ML20210T287
| ML20210T287 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 08/28/1974 |
| From: | Oreilly P US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Parr O US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| CON-WNP-1347 NUDOCS 8605300016 | |
| Download: ML20210T287 (3) | |
Text
4 l
4 i
Docket Nos. STp50-508 i
and WIN 50-509 Olan D. Parr, Chief. Light Water Reactors Project Branch 1-3. L FORTHCONING SITE VISIT AND MEETING WITH WASHINGTON PUBLIC POWER SUPPLY SYSTEN.'wfRit' NUCLEAR PROJECTS NO. 3 Als NO. 5 Time and Date:
3:00 P. M. - September 3, 1974 8:30 A. M. - September 4,1974 8:30 A. M. - September 5,1974 Location:
WPPSS Nuclear Projects No. 3 and No. 5 site Satsop. Washington
Purpose:
Tour site and discuss questions related to geology (see attached agenda).
Participants:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM (G. Sorenson, D. T111 son) l WOODWARD-LUN'lGREN (Y. Lacroix)
WASHINGTON STATE GEOLOGICAL SURVD (W. Rau)
AEC - STAFF (D. Budge) l l
Original Signed by
)
Patrick D. O'Reilly Patrick D. O'Reilly l
Light Water Reactors Project Branch 1-3 l
Directorate of Licensing
Enclosure:
Agenda l,.
8605300016 740828
' o* *ic =
- L: LWR 1-3.
__ PDR ADOCK 05000508 A
PD0'Reilly:pga.
PDR,__
.o.m.
8/ /74 i
o.v.
foran AEC.)Is (Rev. 9 5 3) AECM 0240 W u. a oovananssar Paintime orricas ser4 ase.nes
5 AUG 2 81974-MEETING AGENDA I.
Geology 1.
Regional Physiography 2.
Regional Geology 3.
Regional Geologic Setting and Geologic Provinces 4.
Regional Geologic History 5.
Regional Geologic Profile 6.
Regional Tectonics and Structures 7.
Site Physiography 8.
Stratigraphy and Lithology 9.
Structural Geology, Site Locality
- 10. Geologic liaps
- 11. Site Geologic History
- 12. Plot Plans
- 13. Geologic Profiles
- 14. Plans and Profiles of Excavations and Backfill
- 15. Engineering Geology
- 16. Site Groundwater
- 17. Geophysical Investigations 3
f-Distribution:
Docket File F. Schroeder AEC PDR H. Denton Local PDR R. Maccary LWR l-3 Reading V. Stello LWR l-3 File R. Tedesco L Reading V. Benaroya E. G. Case C. Long A. Giambusso J. Kastner R. S. Boyd G. Lainas R. C. DeYoung D. Ross R. W. Klecker T. Ippolito D. Eisenhut S. Pawlicki R. Denise' J. Knight K. Goller L. Shao D. Muller B. Grimes D. Skovholt W. Gammill V. Moore R. Ballard W. Butler P. Fine D. Vassallo T. Novak K. Kniel M. Spangler A. Schwencer A. Kenneke J. Stolz R. F. Fraley, ACRS (16)
R. A. Clark S. Varga R. Ireland EP Project Manager -
R. Purple OGC D. Ziemann R0 (3)
P. Collins RS (3)
R. Vollmer V. Wilson W. Houston Receptionist, Bethesda G. Knighton P. D. O'Reilly G. Dicker D. Budge B. J. Youngblood W. H. Regan, Jr.
.