ML20210T536

From kanterella
Jump to navigation Jump to search
Forwards Addendum to Reactor Containment Bldg Integrated Leak Rate Test Conducted 860520-26.Investigation of Containment Deviations from As-Found Conditions
ML20210T536
Person / Time
Site: Mcguire
Issue date: 09/30/1986
From: Tucker H
DUKE POWER CO.
To: Harold Denton, Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML20210T541 List:
References
NUDOCS 8610090058
Download: ML20210T536 (1)


Text

... _ _

DUKE POWER GOMPANY P.O. HOX 33180 011AHLOTTE, N.G. 28242 IIAL H. TUCKER TELEPHONE (704) 373-4531 vsom Perssor*T NETLRAE PRODtfCTION September 30, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 ATTENTION:

Mr. B.J. Youngblood, Director PWR Project Directorate No. 4

Subject:

McGuire Nuclear Station, Unit 2 Docket No. 50-370 Reactor Building Integrated Leak Rate Test; Determination of As-found Leakage

Dear Mr. Denton:

Attached is an addendum to the Integrated Leak Rate Test (IRLT) Report which was transmitted by letter dated September 26, 1986.

In addition to supplementing the ILRT Report, this addendum provides the results of an investigation which was performed as a result of Inspections 50-369/86-16 and 50-370/86-16 (reference letter, H.B. Tucker to J.N. Grace, September 4,1986). If there are any questions, contact Duke through normal Licensing channels.

Very truly yours,

/

Hal B. Tucker l

SAG /34/jgm Attachment xc:

Dr. J. Nelson Grace, Regional Administrator U.S. Nuclear Regulatory Commission - Region II 101 Marietta Street, Suite 2900 Atlanta, Georgia 30323 i

Mr. W.T. Orders Senior Resident Inspector McGuire Nuclear Station

\\

0 0

moTo8sBEj!;o P