Docket Nos: 50-327 and 50-328 FEB 0 9 1987 LICENSEE:

Tennessee Valley Authority FACILITY:

Sequoyah Units 1 and 2

SUBJECT:

SufEARY OF PEETING TO DISCUSS CABLE PULLING Cn January 29, 1987, representatives of fiRC and TVA met to discuss the staff's January 15, 1987 letter regarding recomended actions for reso-lution of specific cable pulling concerns for Sequoyah. Enclosure 1 lists the attendees.

TVA asked several questions regarding the interpretation and scope of the recomended actions. The staff responded to these questions and requested that TVA fonnally document their interpretation and scope of the recomended actions as a result of the discussion.

Regarding the implementation of the recomended actions, the staff re-quested that the recommended cable tests associated with vertical cable supported by 90 condulets at Sequoyah 2 be completed prior to startup, and that the recomended modifications associated with cable supports for vertical cable below 90* condulets inside containment at Sequoyah 2 be completed prior to startup. Additionally, the staff requested that all other recomended tests / inspections in support of Sequoyah 2 cable installation, which may be done at Sequoyah 1 and/or Watts Bar 1 and 2, be performed prior to Sequoyah 2 startup.

TVA disagreed with the staff's request regarding implementation of the recomended actions prior to restart of Sequoyah 2.

The staff requested that TVA fonrally document their position regarding implementation.

TVA's position was discussed with our Senior Management Team. The Senior Management Team stated that they strongly supported the staff's recomen-dations that cable testing and support work should be completed prior to startup of Sequoyah 2.

A B.J. Youngblood, Director PWR Project Directorate #4 Division of PWR Licensing-A

Enclosure:

As stated cc: See next page

  • SEEPREVIQUSCCNCURRENCE

[

PWR#4ff4 EICSP,/0FWR-A PWfI /

-A TAlexich nac

  • FRosa BJi ntilood 02/q/87 02/05/87 02/

/7 8702180100 870209 DR ADOCK 05000327 p

PDR

7-q N-ENCLOSURE 1 NRC/TVA CABLE PULLING MEETING JANUARY 29,.1987 NAME ORGANIZATION T. Alexion NRC/PWR#4 F. Rosa NRC/EICSB' J. knight.

NRC/EICSB G. Toman Franklin Research Center W. A. Thue Consultant J. B. Gardner Consultant P. Gill NRC/EICSB B. Bryan -

TVA W. Raughley TVA Chief Electrical Engineer K. Petty Store and t!ebster Engineering Corporation T. Shea Stone and Webster Engineering Corooration M. Harding TVA Sequcyah T. Ippolito TVA Licensing C. Fox TVA ONP B. J. Youngbleed NPC/PWR#4 T. J. Kenyon NRC/PWR#4 R. Wessman NRC/TVAPS L

~

e Mr. S. A. White Tennessee Valley Authority Secuoyah Nuclear Plant i

cc:

Tennessee Department of Public Regieral Adrrinistrator, Region II Fealth U.S. Nuclear Regulatory Contissics,

ATTN: Director, Bureau of 101 l'.cnetta Street, N.W., Suite 2900 Environmental Health Services Atlanta, Georgia 30323 Cordell Hull Cuildfro Nashville, Tennessee' 37210 R. !!. Cantrell ATTN:

D. L. Williams Mr. Michael H. Mobley, Director Tennessee Valley Authority Division of Radiological Health 400 West Sumit Hill Drive, W12 A12 T.E.R.R.A. Building Knoxville, Tennessee 37902 150 9th Avenue Nerth Nashville, Tennesser ?7903 Mr. Bob Faas Westinghouse Electric Corp.

County Judge P.O. Box 355 Hamilton County Courthouse Pittsburgh, Pennsylvania 15230 Chattarcega, Tennessee 37402 R. L. Gridley Tennessee Valley Authority SN 1578 Lockcut rlace Chattanooga, Tennessee 37402-2801 ft. R. Harding Terr.essee Valley Authority Sequoyah Nuclear Plant P.O. Box 2000 Soody Daisy, Terressee 37379 Resident inspector /Sequoyah NPS c/o U.S. Nuclear Regulatory Consission 260C Igcu Ferry Road Soddy Daisy, Tennessee 37379 H. L. Abercrcrrtie Tennessee Valley Authority Sequoyah Nuclear Plant P. O. Box 2000 l

Soddy Daisy, Tennessee 37379 i

~

~

L l'

);..

k

,r

.r,..

~

,'/

,f

(! ' ' i

.E t1

. MEETING

SUMMARY

DISTRIBUTION-i

.,f

-FtH 0.'1987 1

,[@i@j[jj U NRC Participants NRC PDR T. Alexion L PDR' F. Rosa-NSIC-J.-Knight ~

PRC System P. Gill

)

PWR#4 Reading File B.iJ. Youngblood

~f Project Manager T. Alexion Ti.' J. Kenyon R.' Wessman

-J M. Duncan 3

=, -

OGC-Bethesda' J. Partlow

+

4 J. Holonich E. Jordan

'i B. Grimes ACRS (10)

H. Thompson, Jr.

H. Denton t

J. Taylor B. Hayes N. Grace S. A. Connelly-D. Muller l

T. Novak' '

K. Barr, Reg II G. Zech, Reg II C. Upright, Reg II W. Long B. K. Singh J. Thompson N. Thompson M. Reinhart K. Hooks L. Spessard TVA0G (3) S. Richardson AR 5029 OTHERS bec: Licensee fl Service List 4