ML20210S600
| ML20210S600 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom, Limerick |
| Issue date: | 08/27/1997 |
| From: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9709110187 | |
| Download: ML20210S600 (16) | |
Text
_---______ ___--____ _ _ -
sttion support n portment 10CFR26.71(d) 5 PECO NUCLEAR r
nco m, c-,
905 Cimtettsook Boulevard A Unit of PECO Energy wayne. PA 19 % 7 5691 August 27,1997 Docket Nos.63-277 50-278 50-352 50-353 1
License Nos. DPR-44 l
>I NPF-3'
. NPF-;
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20055 -
SUBJECT:
Peach Bottom Atomic Power Station, Units 2 and ?
Limerick Generating Station, Units 1 and 2 Fitness-in;-Duty Program Performance Data for the Period January 1997 through June 1997 Gentlemen:
As required by 10CFR26.71(d), this letter submits the performance data for PECO Energy's Fitness-for Duty (FFD) Program for the period January 1997 through June 1997, lhe data for our Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, and Limerick Generating Station (LGS), Units 1 and 2, sites are provided in Attachments 1 and 2. Data for our Corporate Office and Nuclear Group (PECO Nuclear) Headquarters specimen collection sites fi.e.,2301 Market Street, Philadelphia, PA, and 965 Chesterbrook Boulevard, Wayne, PA, respectively) are provided in.
The data are reported on the January 1992 revision of the FFD Performance Data form provided by the Nuclear Energy Institute (NEI), formerly the Nuclear Management and Resources Council (NUMARC), and include the following.
Drugs tested for and cut-offlevels.
Workforce popJiation tested.
Numbers of tests and results by populatica ind type of test (i.e, pre-access, for-I cause, ranriom, follow-up, and other types of tests).
Substances ide itified, i
9709110187 9700275
/
PDR ADOCK 05000277 f'f)/
R PDR.
hf$f i,
August 27,1997 Page 2 Attachments 1,2, and 3 also include the following.
A summary of management actions.
Analysis of the data and appropriate actions that have been taken.
Random testing rate.
During this period, there were no significant events reported to the NRC in accordance with 10CFR26.73.
If you have any quest,ons or require additional information, please contact us.
Very truly yours, i
o l
G. A. Hunger, Jr.,
Director-Licensing Attachments H. J. Miller, Administrator, Region I, USNRC (w/ attachments) cc:
W. L. Schmidt, USNRC Senior Resident inspector, PBAPS (w/ attachments)
N. S. Perry, USNRC Senior Resident inspector, LGS (w/ attachments) l
o
- 1,.
a :-
l ATTACHMENT 1 Peach Bottom Atomic Power Station Units 2 and 3 Fitness-for-Duty Performance Data January 1997 through. lune 1997 i
i
Summary of Data Analysis and Management Actions Peach Bottom Atomic Power Station January-June 1997 1.
Initiatives TAK00
- The following summarizes the results of sweeps conducted during the period by PECO Energy Company's drug sniffing canine teams as well as investigations and interviews used to confirm information about Illicit activities at Peach Bottom Atomic Power Station (PBAPS),
January 30,1997 - General team sweep of warehouse building,2~8 floor, Nuclear a.
_ Maintenance Division. Results: Eight (8) activation's. No drugs found or forensic samples
- taken, b.
February 19,1997 - General team sweep of North Substation and Hydrogen Storage Tanks Laydown Area. Results: Five (5) activation's. No drugs found or forensic samples -
[
l taken.
May 21,1997 - General team sweep of warehouse building,2d floor, Nuclear c.
Maintenance Division. Results: Five (5) activation's. No drugs found or forensic samples taken.
11.
Manaoement 4.:tions During the period, five (5) contractor employees (all pre-access) tested positive at PBAPS.
Unescorted access was denied the five (5) contractor employees.
111.
Events Pecoried Under 10 CFR 26.73 There were no significant FFD events reported by PBAPS during the period.
IV.
Audits /Insoections No audits or inspections were conducted during the period.
V.
Random Testino Rate PECO Energy maintains separate testin0 " pools" for emoloyees and contractors. Random testing.
is conducted at an annualized rate of SOE The " average number with unescorted access" i
includes personnel granted unescorted access at both PBAPS and LGS.
- VI.
Additionalinformation i
Actions Taken based uno i psopfirmed On-site Screenino PECO Energy has elected to temporarily suspend access for individuals as permitted by 10 CFR
- 26.24(d).
During the previous 6-month reporting period (i.e.,' July - December 1996),100 percent of the
- specimens which were presumptive positive for cocaine as a result of preliminary on-site screening tests were subsequently reported as positive by the HHS-certified laboratory. The confirmation rate for marijuana was 89.3%
During the reporting period January - June 1997, six (6) specimens were reported as presumptive positive for cocaine as a result of on-site screening at the Peach Bottom Atomic Power Station and the Limerick Generating Station. Five (5) of those specimens screened positive and were confirmed as positive by the HHS-certified laboratory. The MRO verified the five (5) specimens as positive. Of the six (6) specimens identified as presumptive positive for cocaine, one (1) was collected from an individual with unescorted access. The individual was temporarily suspended pending the confirmatory testing and MRC /erification process. The specimen was subsequently confirmed and verified as positive. The individuals unescorted access was denied.
During reporting period January - June 1997, seventeen (17) specimens were reported as presumptive positive for marijuana as a result of on-site screening at the Peach Bottom Atomic Power Station and the Limerick Generating Station. Ten (10) of those specimens screened positive and were confirmed as positive by the HHS-certified laboratory. The MRO verified the ten (10) specimens as positive. No action was taken based upon an unconfirmed presumptive positive for marijuana since all seventeen (17) specimens were collected for pre-access testing.
Reduced Marijuana Cut-off Level During the period, there were two (2) confirmed positive tests for marijuana at PBAPS. It is estimated that only one (1) of the specimens would have tested positive using the 100 ng/ml immunoassay cut-off level.
Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 PECO ENERGY COMPANY JUNE 30, 1997 ComovY s Lber4 Endes PEACH BOTTOM ATOMIC POWER STATION Loaton DAVID M. SARI,EY (215) 841-5703 Contac Hune Phone Onctuoe eea case)
Cutetts: ScreerVConfirmation (ng'ml)
Q Apper. dix A to 10CFR 26 Marijuana 50 / 15 Amphetamines 1000
/ 500
/
Cocaine 300 /150 Phencyclidine 25
/ 25
/
Oplates 300 /300 Alcohol (% BAC) 0.04
/
^
j Long-Term Short-Term Testing Results Ucensee Employees Contractor Personnel Contractor Personnel
~
Average Number witt-Unescorted Access 2234 1292 Categories Tested Positive Tested Positive Tested Positive Pre-Access 44 0
199 5
[
Post accident 4
0 3
0 9
h Obsened behavior 3
0 0
0 Random 240 0
139 0
Follow up 21 0
11 0
Other 3
0 0
0 Total 315 0
352 5
REv.1/92 j
l I l'l j!)illl j) m.
A
-- 6 4
m
.5 O
h 4
! l 3_
2 1
lat s s e uT o
1
.1 f
4 e o l
t F
?o s
h e
o
. o 2
. 2 c
c l
n A
a ts
-ye b
c n e
u ni
. 0 0
ed o
e
~
S.
h 5 Pc c
if i
s c
e e e
h n pi o
0 p
mm 0,
S Af a e
r O
O o
O f
s O
e s
a o
0 t
t l
. 0 s
p e
O T
e e
v n
e a.
i ia t
c o
1 1
i o
s C
oP an d
au e
ir 2
o 2
j m
a r
M ifno s
s.
r r
C s
o o
t e
tc c
f e
a a
o y
r r
o t
t n
n n
lp o
o w
m C
C E
o m
m e
r r
d e
e e
k s
T-T-
a n
g r
t l
e e
n o
a c
t o
h o
f r
iL L
S T
B
i+.,.
,I
-]
1.
- ATTACHMENT 2 -
Limerick Generating Station 4
. Units 1 and 2--
Fitness-for-Duty Performance Data January 1997 thrergh June 1997 ~
Summary of Data Analysis and Management Actions Limerick Generating Station January-June 1997 1.
Initiatives Taken The following summarizes the results of sweeps conducted during the period by PECO Energy Company's drug sniffing canine teams as well as investigations and interviews used to confirm information about illicit activities at Limerick Generating Station (LGS).
January 15,1997 - General team sweep of the Personnel Processing Center. Results:
a.
One (1) activation. No drugs found or forenslc samples taken.
b.
January 15,1997 - General team sweep w.d for cause search of Site Services Building.
Results: One (1) activation. No drugs found or forensic samples taken.
January 21,1997 - General team sweep of the Facilities Building. Results: Fourteen c.
(14) activation's. Two unidentified pills were found. Laboratory analysis indicated the pills were not controlled substances.
d.
January 21,1997 - General team sweep of the Personnel Processing Center. Results:
No activation's.
l l
e.
January 27,1997 - Security investigation into allegation that a contractor employee l
involved in pre-access processing smelled of alcohol. Contractor admitted heavy use of alcohol the previous night. For cause test results indicated alcohol level below.04%. The t
contractor employee was counseled regarding the heavy consumption of alcohol while off duty.
f.
January 28,1997 - General team sweep of the Personnel Processing Center. Results:
No activation's.
O.
March 12,1997 - General team sweep of the River Pump House. Results: No activation's.
h.
June 05,1997 - General team sweep of the Technical Support Center and 35 floor of the Kemper Building. Results: Six (6) activation's. No drugs found or forensic samples taken.
i.
June 09,1997 - Unrelated security investigation elicited information from contractor employee of recent drug use. The contractor employee was denied unescorted
- access, 11.
Manacement Actions During the period, eighteen (18) contractor employees (i.e., sixteen (16) pre-access, one (1) random, and one (1) for cause) tested positive at LGS. Unescorted access was denied the eighteen (18) contractor employees.
One (1) applicant for PECO employment requiring unescorted access tested pos,itive. Unescorted access was denied and the applicant was not hired.
Ilh,
Events Reoorted Under 10 cER 26.73 During the period there were no significant FFD events reported by telephone under 10 CFR 26.73 by LGS.
IV.
Audits /Insoections No audits or inspections were conducted during the period.
V.
Random Testing Rate PECO Energy maintains separate testing " pools" for employees and contractors. Random testing is conducted at an annualized rate of 50% The ' average number with unescorted access" includes personnel granted unescorted access at both PBAPS and LGS.
VI.
Additional information Actions Taken based uoon Unconfirmed On-site Screening PECO Energy has elected to temporarily suspend access for individuals as permitted by 10 CFR i
26.24(d),
During the previous 6-month reporting period (i.e., July December 1996),100 percent of the specimens which were presumptive positive for cocaine as a result of preliminary on-site screening tests were subsequently reported as positive by the HHS-certified laboratory. The confirmation rate for marijuana was 89.3%
During the reporting period Januaru - June 1997, six (6) specimens were reported as presumptive positive for cocaine as a result of on-site screening at the Peach Bottom Atomic Power Station and the Limerick Generating Station. Five (5) of those specimens screened positive and were confirmed as positive by the EHS-certified laboratory. T' 9 MRO verified the five (5) specimens as positive. Of the six (6) specimens identified as presumptive positive for cocaine, one (1) was collected from an individual with unescorted access. The individual was temporarily suspended pending the confirmatory testing and MRO verification process. The specimen was subsequently confirmed and verified as positive. The individuals unescorted access was denied.
During reporting period January - June 1997, seventeen (17) specimens were reported as presumptive positive for marijuana as a result of on-site screening at the Peach Bottom Atomic Power Station and the Limerick Generating Station. Ten (10) of those specimens screened positive and were confirmed as positive by the HHS-certified laboratory. The MRO verified the ten (10) specimens as positive. No action was taken based upon an unconfirmed presumptive positive for marijuana since all seventeen (17) specimens were collected for pre-access testing.
Reduced Marijuana Cut-off Level During the period, nine (9) specimens confirmed positive for marijuana at LGS. It is estimated that only three (3) of the nine (9) specimens would have tested positive using the 100 ng/mi immunoassay cut-off level.
Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 PECO ENERGY COMPANY JUNE 30, 1997 Camp 47 4 Wnins Endog LIMERICK GENERATING STATION Locaton DAVID M. SARLEY (215) 841-5703 Contac: Name Phone (inctuce area code)
Cutetts: Screen / Confirmation (ng/ml)
O Appendix A to 10CFR 26 Marijuana 50 / 15 Amphetamines 1000 / 500-
{_
Cocalne; 300 / 150 Phencyctidine 25 / 25 N
/
/
Opiates 300 / 300 Alcohol (% BAC) 0.04
/
Testing Results Long-Term Short-Term Ucensee Employees Contractor Personnel Contractor Personnel Average Number witt-Unescorted Access 2234 1292 4
Categories
. Tested Positive Tested Positive Tested Positive Pre-Access -
98 1
1349 16 h
Post accident 15 0
o 15 0
h ObseNed behavior -
3 0
3-1 Random 250 0
166 1
Follow up 28 0
21 0
Other 9
o-
-12 0
Total 403 1
1566 18 REV.1/92-
)
e g,
e s
O N
2#
0 O
O C
.C.
11 2
0 ii y
y e
o o
C b
.E bc Ji jj
=
=
o O
C
'O EE Y
'f C
g Cf]
<S 6
O e
4 e
b 5
o e
o g
g s
S
.E 3
9 o
8 o
u c
E y
{
o e
m 2
C Co E
U E
s.
e e
0 E
i
?
p-e o
a 5I $
8 M 19 5
F h
@5 3
3 m
I
-3 ATTACHMENT 3 Corporate and Nuclear Group (PECO Nuclear) Headquarters Fitness-for-Duty Performance Data January-1997 through June 1997 r
Summary of Data Analysis and Management Actions Corporate and Nuclear Group (PECO Nuclear) Headquarters January - June 1997 1.
Initiatives Taken No sweeps were conducted during the period by PECO Energy Company's drug sniffing canine teams at the Corporate or Nuclear Group (PECO Nuclear) Headquarters.
II.
Manacement Actions During the period, two (2) contractor employees (both on random tests) tested positive on specimens collected at Corporate Headquarters. Unescorted access was di,aled the contractor employees.
Ill.
Events Reported Under 10 CFR 26.73 There were no events reported during the period.
IV.
Audits / Inspections No audits or inspections were corducted during the period.
V.
Han_ dom Testina Rate PECO Energy maintains separate testing " pools" for employees and contractors. Random testing is conducted at an annualized rate of 50%. The " average number with unescorted access" includes personnel granted unescorted access at both PBAPS and LGS.
VI.
Additionalinformation Actions Taken based upon Unconfirmed On-site Screenino Specimens collected at the Corporate and Nuclear Group (PECO Nuclear) Headquarters are forwarded directly to the HHS-certified laboratory for testing. On-site screening is not conducted.
Reduced Marijuana Cut-off Level During the period, two (2) specimens collected at the Corporate Headquarters confirmed posi+dve for marijuana. It is estimated that neither of the two (2) specimens would have tested positive using the 100 ng/ml immunoassay cut-off level.
Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26
~
PECO ENERGY COMPANY JUNE 30, 1997 C e sany a uones Ending CORPORATE AND NUCLEAR GROUP HEADQUARTERS tocanon DAVID M. SARLEY (215) 841-5703 Conue Nvne Pnone (Ircuee area cede)
Cutetts: Screen /Confirmatio n (ng/ml)
O Appendix A to 10CFR 26
- Marijuana 50 /- 15 Amphetamines 1000
/ 500
/
Cocaine 300 150 Phencyclidine 25
/ 25
/
Opiates 300 / 300 Alcohol (% BAC) 0.04
/
Testing Results Long-Term Short-Term Ucensee Employees Contractor Personnel Contractor Personnel Average Number witt' 2234 1292 Unescorted Access t#
Categories Tested Positive Tested '
Positive Tested Positive -
Pre-Access 7-0 3
0 k
Post accident 1
0 0
0
'9 h --
Obse:ved behavior 0
0 0
0 Random _
73 0
20 2
' Follow;up 7
0-0 0
Other.
2 0
7 0
Total 90 0
30 2
9 REV.1/92 4
)
1
- jl\\i i!l Il!l1 ll!
,l 9
A 2
4 i 5
T e
9 4
3 2
1 lats s e uT f
0 O
0 e o Rt
. lo
's h
e.
o c
c 0
O 0
l n
A a
t.s
-ye b
sn u.
wiid 0
O 0
e S..
ic l
F c.
i f
i
- s c
e e p.
iv n e.
fi 0
0 0
im r
i S.
Af a r
e O
o..
e f.
s e
4 s.
a 0
0 0
t t.
i s.
p e.
O T.
e s,
v i.
di t
c 0
0 0
i o
c C
c, P,
an d.
a e.
u
'2 j
0 2
m ira r
M ifn.
o s
s r
r C
s o
o t
t e
c c
f e
a a
o y
r r
t t
n lo n
n p
o o
w m
C C
E n
m o.
r d.
e r
r e
e e
k s
T-T-
a n
g t
e.
e n
o l
r a
c t
o h
o r
U L
S T
B
_