ML20210S455
| ML20210S455 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 09/02/1997 |
| From: | Langenbach J GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20210S460 | List: |
| References | |
| 6710-97-2370, NUDOCS 9709100226 | |
| Download: ML20210S455 (1) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ - - _ _ _ _ _ _ _ _ _ _ _
l GPU Nutte st. int.
(
Route 441 South i
NUCLEAR Post Office Boa 480 Middistown. PA l'057-0'80 Tel f tf 444-7621 (717)948-800$
4 6710 97 2370 September 02, 1997 U.S. Nuclear RegulatoryCommission Attn: DocumentControlDesk Washington,DC 20555 Gentlemen:
Subject:
Three Mile Island Nuclear Station, Unit 1 (TMI 1) i OperatingLicenseNo.DPR 50 Docket No. 50 289 Cycle 11 Core Operating Limits Report, Revision 2 Pursuant to TMI l Technical Specification Section 6.9.5.4, enclosed is a copy of the Cycle 11 Core Operating Limits Report (COLR), Revision 2. 'the Cycle 11 COLR, Revision 2, provides the cycle-specine limits established to support operation of Cycle 11 up to 690 Effective Full Power Days (EFPD) and provides an updated list of references. The cycle-specific core operating limits contained in these reports have been determined in accordance with Technical Specification 6.9.5.
If additionalinformationis required, please contact us.
Sincerely, ok
/
W James W. Langenba Vice President and Director,TMl-JWL/DJD
\\
Encl. TM1 1 Cycle 11 Core Operating Limits Report, Topical Report 101 Revision 2 P
Cc:
Administrator, Region 1 TMI SeniorResidentInspector TMI l Senior Project Manager 9709100226 970902" PDR ADOCK 05000299 l,l,l{ k!lfl$kh P
_