%3 'Y November 29,1974 e4v 3,c,g, p g -
i W r N < & At..te
[
StadM A /-
- ua..~ n ;, e oht Note to:
Dan Muller
[
vDick DeYoung WPPSS 3 AND 5
'Dwayne P.enberger of WPPSS called to see if anything could be done to advance the LWA date for Units 3 and 5.
Since the revised schedu'e would call for issuance for an LWA coinc.ident with the monsoo.. season in Washington, I told him owing to changes in design
.-that the Company had made and the supplying of inadequate information valuable schedule time was lost.
In addition, I poisited out that
,we could not reschedule the Lab work immediately upon receiving the necessary information.
These things caused the slip and the time is probably irrevocably lost.
, -[
Notwithstanding all this, if it is possible to shave some of the '
time as the review process progresses, I would appreciate it if you would make an attempt to do so.
(I also told Renberger that he should pray for the preceding becoming uncontet.ted; that, in itself, would pick up a couple of months.)
Roger Boyd, A P
- Director Licensing t".
}
i 8605290672 741129 PDR ADOCK 05000508 L
PDR i
~
q O
^
M P
4',, 8d UNITED STATES
-i
. ATOMIC ENERGY COMMISSION
\\
WASHINGTON. D.C. 20$45 fd f f( 70 ' -
November 29, 1974
(-4 v 5,M Avr 5
WAY TC / A, N+,-g S Lif ed k't Q
.f-I A6Mr m d(.
i'l o nut
~
Note to:
Dan Muller Aick DeYoung
- l
\\
Wpp5S 3 AND 5
~
Dwayne Renberger of WPpSS called to see if anything could be done 7
to advance the LWA date for Units 3 and 5.
Since the revised schcdule would call for issuance for an LWA coincident with the monsoon season in Washington, I told him owing to changes in design that the Company had pade and the supplying of inadequate information valuable schedule time was lost.
In addition, I pointed out that I'
we could hot reschedule the Lab work immediately upon receiving the neceustry *;nformation. These things caused the slip and the time is probably irrevoegbly lost.
.o Natwithstimding all this, if it is possible to shave some of the
- time a3 tha review process progresses, I would appreciate ii. if you wot. tid make an attempt to do so.
(Ialso.toldRenbergerthat he shoilld pray foe the preceding becoming uncontested; that, in itself, would pick up a couple of months.)
RogerBdyd,A p
Directorg Licensing _