ML20210S833
| ML20210S833 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 08/07/1975 |
| From: | Tedesco R Office of Nuclear Reactor Regulation |
| To: | Deyoung R Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-1687 NUDOCS 8605290435 | |
| Download: ML20210S833 (1) | |
Text
A
/h
<'b'c,-
AUG 7 1975 Docket Nos. 50-508/509 R. C. DeYoung, Assistant Director for Light Water Reactors, Group 1 RL INTRRFACE ON WASHINGTON NUCLEAR PROJECT, UNITS 3 AND 5 Flant Name: Washington Nuclear Project, Units 3 and 5 Licensing Stage: CP Docket Numbers: 50-508/509 Responsible Branch: LWR l-3 Froject Leader:
P. O'Reilly Description of Response: Review of laterface Requirements Raquested Completion Date: August 6,1975 Paview Status: Complete We have completed a review of interface requirements associated with CESSAR standard plant and the information supplied by the applicant in the PSAR for Washington Nuclear Project. Units 3 and 5.
We find the information complete in the PSAR and that there are no unrosolved interface areas or questions.
Oscr.d sir..ed by :
i: e4 :t I. ~!edsm9 Robert L. Tedesco, Assistant Director for Contain=mant Safety Division of Technical Review cc:
A. Giambusso W. Mcdonald S. Hanauer R. Heineman D. Eisenhut bec:/DocketFiles D. Muller NRR Reading File S. Varga CS Reading File J. Glynn ETSB Reading File J. Collins V. Moore O. Parr D. Allison P. O'Reilly W. Regan J. Norris M. Bell W. Burke P. Stoddart h
TR:ETSB/[~h TR:ETSB
- ET B ER:CS
.,,.e.,
illins RTedeM PStoddart:lw WBu
,o.,,e.,,,
0. l.?.5 0){fl5 llb 8).,
]5 Dan >
Foran ABC 310 (Rev. 9 55) AICM 0240 W u. s. oavsamessar paintiae oprices sete.eae-see 8605290435 750807 PDR ADOCK 05000508 A