Discusses D Renberger 741129 Telcon Request to Advance LWA Date for Facilities.Valuable Schedule Time Lost Due to Changes in Design & Receipt of Inadequate Info
ML20210T055
Person / Time
Site: Satsop
Issue date: 11/29/1974
From: Boyd R
US ATOMIC ENERGY COMMISSION (AEC)
To: Deyoung R, Muller D
US ATOMIC ENERGY COMMISSION (AEC)
References
CON-WNP-1732 NUDOCS 8605290672
Download: ML20210T055 (2)


Text

.

.....~....-.._-.__...i-.-.

~

~

f.

.~

J,f UNITED ST TES p_

ATOMIC ENERGY COMMISSION

'A.6/4 (Q.

g w ensucro.v.n.c-as4s 746 y A-p

%3 'Y November 29,1974 e4v 3,c,g, p g -

i W r N < & At..te

[

StadM A /-

  • ua..~ n ;, e oht Note to:

Dan Muller

[

vDick DeYoung WPPSS 3 AND 5

'Dwayne P.enberger of WPPSS called to see if anything could be done to advance the LWA date for Units 3 and 5.

Since the revised schedu'e would call for issuance for an LWA coinc.ident with the monsoo.. season in Washington, I told him owing to changes in design

.-that the Company had made and the supplying of inadequate information valuable schedule time was lost.

In addition, I poisited out that

,we could not reschedule the Lab work immediately upon receiving the necessary information.

These things caused the slip and the time is probably irrevocably lost.

, -[

Notwithstanding all this, if it is possible to shave some of the '

time as the review process progresses, I would appreciate it if you would make an attempt to do so.

(I also told Renberger that he should pray for the preceding becoming uncontet.ted; that, in itself, would pick up a couple of months.)

Roger Boyd, A P

Director Licensing t".

}

i 8605290672 741129 PDR ADOCK 05000508 L

PDR i

~

q O

^

M P

4',, 8d UNITED STATES

-i

. ATOMIC ENERGY COMMISSION

\\

WASHINGTON. D.C. 20$45 fd f f( 70 ' -

November 29, 1974

(-4 v 5,M Avr 5

WAY TC / A, N+,-g S Lif ed k't Q

.f-I A6Mr m d(.

i'l o nut

~

Note to:

Dan Muller Aick DeYoung

l

\\

Wpp5S 3 AND 5

~

Dwayne Renberger of WPpSS called to see if anything could be done 7

to advance the LWA date for Units 3 and 5.

Since the revised schcdule would call for issuance for an LWA coincident with the monsoon season in Washington, I told him owing to changes in design that the Company had pade and the supplying of inadequate information valuable schedule time was lost.

In addition, I pointed out that I'

we could hot reschedule the Lab work immediately upon receiving the neceustry *;nformation. These things caused the slip and the time is probably irrevoegbly lost.

.o Natwithstimding all this, if it is possible to shave some of the

  • time a3 tha review process progresses, I would appreciate ii. if you wot. tid make an attempt to do so.

(Ialso.toldRenbergerthat he shoilld pray foe the preceding becoming uncontested; that, in itself, would pick up a couple of months.)

RogerBdyd,A p

Directorg Licensing _