ML20210S667

From kanterella
Jump to navigation Jump to search
Forwards IE Statement Re Assessment & Conclusions Concerning Implementation of QA Program for Use in Ser.Qa Program PSAR Commitments Sufficient to Warrant Commencement of safety- Related Const
ML20210S667
Person / Time
Site: Washington Public Power Supply System
Issue date: 03/20/1975
From: Jennifer Davis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Giambusso A
Office of Nuclear Reactor Regulation
References
CON-WNP-1428 NUDOCS 8605290348
Download: ML20210S667 (2)


Text

,

UNITED STATES ) .

NUCLE AR REGULATORY COMMISSION W ASHINGTON, D. C. 205S5 MAR 2 01975 A. Giambusso, Director Division of Reactor Licensing Office of Nuclear Reactor Regulation IE Su= mary SER Statement Washington Public Power Supply System (WP-1&-4)

Docket Nos. 50-460 & 50-513.

2nclosed is a statement prepared by the Office of Inspection and Enforcement for use in the Safety Evaluation Report regarding our assessment and conclusions ralating to implementation of the QA Program for this project.

Y .

on . Davis eputy Director for Field Operations OfI h e f Ia>;v.Li<

and Enforcement cc: w/ encl R. H. Engleken, IE:V D. J. Skovholt, RL R. L. DeYoung, RL R. H. Vollmer, RL

0. D. Parr, RL T. H. Cox, EL ipo*o~o,1 E 2

% '/ 198/

76 8605290348 750320 PDR i

E ADOCK 05000460 ppg -

r W.H% k U 1:4 J a

! NAR z 01975 )

IE SU r.ARY SER POSITION STATEMENT IMPLEMENTATION OF THE WNP UNITS 1 & 4 QA PROGRAM DOCKET NOS. 50-460 & 50-513 ASSESSMENT The Office of Inspection and Enforcement has conducted inspections to examine the implementation of the 102 Units 1 and 4 QA Program to ascertain its conformance with related 10 CFR 50, Appendix B, PSAR

. commitments. Our examinations encompassed the organization of the Applicant and the QA audit, review and approval functions of the Applicant for those major contractors selected to date. These examinations focused on quality assurance activities related to the design, procurement and construction of the nuclear power plants and included a review of established procedures and instructions and the execution of applicable provisions contained therein.

Our assessment includes consideration of the results of the above inspection activities and of the Applicant / contractor actions leading to the resolution of identified deficiencies, or delays in timely establishment and procedures and instructions, as necessary, to arrive at effective implementation of PSAR QA commitments. Based thereon, the Office of Inspection and Enforcement has determined that there are no substantive unresolved issues relating to the i=plementation of the QA program which require further identification and tollowup ar this cime.

CONCLUSIONS Based on the above assessment, the Office of Inspection and Enforcement concludes that the implementation of WNP Units 1 and 4 QA program PSAR commitments is consistent with the status of the nuclear project and is sufficient to warrant the commencement of safety related construction as would be authorized under the requested Limited Work Authorization II.

5 l