Summary of 741030 Meeting W/Util,United Engineers & Contractors & B&W to Discuss Electrical,Instrumentation & Control Sys Branch Draft Requests & Positions.Attendance List Encl
ML20210S727
Person / Time
Site: Washington Public Power Supply System
Issue date: 11/18/1974
From: Cox T
US ATOMIC ENERGY COMMISSION (AEC)
To:
US ATOMIC ENERGY COMMISSION (AEC)
References
CON-WNP-1435 NUDOCS 8605290376
Download: ML20210S727 (3)


Text

_ -_______-___ _ _ _ - _ _ _ - . _ . _ _ _

s

e ,

K SG *blj MOV 1 ! n DOC)IT NOS: 50-460 and 50-513 APPLICAVT: WASIIIM PUBLIC POWER SUPPLY by (WPPSS)

FACILI1Y: NASl!!M MJCLEAR GE AND RXE OSF-1, 4)

StBNUOf 0F EETING HPl210 DISCUSS IRAFf E12C1R1 CAL SY311NS RBQUEh'IS FOR INREMATI(N AND POSITIG6 On October 30, 1974, repusentatives of WPPSS, thited 51gineers and Constructors (IE4C), Babcock and Wilcox (34W) aund the Regulatory staff met in Bethesda, Maryland, to discuss the sut:jsct draft mquests aral positions prepared by the Electrical Instrtmentation and Contml Systatas Branch (EICSD). %e purpose of the discussion was to assure that the applicant understands the concerns of the staff and to hear preliair.ary responses to specific issues. An attenfance _ list is enclosed. A stuury of the meeting discussion follows:

Fifty draft requests and postions were discussed and six additioimi ones were presented to the applicant at the meeting. The draft material discussed is schedaled to be femally issued to the applicant by the staff on November 2q,1974, Sc>ver:d areas of disagreement between the staff and applicant surfaced during the discussions. One such area involyes the staff position mquiring applicant compliance with IEEE-32F1974. B4W stated that they would have to take exception to the aging nquinments of the nmt standard, and that they were attempting to schedule a generic meeting with the staff on this subject expected to take place in early Decenber 1974. Other staff positions to which the applicent felt they might take exception in their respmse were:

1) 1ho staff position that anfety niated instrunentation records shall be seismically qualified to accurately mcotti after (but not during) a seismic ovent.
2) 1ho staff position that fully automatic switc!wver frten the PICS injection ande to the recittulation mode saast be ymyided in conformance with IEEE 279-19 71. 34W believes that the WPPSS systan design pmvides for few enough nquind opentor actions and a long enough time period in which to accglish that  ;

switchwer, such that misquate system safety is prwided with /

nanual switching.

e.....

8605290376 741118 PDR A

ADOCK 05000460

,,,,,,,,,, PDR . _ . _

sats > --

Foim ALC Sit (Kee. 9 53) AFCM G240 # 4 e. e svasamene ram *see erresse esta.ese-see

I i

1 1

s .

l y- f WPPSS Hosting Summary -

2-l 1

3) The staff positian that periodic tests must be perfomed m each of the themal over1 bed devices prwided for safety related motor operated valves, umla== the therust overloed ,

protection is bypassed eder accident canditionse

4) h staff position regarding interlocks an core flood tank-isolation valves that requires automatic opening of the valves '

when reactor &oolant system pressure avrande a proselected level.

Stiginnt glgng tg Thomas Cam, Project knager Light Water Reactors Branch 2-3 Directorate of Licensing '

Enclosure:

Attet=nce List 6

?

I

.. rec e "

IMR 2-3 na,e w . . , .. - . . .

Foren AEC.518 t Rev. 9 51) AEOf 0240 W u e. novenaserne pas = vine wareses eesa.eae.ees

i

=-

,g

.a.

ATTENDANCE LIST MEETING WITH WASHINGTON PUBLIC POWER StJPPLY SYSTEM -

DOCKET NOS. 50-460 & 50-513 WASHINGTON NUCLEAR ONE AND FOUR f

OCTOBER 30. 1974 .

Atomic Energy Commission United Engineers & Contractors T. H. Cox J. R. Schmieder-R. A. Scarano ,

A. J. Friedmen gppgg J. G. Kritikson J. A. Cannon {

"* ##I N. S. Porter E. P. Rothong J. P. Thomas L. Bilk G. L. Waldkoetter A. G. Healer 9

B&W D. C. Winterich A. F. McBride +

R. J. Brockman E. S. Patterson K. e. Suhrke  :

J. E. Piioletti I

i

?

l t

i 1

9-t e

h0V 5 G4 Docket Nos.

  • 50-460 50-513 )

SIN 50-508

S1N 50-509 Olan D. Parr, Chief, Light Water Reactors Project Branch 1-3, L NOTICE OF MITTING WIT 11 D. FINN, P011NTIAL INERVENOR IN WPPSS MX1 EAR PRfUBCTS NOS.14 4 AND 3 6 5 PROCEEDINGS Time 6 Date: 2:00 p.m. - November 14, 1974 location: Room 4211 44 Montgomery Street San Francisco, California

Purpose:

Informal discussion of isst.es of mutual interest regarding the construction permit applications for WPPSS Nuclear Projects Nos.1, 4, 3 and 5.

Participants. PETITICNER (D. F. X. Finn)

USAEC - R M f1A10RY STAFF (T. H. Coot, R. H. Calp, P. D. O'Reilly, W. H. Regan, Jr., A. Schwencer)

Cri;'ir! E' ped by P:' ,

~9c 't:y Patrick D. O'Reilly Light Water Reactors Project Brmch 1-3 Directorate of Licensing cc: see attached list WuhOf f ff _ & -( j $$ ~ ,il1_

vw%

o,,.s. b L:IM.

0-

....e. IOO'Rei y;c] s

. . . . , ll/I /74 _

Forts AK$tn (Raf. 9 $7l MCM 0110 W u. s. oovannestat Pamtsme erricas tees.ese teo