completion deadline specified in paragraph e.2 of IEB 85-03.

Testing will be conpleted prior to operation following the first refueling outage. Any testing which can be accomplished prior to the outage will, of course, be performed.

A written report will be submitted to the ?UC upon conpletion of the Motor Operated Valve testing program. This report will contain the informatin required by paragraph of IE Bulletin 85-03.

If you have any questions regarding this matter, please contact Mr. Frank Sondgeroth at (313) 586-5147.

Sincerely,

-p' [ Y cc: M. D. Lynch W. G. Rogers G. C. Wright USNIC Document Control Desk Washington, D. C. 20555

r Mr. James G. Keppler October 1, 1986 VP-86-0137 Page 3

[ I, FRANK E. AGOSTI, do hereby affirm that the foregoing statements are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.

YC FRANK E. (GOSTI Vice President Nuclear Operations On this / day of , 1986, before me personally appeared Frhnk E. Agosti, being first duly sworn and says that he executed the foregoing as his free act and deed.

Notary Public MARCIA BUCK

, Notary Public.WpsDtenaw Qounty, Mi

,.x., i. _ Ny Commission epires Dec.13,1987 NL m 17 m

, W

- _ , _ - _ . _ -. -- .,,7 .._-.7--. . -,m-- , --

Mr. James G. Keppler October 1, 1986 VP-86-0137 Page 4 bec: F. E. Agosti L. P. Bregni C. Borr (WPSC, Inc)

J. E. Conen J. H. Flynn J. W. Honkala J. D. Leman R. S. Lenart L. Martin F. A. Mulcahy S. H. Noetzel J. A. Nyquist G. R. Overbeck T. Randazzo S. Savage-(NUS)

B. R. Sylvia J. P. Thorpe

-G. M. Trahey A. E. Wegele R. L. Woolley Approval Control NRC Follow-up Book /NRC File Region III Chron File Secretary's Office (2412 WCB)

( ,

r TABLE 1 Active Safety Action . Maxirrum Expected dP open close opening closing NEDc-31322 PSI PSI HPCI System Table 3 Valve # Valve #

2 F006 1 y y 1223 1287 F012 2 n y n/a 1389 F004 3 n y n/a 230 F042 4 y y 95 50

, F041 4(a) y y 95 50 F008 5 n n n/a n/a F011 6 n n n/a n/a F007 8 n n n/a n/a F059 9 y y 50 63 F001 I y n 1110 n/a F002 II y y 1110 1110 F003 III y y 1110 1110 F600 V n y n/a 1110 F021 .VI n y n/a 25 F075 VII n y n/a 40 F079 VIII n y n/a 40 F022 IX n y n/a 25 NEDC-31322 RCIC System Table 4 Valve # Valve #

F013 1 y y 1237 1277 F019 2 n y n/a 1317 F010 3 n y n/a 221 F029 4- y y 94 50-F031 4(a) y y 94 50 F022 5 n n n/a n/a F002 7 n n n/a n/a F012 8 n n n/a n/a F046 9 y y 306 60 F045 I y y 1110 1110

F007 II y y 1110 1110 F008 III y y 1110 1110 i

F001 VI n y n/a 25 F084 VII n y n/a 40 F062 VIII n y n/a 40 F059 X n n n/a n/a 1

. - - . . ... . . - . - - - - - - .