ML20210S843

From kanterella
Jump to navigation Jump to search
Notification of 750804 Meeting w/ACRS,WPPSS,EBASCO,C-E & Woodward-Clyde Assoc in Elma,Wa to Discuss site-related Items Concerning CP Application
ML20210S843
Person / Time
Site: Satsop
Issue date: 07/22/1975
From: Oreilly P
Office of Nuclear Reactor Regulation
To: Parr O
Office of Nuclear Reactor Regulation
References
CON-WNP-1690 NUDOCS 8605290454
Download: ML20210S843 (5)


Text

F b

JUL,2 21975 (S.n w-susN50-5028 Docket Nos.

and Olan D. Parr, Chief. Light Water Reactors Project Branch 1-3. DRL FORTHC0li!E ACRS SUBCOMMITTEE llEETIE - WPPSS NUCLEAR PROJECTS NO. 3 AND NO. 5 (CP)

Date and Time:

August 4,1975 9:15 A. M. - 5:00 P. H.

Location:

Proposed site of WPPSS Nuclear Projects No. 3 and flo. 5 Satsop. Washingten (0:15 A. H. - 12:00 Noon)

DaksRidgeCountry(1:00P.ft.-5:00P.ft.)

Club Elma Washington

Purpose:

Review of sito related items of application for a construction pemit.

Participants:

ACRS SUBCOP9t!TTEE

'(Dr. Bush (Chaiman). Dr. Okrent. Dr. Carbon)

ACRS STAFF TOTTuTttschreiber)

WASHINGTON PUBLIC POWER SUPPLY SYSTE!!

TD. Renberger, R. Chitwood G. SorenTen, et al) n, R. Vickers, et al)

COMBUSTION ENGINEERING. INC.

(E. Gunther)

WOODWARD-CLYDE ASSOC _I M TY.Tacsix, A. Patwardhan )

0605290454 750722 PDR ADOCK 05000D00 A

PDR a

JUL. 2 21975 2

NRC STAFF (O. Parr, P. O'Reilly. F. Kantor. C. Stepp.

J. Greeves. T. Johnson. D. Sudge)

Original Signed by Patrick D. O'Reilly Patrick D. O'Reilly Light Water Reactors Project Branch 1-3 Division of Reactor Licensing Attac % nt:

AgerWa RL:L g 3

.n....

P0'Rdn Ty pg 7/2/75 4.c ne o.e ni anoeon..

  • v........

.,"......" n.m

..*ea

r:

6 SCHEDUI.E A!.*D AGE :DA FOR SITE SIT AND SUCCu ITTEL I?CVIL2 Or LTPS 3 AND 5 - atctST 4.1975 OAKS RIDGU COU: TRY CLUB, EL'iA. WASill! GTON Estinated Approxir tc Presentation Tiue Ti: ?

,IS T Site Visit 9:15 a.n. - 12:::

r 12:00 noon - 1:

.3 Lunch I

SUT/C""1T!!E 'GETI :G_

l.0 Executive Session (Closed) 30 mins.

1:00 p.n.

?.0 ::er. ting with the ::RC Staf f and Applicant (0 pen) 2.1 Cc..itten Chairenn's Opcnir.y Remarks 5 mins.

1:30 p.n.

2.2 Report by the ::1:C Stati 15 rains.

1:35 p.n.

(Site Iklated items)

St..tus of fite review C ut r.it ndin:, Situ Relatt d Itt ns Staff Conctoriens 2.3 presentationn by Ap;Ilicent Intreduction and Geacral Dc6cription 10 minc.

2:00 p.m.

brief plant de:cription schedule Site Characteristics 60 mins.

2:15 p.m.

Denography 5(icnicity (Selection of the SSE) soil characteristics 6 hydrology noteorology slope ntability ? londslidos imserdw cer.sidered (o.g., transrortatien, industrial, military activities)

Ultinato livat Sink 15 minn.

3:45 p.m.

General Dcoertption of Dosign noteorolo;ical design basos Water Drainago 20 mins.

4:10 p.m.

Curface drainar,c connidorations cround water drainage system

?

2-Estinated Approxi.cta Presentatlen Tlee Tir c 3.0 Executive Session (Closed) 4:40 p.e.

4.0 ::aeting with the NRC Staff and Applicant 4:50 p.r..

Discust future c.ectings & agenda 5.0 Adjournment 5:00 p.m.

A A A A k p A i'i A A A A A A A A A A A A A A A A A A

1) A enxinue, of 30 minutes will be allowed for rceciving oral 6 tate ents frem m.mbers of the public. if requested.
2) l'he r.noakers al-culd 11rit tLeir prepared precentr.tiene to the ti.e allqk(-d.

An c.11miance, nmour.*.in; to appre:;ic ately 50:. of the presentation ti o, has been rade for quet.tioning by the Co :2ittee.

0

I t

i Distribution:

Docket Filab F. Schroeder NRC PDR R. Tedesco l

LWR 1-3 File V. Stello MLR Reading (M. Groff)

R. Maccary E. G. Case H. Denton B. C. Rusche V. Benaroya A. Giambusso G. Iainas R. S. Boyd J. Collins R. C. DeYoung D. Ross V. A. Itore T. Ippolito D. Skovholt J. Kni$ t D. Hiller S. Paw:,icki R. Denise L. Shao K. Goller B. Grimes R. W. Klecker W. Gaumill M. Williams R. Ballard l

W. Butler P. Fine l

J. Stolz T. Novak l

R. Clark M. Spangler D. Vassallo J. Kastner T. Spels ACRS (14)

K. Kniel S. Varga A. Sc!wencer Project Manager - P. O'Reilly R. Purple EP Project Manager - J. Norris D. Ziemann Attorney, E12 P. Collins IE (3)

G. Knighton SD (3)

G. Dicker V. H. WLison B. J. Youngblood Bethesda Receptionist W. II. Regan, Jr.

W. Besaw R. Vollmer P. Chen W. Ibuston F, Kantor G. Lear C. Stepp T. Johnsor.

J. Greeves D. Budge T. Murphy C. Liang J. Costello R. Satterfield F. Ashe

1. Sihweil R. Culp V. Goel R. Karnasiewicz P. Stoddart F. Cherney E. Brooks G. Manz M. Bolotsky L. Phillips l

D. Tibbitts l

l