Forwards Insp Rept 50-461/97-17 on 970714-18 & 27-28 & NOV Re Failure to Follow Procedural Requirements for Calibr of Personnel Contamination Monitoring Equipment & for Chemistry Sampling
ML20210R601
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/25/1997
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jackie Cook
ILLINOIS POWER CO.
Shared Package
ML20210R607 List:
References
50-461-97-17, NUDOCS 9709030190
Download: ML20210R601 (3)


See also: IR 05000461/1997017

Text

- - _ _ _ _

1

4

O t.,0

t

i

August 25, 1997

l

Mr. John G. Cook

Senior Vice President

Clinton Power Station

Illinois Power Company

Mail Code V 275

P.O. Box 678

Clinton, IL 61727

SUBJECT:

NRC RADIATION PROTECTION AND CHEMISTRY INSPECTION REPORT

50-461/97017(DRS) AND NOTICE OF VIOLATION

Dear Mr. Cook:

On July 28,1997, the NRC completed an inspection at your Clinton Nuclear Power

Station. The purpose of the inspection was to review the gaseous and liquid radioactive

waste programs, including effluent releases and monitoring. Additionally, the

circumstances surrounding a June 18,1997, event, where a contaminated worker was

released from the station, and ongoing work on the 'A" and "B" racirculation pumps were

also reviewed. The enclosed report presents the results of this inspection.

Overall the gaseous and liquid radioactive waste programs, including effluent releases and

monitoring, were wellimplemented. We noted that the total activity and associated doses

from effluent releases continued to be low and that the radioactive waste systems and

monitors were well maintained. Additionally, good self-assessments by your staff

identified several problems with the planning for the recirculation pump motor work and

inith the control of radioactive sources. Tht success of these initiatives was indicative of

your efforts to improve overall performance.

/

We are concerned, however, with two violations identified during this inspection. One

)

violation was associated with an inadequate survey and subsequent release of a

contaminated worker from the station. Another violation concerned the failure to follow

procedural requirements for the calibrat.on of personnel contamination monitoring

equipment and for chemistry sampling. In particular, we noted that the worker

contamination event lacked comprehensive and thorough follow-up actions. In addition,

the monitor calibration issue was similar to a problem previously identified through your

self-assessment process.

The violations are cited in the enclosed Notice of Violation (Notice) and the circumstances

surrounding them are described in detailin the enclosed report. Please note that you are

required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part,

to determine whether further enforcement action is necessary to ensure compliance with

regulatory requirements.

j

U

9709030190 970825

/

h

R

ADOCK 0500

1

Q

D ]l ,

0

a

-

m

l i5h

-. o

ge

L

J. G. Cook

2

August 25, 1997

in accordance with 10 CFR 2,790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosures will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original Signed by John A. Grobe

John A. Grobe, Acting Director

Division of Reactor Safety

Docket No 50-461

License No. NPF 6

,

Enclosures:-

1. Notice of Violation

{

2. Inspection Report 50 461/97017(DRS)

cc w/encis:

W. D. Romberg, Assistant Vice President

P Yocum, Plant Manager, Clinton Power Station-

R. Phares, Manager, Nuclear Assessment

,

J. Sipek, Director - Licensing

Nathan Schloss, Economist,

Office of the Attorney General

G. Stramback, Regulatory Services

l

Project Manager, General Electric Company

Chairman, DeWitt County Board

L

State Liaison Officer

l

Chairman, Illinois Commerce Commission

!

Distribution:

l

Docket File w!encls

SRIs, Clinton,

Rill Enf, Coordinator w/encls

!

PUBLIC IE-01 w!encls

Dresden, LaSalle,

TSS w/encls

OC/LFDCB w/encls

Quad Cities w/encls .

CAA1 w/encls

l

DRP w/encls

LPM, NRR w/encls

DOCDESK w/encls

i

DRS w/encls

A. B. Beach, Rlli w/encls

!

Rlli PRR w/encls

J. L. Caldwell, Rlli w/encls

!

l'

SEE ATTACHED CONCURRENCES

.

DOCUMENT NAME: A:-

}

To ,eceive a copy of this document, Indicate la the box

'C' = Copy w/o att/enct *E' = Coov w/attienct *N* = No copy

OFFICE

Rlli

Rlli

Rlli

Rllim%}

I

NAME

Orth / Shah:jp-

FBrown

GShear

JGrbW

DATE

08/ /97

08/ /97-

08/ /97

08f}C$7

OFFICIAL RECORD COPY

l

L

.

.

.

_ _ - _ _ _ - _ - _

.-

.

i

J. G. Cook

2

In accordance with 10 CFR 2,790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosures will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

James L. Caldwell

Deputy Regional Administrator

Docket No. 50-401

License No. NPF-6

Enclosures:

1. Notice of Violation

2. Inspection Repvrt No. 50 461/97017(DRS)

cc w/encis:

W. D. Romberg, Assistant Vice President

P. Yocum, Plant Manager, Clinton Power Station

R. Phares, Manager, Nuclear Assessment

J. Sipek, Director - Licensing

'

Nathan Schloss, Economist,

Office of the Attorney General

G. Stramback, Regulatory Services

Project Manager, General Electric Company

Chairman, DeWitt County Board

State Liaisen Officer

Chairman, Illinois Commerce Commission

Distribution:

Docket File w/encls

SRis, Clinton,

Rill Enf Coordinator w/encls

PUBLIC IE-01 w/encls

Dresden, LaSalle,

TSS w/encls

OC/LFDCB w/encts

Quad Cities w/encls

CAA1 w/encls

DRP w/encls

LPM, NRR w/encls

DOCDESK w/encls

DRS w/encls

A, B. Beach, Rill w/encls

Rlli PRR w/encls

J. L, Caldwell, Rlli w/encls

DOCUMENT NAME: A:

,

To receive a copy of this document, hidicate in the box: "C" = Copy without ettechment/ enclosure

"E" = Copy with attachtnant/ enclosure

  • N' = No copy

4

> OFFICE

Rpy)fff

Rill

J

Rill

&

Rlli

Rill

)

NAME

Orth / Shah:jp

FBro4Hg.D

GSDe(@,% JGrobe

/

JCaldwell

DATE

08////97

08j/p7

08fy/97T

08/ /97

(

08/ /97

/

"

OFFICIAL RECORD COPY

v

I