n-U0CKd! hin
~
,/
Jah i ? P' t-Docket Nos. 50-460/513,'
Y. A. Moore, Assistant Director for LWR-2, L RESPONSE TO STANDARD REVIEW ASSIGNMENT, NUCLEAR PROJECT NO. 1, (WNP1&4),REVIEWOFPSARCHAPTERS13&14 Applicant: Washington Public Power Supply System Licensing Stage: CP Branch & LPil Requesting Assistance: LWR 2-3. T. Cox Review Branch Involved: L:IS&EP Review Status: SER input complete The attached report contains further revised draft input to Section 13.1 of our input for the Safety Evaluation Report relative to our review of the subject SAR. This revision reflects the recent reorganization of WPPSS submitted in Jaendment 14 of January 9,1975.
t; -Y Emed by.
Dc:n.id J. novholt Donald J. Skovholt Assistant Director for Quality Assurance and Operations Division of Reactor Licensing
Enclosure:
Revised draft input for SEk cc:
A. Giambusso W. Mcdonald R. Houston A. Schwencer T. Cox C. Van Nielll v 8605290353 750122 PDR ADOCK 05000460 E PDR l DISTRIBUTION: Docket,(2), IS&EP Rdg., DJSkovholt L:IS&EP L:IS&EP L:AD:QA&O CRVanNiel:1d Me!P~ DJSkovhoi..t _ 1/21/75 1/ /75 1/ /75 l Form AIC Ste (Rev. 9-55) AECM 0240 W u. s. oovenmusw? Paintene orricas sers.sas sos I l
r Draft Ir.put to Safety Evaluation Report ' s (!uclear Project Hos.1, & 4 Docket Hos. 50-460/513 13.0 Conduct of Operations 13.1 Organization and Qualifications.- The Washington Public Po.;er Supply System has the responsibility for plant design, construction, quality assurance, testing and operation of fluclear Project lics.154.'The Plant Superintendent is responsible for all operational activities of the plant including: surveillance of operational compatibility during design, construction and preparation of test procedures; staffing, training, licensing, and adainistration of personnel; operation and riaintenant.e of the plant and ccmpliar.ce with all operating standards and regulations, lie reports thru the !!anagei, 'O'p'erEtions ' Division, to the Managing Director of the ~ ~ Washington Public Pouer Supply Sy' stem. The station staff, for both plants, as proposed by the applicant, consists of approximately twenty-four supervisory personnel supported by engireers, mechanics, technicians, and operators. Reporting to the Superintendent 'through an Assistant Superintendent are the Maintenance Supervisor, Senior Operations Supervisor, Technical Supervisor, and the Health Physics - Chemistry Supervisor. Under the Technical Supervisor are the Electrical . Engineer, fluclear Engineer, Performance Engineer, and Instrument and Controls Lagineer. Reporting to the Health Physics - Chemistry Supervisor are the Health Physics Supervisor and the Chemistry Supervisor. Reporting to the Senior Operations Supervisor will be the Operations Supervisor of WNP-1 and the Operations Supervisor of WilP-4. a e t M 6 w--
o_ The normal operatin9 shif t for eitherplant mnsists of '91if t Supervisor who.will hold a Senior Reactor Operator license, a Senior Control - Operator and a Control Operator, each of whom will hold a Reactor Operator license, plus three equipment operators. In addition, a Health Physics Technician uill be. assigned to each shif t. The applicant has stated that' the qualification requirements of the station personnel will r.cet the requirements of American flational Standard, A:ISI !!18.1-1971, Selection and Training of Nuclear Power Plant Personnel, of Itarch 8,1971. Offsite technical suppor't for design,' construction and o;)eration is provided by-the Washington Public Power Supply System. Reporting to the fianaging Director are the Managers of the Operations Division, Technical Division, Projects Division, and Construction Division. Technical support is also obtained from various independent consulting firms and individuals,. including'A. D. Stanley & Associates, Shannon and llilson, Inc., Weston Georhysical Research,'Inc., Pacific florthwest -Laboratories, and S.11. Stoller Corporation. The llanager, Projects Division, is responsible for the performance of projcct management which is organized for the design, construction and startup testing of new electrical generating facilities. Reporting to the flanager is the Projects Service Manager and the Project flanager for Nuclear Project Hos. 1 & 4. The Projects Service fianager is responsible for providing tite schedule, cost analysis, and other support services required for each project. The Project ftanager for Nuclear Project ed - eb _ S g = en. L
s i; . Flos.1. & 4 has a staff which'is divided into four functional areas headed.by a Project Administrator, License Engineer, Supervisory Engineer, and Quality Assurance Manager. 7 t!e conclude that the organiz.=tional structure and.the qualifications . of; the' staff of tiuclear Project !!os.1 and 4 are sufficient to provide ~. acceptable staff and technical support for the operation of the plant. O-0 + b 4 O ' E. eme-
- e, e