ML20210T321
| ML20210T321 | |
| Person / Time | |
|---|---|
| Site: | 07109151 |
| Issue date: | 10/02/1986 |
| From: | Macdonald C NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Poppe L CHEM-NUCLEAR SYSTEMS, INC. |
| References | |
| NUDOCS 8610080415 | |
| Download: ML20210T321 (2) | |
Text
_ _ _ _
.a 7 /- 9 /S/
n s_y% ;g A llQ N
% 02 3 I
FCTC:CEW 71-9151 Chem-Nuclear Systems, Inc.
ATTN: Mr. L. K. Poppe 220 Stoneridge Drive Columbia, SC 29210 Gentlemen:
This refers to your application dated June 9,1986, as supplemented September 5, 1986. requesting an amendment to the Model No. CNS 14-170, Series III package.
In connection with our review, we need the information identified in the enclosure to this letter.
Please advise us within 30 days from the date of this letter when this information will be provided. Additional infomation requested by this letter should be submitted in the form of revised pages.
If you have any questions regarding this matter, we would be pleased to meet with you and your staff.
Sincerely, orisinal sisma W
~~wn gyf r.
Charles E. MacDonald, Chief Transportation Certification Branch Division of Fuel Cycle and Material Safety, NMSS
Enclosure:
As stated Distribution: w/ encl Docket File NRC PDR CEWilliams RH0degaarden IE HQ Region (II)
NMSS R/F FCTC R/F A\\
E-
- FCTC P
- FCTC OFC: FCTC NAME:CEWilliams: alm
- RH0de aarden CE. cD n ld t
DATE:10bf/86
- 10/0 /86
b Chem-Nuclear Systems, Inc.
Model No. CNS 14-170, Series 111 Package Docket No. 71-9151 Encl to ltr dtd:0CTo 2 E86 Drawings 1.
On Drawing No. C-110-0-0017, Sheet 1, Rev. B, the 80-inch and 81-1/2-inch diameters are not compatible with the 7/8-inch plate thickness.
2.
The nominal shell diameters shown in Detail Item 3 and Item 4, Drawing No. C-110-D-0017, Sheet 2, Rev. B, are not compatible with the 1-3/4-inch nominal lead thickness.
Acceptance Test and Maintenance Program 1.
Paragraphs 4.1.2 and 4.2.2 cite nondestructive examination requirements which are different than those specified by the packaging drawings. This inconsistency should be corrected.
2.
The acceptance test program should address the load testing of the tie-down lugs as specified by drawing notes 7 and 10 on Drawing Nos.
C-110-D-0017, Rev. B and C-110-D-0018, Rev. B, respectively.
-