ML20210S750

From kanterella
Jump to navigation Jump to search
Forwards Second Request for Addl Info Re CP Review.Review Covered Areas of PSAR Under Responsibility of Auxiliary & Power Conversion Sys Branch.Applicant Changed Sites & Added Identical Plant Since First Request for Info.W/O Encl
ML20210S750
Person / Time
Site: Washington Public Power Supply System
Issue date: 10/17/1974
From: Tedesco R
US ATOMIC ENERGY COMMISSION (AEC)
To: Moore V
US ATOMIC ENERGY COMMISSION (AEC)
References
CON-WNP-1438 NUDOCS 8605290385
Download: ML20210S750 (2)


Text

_____-__-____- _ _ _ - _ _ _

rt hgw(rY hW DIUh19'J"IO" October 17, 191&Ch*C I'I U

)

L r.cadinc L:CS L:/d'CSU Doexet dos. 53-4W

.W-513 Voss A. Hoore, Assis. cant Director for Light Water Psactort. Grou;> 2, L ltrQUI ST F0it ADDITIO;lAL r.*F0F,}4ATIO.4, AllXILIARY Nm P07JR C3' tdt 91:t; SYSTEMS DECh Pln,t 'tane: Washington Dublic Power Supply Systet: Nuclear Trojects.:o. 1 and..o. 4 (."."' - 1 nad 4)

Licensing r, tare:

O' tiock t :..a:. hora :

5't-4cc 5a--513 2naponrible Trrinch:

1/,'x 2-3 i roject Manaccr: Thoucs Cox Requested br.,,letion Date: October 11. 1974 The second-rotrui regtest for additional infornation for the conatruct Dm portdt revjw of the Washingtet. i'ullic IWcr t uply 'Jyoten !.uclasr Projects; ilo. I and 1:o. 4 (O - 1 and 4) le cuclesed. This revim.

covetrcd tl. ore arean of the M;T' - 1 and 4 Preliwinary Safety Analys te

}mport (M.AR) utica ar" the prinary responsibility of the Auxili.1rv auJ Iowcr Conversfou 8votons Branch.

Elrice the firnt-rouaJ. request for additional infornation, the cgplicart hoc chan,ged nites.vd added another identical plant (V.T - 4) to the original plant (k'dr - 1).

1.s a result of thcae chantee the syste;

'n-whici. the Atn:tlicry and " cur Conversion Cystem franch has primer' rc97,oasibility have uev desipts.

In s.nny systese the original fire:-

roun.1 requesta and responses do not apply to the new designs. It ia pon.;1ble tnat additional information raay La requested (if necesc.arv) after the response:. to this second-round rectuent are received.wd before we co:nplete a nafety evalustion report.

i motore L. Tedesco, Assistant Directer for Coutainawnt Safety Directorate of Licensing Diclosure:

8605290385 741017 As Stated PDR ADOCK 05000460 A

PDR o, ries

  • LCS:APCSB..

.. L :

CSE L:

  • e w

W.LeF ve 9WQ$W.

.Lo

(.. e e co.

-4of fi?f f 74 - -1of //-///74-4or//fr/74

~

r.

acm <s. sm acu em i

.~/ ~ '. ~

=c='"

~~~

+6 e

e i

Vesc..cori

' ce; (v/c encl.)

/.. Clas usse V. ticDonald (w/ encl.)

s. Hannuar P. Schroeder S. Var;;a
k. Elecker D. Eisenhut J. Carter J. Clynn A. Schwencur T. Cor C. Lm.g

'W. 14115VG e

s OFFtC S M SWANAGSE %

DATS$

pneum ABC 510 (Bav. 555) AKM M#

  • va es covemament pneutino oersead nova.eae.nes

,w, r

w

--