ML20210S863
| ML20210S863 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 03/16/1976 |
| From: | Bournia A Office of Nuclear Reactor Regulation |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-1646 NUDOCS 8605290463 | |
| Download: ML20210S863 (3) | |
Text
6 o
4 lua., Wb t
DOCXEr POS Q 50.S AND STN 50-APitICANT: Washington Public Power Supply Systen, et al (WPPSS)
TACILITY:
Nuclear Projects Nos. 3 & 5 (WNP-3 and WNP-5)
SUM %RY OF ATNISOKI COMiITTEE ON REACIDR SAEGUARDS (ACPS) SU3CHETTE MECTING HELD O!! TEBRUARY 24, 197G On Febnary 24, 1976 the ACRS Subcorarittee net in Rieltland, Washington to consider the WPPSS construction permit application for WNP-3 and WNP-5. A list of atterdees is presented in the enclosure.
The IRC staff reported on the status of the staff review. The WPPSS application incorprutes, by reference, tre Canbustion Engineering Stanird Safety Aralysis Report (CESSAR) for which a Preliminary Design Approval was issued Decenbe*,1975., The.WNP-3 ard WNP-5 Safety Evaluation ReIort (SER) was issued on Th/ 13, 1976. There were eimt open itms indicated in the SER. Three of the open items required additional inforration fium the applicant ard five the staff received l
a611tinrul information and was reviewing.
The applicanth and their principal contructors provided presentations l
on the following subjectc:
(1) Organization, plant description and schedule.
(i) Ex:eptions taken to CESSAR (a) Changes made (b) Justification (3) General plant design and layout (4) Contairsent design (5) Safety-related systems design and la p ut (6) Auxiliary feedoter systems desim (7) 'icrntjo rissiles protection
,s' 8605290463 760316
{DR ADOCK 05000508 PDR C
e i
r 2-(8) Compliarce with CCSSAR Interface Requirenants (9) Offsite power (reliability)
(10) Appeniix I l
(11) rire protection (12) Industrial security At the oorclusion of the nesting the e_hittee chaiman stated that the subcomittee would I=-x-rd a full ACRS meeting on W!P-3 and WNP-5 on March 4,1976.
Anthony Bournia Light Wate Reactors Branch No. 3 Division,of Project Management Erclosure:
Atterdance list f
DPM: LWR #3
. Fries *
~
N IN summams p 3//6/76
=a,,,
Fores AFC 318 (Rev. 9-53) AIOf 0240 W u. 5. oovs amusm? Paintina orracar se>4.sne.ess
F
~
[
D EIBSUFI i
ATIENEW CE LIST ACRS SUBOOMMITIEC )ELTI!G i
i WASHDC'IDN PUBLIC POWER SUPPLY SYSIDi IAE1 EAR PRUDCIS ID. 3 & 10. 5 l
ITBRUAE 24, 1976 l
ACRS CGEUSTION DGI!EERING. DC.
C S. Bush (St W ittee Chairman)
E.S&amr Dr. Z. Zudans A. Tuzes Dr. J. C. Mark E. Gaenther I
i ACRS STAIT EBASCD SERVICES, DC.
i G. Quittschreiber R. Vickem A. Ross W. Rezar WASHDE'IDN PUBLIC POL 7ER SUPPLY SYS'IDI A. Wem G. Kent Dyekman G. Sorensen W. Nees NRC - STAIT F. Guyer A. Bournia R. Chitwood I. Villalva G. Godfmy R. Niklas I
B0!EVILLE POLER ADMDTISTR/JION W. liaig i
l I
l i
I
r 'e
- I ownesa w s h l
..rr
- Form AEC 318 (Rev. 9 53) AECM 0240 W u. s. novanmusut Pmmvene orrscss t.?4.sao tee
,