Provides Notification in Writing of Completion of Four Actions Addressed in CAL 1-97-08.Actions One & Two, Documented in .Actions Three & Four,Completed by 970701
ML20210R948
Person / Time
Site: Crane Constellation icon.png
Issue date: 07/21/1997
From: Langenbach J
GENERAL PUBLIC UTILITIES CORP.
To: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20210R935 List:
References
6710-97-2330, CAL-1-97-08, CAL-1-97-8, NUDOCS 9709040190
Download: ML20210R948 (1)


Text

_

4 L

l g

GPU Nucleer. Inc.

uuctsen Route 441 south 0;'l,"L';g,o,s,,,,

toim444 nn 6710-97 2330 July 21, 1997 Mr. Hubert J. Miller USNRC Region i Aeministrator 475 Allendale Road King of Prussia, PA 19406 1415

Subject:

Three Mile Island Nuclear Station, Unit I (TMI 1)

DPR 50/ Docket No. 50 289 Completion Response to Confirmatory Action Letter 197-008 Actions 4

Regard!r.g the Classification of Selected Plant Components at TMI-l

Dear Mr. Miller:

The purpose of this letter is to provide notification in wdting of the completion of the four actions

- addressed in Confirmatory Action Letter (CAL) 1-97-008. Actions one and two, which included initiation ofimmediate corrective actions and a determination of the impact of the equipment classification downgrade program, were documented in a GPUN letter to the Regional Administrator, NRC Region I, dated April 30,1997.

Actions three and four, performance of an assessment of the equipment classification downgrading process and a determination of what assessments and changes to other engineering processes are needed, were completed by July 1 1997 A management meeting with Region I staff was held on July 16,1997, dunng which we discussed our evaluation of the assessment.

Sincerely, ames W. Langenb h Vice President and Director, TMI AWM cc:

Document Control Desk TM1 Senior Resi, dent inspector TMI Senior Project Manager File 97047 9709040190 970820

)